Home Renovations in Richmond, BC
Kyrax Developments renovates homes across Richmond as a licensed general contractor. Richmond splits the trades unusually — the City issues its own plumbing and gas permits while electrical goes to Technical Safety BC — protects any tree over 20 centimetres, and asks owners to try to move or salvage a house before demolishing it.
A whole-home renovation, permit to final.
Additions & alterations
The City runs one application form for additions and alterations and another for new construction; the scope decides which one the project is on.
Zoning first
Heights, setbacks and permitted uses confirmed against the Zoning Bylaw before a permit application, as the City instructs.
Plumbing
City plumbing permits, where only clearing a stoppage and repairing a leak escape a permit, and the building permit issues first.
Gas & electrical
Gas permits from the City, approved before any gas work begins; electrical permits from Technical Safety BC.
Trees
Tree permits for anything over 20 centimetres at breast height, with the arborist report, tree fencing and replacement planting the bylaw asks for.
Demolition
Where a house comes down, the salvage listing first and the demolition permit after, including for a foundation left behind by a move.
What the City requires.
Three authorities on one project: the City for building, plumbing and gas, Technical Safety BC for electrical, and the tree bylaw over all of it.
| Work | What Richmond requires | Where it says so |
|---|---|---|
| An addition or an interior alteration | City building permit, on the addition and alteration application form revised February 17, 2026 | Residential Building Information |
| A new house or small-scale multi-unit housing | City building permit, on the new construction form | Residential Building Information |
| Energy performance of a new Part 9 home | Step 5 + EL-2, Step 4 + EL-3, or Step 3 + EL-4 since October 31, 2023 | Residential Building Information; bulletin Building-37 |
| Plumbing work | City plumbing permit; only clearing a stoppage and repairing a leak with no replacement are exempt | Building Regulation Bylaw 7230, ss.5.1.1 and 5.1.3 |
| Who may hold the plumbing permit | A licensed contractor with a TQ plumber, or the owner-occupier of a single-family home doing the work personally | Plumbing Permit Application (PC-22) |
| Gas work | City gas permit, approved before work begins; strata approval in a stratified building | Gas Permit Application (PC-14) |
| Larger gas systems outside a single-family home | Over 409,000 BTU on one meter, or over 2 psig at the meter outlet: Technical Safety BC | Gas Permit Application (PC-14) |
| Electrical work | Technical Safety BC, not the City | Technical Safety BC jurisdiction list |
| Removing a tree over 20 cm at breast height | Tree removal permit; separate streams for non-development, demolition or new construction, and rezoning | Tree Protection Bylaw 8057; Tree Removal Permit |
| Topping a tree | Prohibited on private and City property; fines up to $50,000 per tree | Tree Removal Permit |
| Demolishing the house | The City asks you to post it on the House Moving and Salvage List first, public for 60 days, before applying | Demolition, Moving or Salvage Program |
| Moving a building in | A separate building permit application for the new site, submitted before the move; a demolition permit after for the old foundation | Demolition, Moving or Salvage Program |
| Construction hours | 7 a.m. to 8 p.m. weekdays and 10 a.m. to 8 p.m. Saturdays; Sundays and holidays 10 a.m. to 6 p.m. and only an owner or occupier working personally | Noise Regulation Bylaw 8856, s.4.1.1(m) |
| Old permits and drawings | Permit records and survey certificates can be purchased by anyone; drawings only by the registered owner or their agent | Residential Building Information |
| Permit fees | Increase on January 1 each year under the consolidated fees bylaw | Residential Building Information |
Sources: City of Richmond, Residential Building Information, Demolition, Moving or Salvage Program, Tree Removal Permit, Building Regulation Bylaw No. 7230, Plumbing Permit Application, Gas Permit Application and Noise Regulation Bylaw No. 8856; Technical Safety BC, Jurisdiction.
From zoning check to final inspection.
Zoning & trees
What the zone allows, and which trees on the lot are over the bylaw’s 20-centimetre threshold, before any drawing goes far.
