Do I need a permit to renovate a bathroom in Vancouver?

Usually, yes. The City of Vancouver requires a permit to move walls or existing plumbing, electrical or gas lines, but not to replace fixtures in the same place. It reports 92% of simple renovation permits issued within 3 days, and starting without a required permit typically costs double the fee.

The line the City draws is between replacing and relocating. A permit is generally required for "renovation projects that include moving interior walls and/or existing plumbing, electrical, or gas lines", and not required for "replacing fixtures, cabinets, or flooring", painting, or unclogging drains.1

So a bathroom that keeps the toilet, tub and vanity where they are, with new tile, a new vanity and new fixtures in the same positions, can usually proceed without one. A bathroom that moves the toilet, turns a tub into a walk-in shower with a new drain, or adds a circuit for a heated floor needs permits.

The plumbing rule, in the by-law's own words

Vancouver does not follow the BC Building Code; the City regulates under its own Building By-law. Its minor-repair exemption is narrower than "fixtures are fine":

no permit is required to repair or replace a valve, sprinkler head, faucet, fixture, fixture outlet pipe or service water heater, to clear a stoppage, or to repair a leak, if there is no change to any other piping.2

The last clause is the one that matters. Swapping a toilet for a toilet on the same flange is covered. Moving the flange is not.

The City's plumbing permit page says the same thing from the other side: you need a permit to "install, change, or upgrade any part of a plumbing system", and not to repair or replace valves, faucets, or fixtures "as long as they remain in the same location".6

Who can take out the plumbing permit is also restricted. The by-law says the City "shall only issue a permit to construct, extend, alter, renew or repair a plumbing system to a licensed plumbing contractor", with one exception: the owner of a residential building with not more than one principal dwelling unit may get a permit for plumbing work in that building if the owner lives there.2

Electrical is its own permit

An electrical permit is required for all electrical work except replacing defective fuses, receptacles, switches or bulbs with similar units, and minor work covered by an existing annual permit.4 A new bathroom fan circuit, a heated floor or relocated lighting all fall inside it.

In a building with five or more units, a new electrical load over 3,000 watts within a unit also needs the City's New Electric Load Installation form.4

How long the City says it takes

The City's own figures, each on its own clock:

Permit typeCity targetCity-reported resultAs ofSource
Renovation (building)Not stated92% of simple renovation permits issued within three daysJune 9, 202613
PlumbingNot listedNot listed on the City's plumbing permit pagePage read September 10, 20266
Electrical, simple95% issued within 5 business daysTarget met for 95% over the last three monthsSeptember 1, 20264
Electrical, plan review95% issued within 25 business daysTarget met for 93% over the last three monthsSeptember 1, 20264

The electrical results cover the previous three months, and the City notes that times depend on how complete your application is and how quickly you answer its questions.4

Our own measurement is a different quantity, so it sits apart from that table: across every building permit the City issued in 2026, the median time from application to issue was 62 days.5 That includes large and complex files, so it overstates the wait for a simple bathroom and should not be read as one.

What skipping the permit costs

If work that needed a permit is already under way, the City lists a work-without-permit penalty "typically double the original permit fee", a stop while the application is processed, possible removal of finished work, and problems later with a sale or an insurance claim. The homeowner pays these "even if you have hired a contractor who assured you that permits were not needed."1

In a condo, there is a second approval

Strata alterations need the strata corporation's written approval before the work starts, separately from the City. That is set out on its own page.