Application
The City’s addition and alteration form with its letter of authorization, zoning summary and, where the project needs them, letters of assurance.
Trade permits
City plumbing and gas permits once the building permit is issued, and the Technical Safety BC electrical permit alongside.
Construction
Work inside the noise bylaw’s hours, which on Sundays and holidays rule out contractors entirely.
Inspections & final
City inspections through to final, and Technical Safety BC’s for the electrical.
What's different about renovating in Richmond.
Richmond is one of only two local governments on Technical Safety BC’s list that issue their own gas permits but not electrical, so one project answers to two regulators for its trades.
The threshold is low and the penalties are not: topping is prohibited outright, with fines of up to $50,000 per tree, and the application stream differs depending on whether the removal is tied to a demolition or a rezoning.
Before a demolition permit, the City asks owners to list the house for moving or salvage for 60 days — a step that belongs in the schedule, not at the end of it.
The City describes itself as islands within the Fraser River floodplain, averaging a metre above sea level, protected by 49 kilometres of dikes designed for a one-in-500-year event. Anything that changes a floor level or adds a foundation is worth checking against the City’s flood requirements early.
No two renovations price the same.
We don't publish a flat price for a Richmond renovation, because scope varies too much from one home to the next for a single number to be honest. These are the factors that move the estimate.
Addition or alteration
New floor area puts the project on a different application than an interior alteration, with more drawings behind it.
Two regulators
City plumbing and gas permits and a Technical Safety BC electrical permit, each with its own fee, form and inspection.
Permits & protection
Anything over 20 centimetres needs a permit, and the bylaw’s arborist reports, fencing and replacement planting come with it.
Step code on new builds
A new Part 9 home is held to Richmond’s own step and emissions combination, which drives envelope and mechanical decisions.
Salvage listing
The 60-day salvage listing before a demolition permit is time, and the salvage route itself can change what the teardown costs.
Survey & abatement
If the survey finds asbestos in the materials being disturbed, licensed abatement comes before demolition — a separate contractor and a separate line item.
Answers before you ask.
For anything structural or systems-related, yes, and the City has a form for exactly that: its building permit application for additions and alterations, revised February 17, 2026, sits alongside the one for new construction. The City also publishes A Guide for the Homeowner to help an owner or builder who wants to alter or construct a one or two-family dwelling or accessory building, and tells applicants to confirm heights, setbacks and permitted uses under the Zoning Bylaw before applying. Source: City of Richmond, Residential Building Information, verified September 2026.
The City issues the building, plumbing and gas permits; electrical comes from Technical Safety BC. Technical Safety BC lists Richmond as one of two local governments that issue their own gas permits but not electrical. The City's gas permit must be approved before any gas work begins, needs proof of strata approval in a stratified building, and outside single-family homes the larger systems — over 409,000 BTU on one meter, or over 2 psig at the meter outlet — go to Technical Safety BC instead. Sources: Technical Safety BC, Jurisdiction; City of Richmond, Gas Permit Application Form (revised November 2023), verified September 2026.
Almost always. Richmond's Building Regulation Bylaw requires a plumbing permit for plumbing work and exempts only clearing a stoppage and repairing a leak where no fixture or piping is replaced — there is no exemption for swapping a fixture, unlike Coquitlam or Abbotsford. The permit goes to a licensed plumbing contractor with a TQ plumber, except that the owner-occupier of a single-family home may take one out to do the work personally, and where a building permit applies it has to be issued before the plumbing permit. Sources: City of Richmond, Building Regulation Bylaw No. 7230, sections 5.1.1 and 5.1.3, and Plumbing Permit Application Form (revised November 2023), verified September 2026.
More than the provincial minimum. The City says that since October 31, 2023, all new Part 9 residential buildings must comply with Step 5 plus EL-2, Step 4 plus EL-3, or Step 3 plus EL-4 of the BC Energy and Zero Carbon Step Codes, and points to its own Building-37 bulletin for the detail. That matters on a whole-house project: a new house or a rebuild is held to Richmond's higher combination rather than the provincial floor. Source: City of Richmond, Residential Building Information, verified September 2026.
Very few without a permit. Richmond's Tree Protection Bylaw No. 8057 generally prohibits cutting or removing any tree larger than 20 centimetres in diameter at breast height — measured 1.4 metres above the ground — without a permit, and the City runs separate application streams for a non-development removal, a demolition or new construction, and a site in the rezoning process. Topping a tree is prohibited on both private and City property and can bring fines of up to $50,000 per tree. Arborist reports, tree fencing during demolition and construction, and replacement trees are all covered by the City's bulletins. Source: City of Richmond, Tree Removal Permit, verified September 2026.
Richmond asks you to try to save it first. Before applying for a demolition permit, the City encourages homeowners to post the house on its House Moving and Salvage List, where it stays visible to the public for 60 days so house-moving and salvage companies can make an offer. If a building is moved into or within Richmond, a separate building permit application has to be submitted for the new site before the move, house-moving companies need their own permit to move a house, and after the move the owner is responsible for a demolition permit for the remaining foundation. Source: City of Richmond, Demolition, Moving or Salvage Program, verified September 2026.
Richmond's Noise Regulation Bylaw allows construction noise of up to 85 dBA at 15.2 metres from 7 a.m. to 8 p.m. Monday to Friday and from 10 a.m. to 8 p.m. on Saturdays, other than holidays. On Sundays and holidays it allows construction only from 10 a.m. to 6 p.m., only on a residential building, and only when the owner or occupier does the work personally, so contractors don't work those days. Sources: City of Richmond, Noise Regulation Bylaw No. 8856, section 4.1.1(m), and Bulletin Info-29 (revised August 2025), verified September 2026.
Its own forms, and a zoning check behind them. The City publishes the addition and alteration application form and the new construction form, both revised February 17, 2026, along with a letter of authorization, a zoning regulation summary, a permit transmittal coversheet, a design modification form, and letters of assurance and schedules. It also flags that building permit fees rise on January 1 each year under its consolidated fees bylaw. Source: City of Richmond, Residential Building Information, verified September 2026.
Some of it, and the rest only as the owner. Richmond says permit records and survey certificates are available to purchase without authorization from the property owner, but building drawings are available only to the registered owner of the property or their authorized agent. On an older house that is often the fastest way to find out what was permitted and what was not. Source: City of Richmond, Residential Building Information, verified September 2026.
On our projects, a bathroom renovation runs 4 to 8 weeks and a basement finished as a recreation room 6 to 10 weeks, measured from demolition. That is our own clock and it excludes the permits: Richmond's pages we read give no processing time, and where a building permit applies it has to be issued before the plumbing permit. Sources: City of Richmond, Building Approvals FAQs and Plumbing Permit Application Form, verified September 2026.
WorkSafeBC's guidance is yes. It tells homeowners to get their home tested for asbestos before starting a renovation or demolition project, noting that many older homes contain some form of it, and says any asbestos found must be properly removed or contained before the project can begin; if only some areas will be renovated, only those need to be surveyed. Since January 1, 2024, asbestos abatement contractors must be licensed in BC and their workers trained and certified. Sources: WorkSafeBC, Asbestos: Frequently asked questions for homeowners and New asbestos certification and licensing requirements now in effect, verified September 2026.
Yes. Kyrax Developments Ltd. holds BC Housing Residential Builder Licence #57802, in good standing, as a General Contractor and Developer. On a Richmond renovation that means a single contract for the whole job: we pull the permits, coordinate the trades and book the inspections, and permitted work is inspected the same as any other licensed scope of work. Verify the licence on the BC Housing Licence Registry. Our Richmond bathroom page covers that room in detail.
Ready to renovate your home?
We start with a walkthrough, a scope document, and a straight answer on which permits and approvals apply. Initial consultations are complimentary.
Start a project