Laneway House Builder in Burnaby, BC

Kyrax Developments builds laneway homes in Burnaby in two ways: custom houses built on site, and the site work — foundation, services and crane set — for Kyrax Homes’ factory-built units. Burnaby no longer treats a laneway home as a category of its own. It is permitted through the City’s new-home process as a second residential building, after an Engineering pre-application, and it comes with per-unit development charges, a fire access corridor to the street, and an occupancy certificate before anyone moves in.

(02) — What's included

A laneway home, pre-application to occupancy.

01

Engineering pre-application

The Engineering approval Burnaby requires before it will take a building application, with the topographical survey behind it.

02

Custom or factory-built

A custom house built on site, or a Kyrax Homes factory-built unit on a foundation we build, permitted as a second residential building on the lot.

03

Licence & warranty

Built by a licensed residential builder with home warranty insurance, which BC Housing requires for a standalone laneway home.

04

Services & power

Sewer, storm and water connections set through Engineering, the BC Hydro acknowledgement at 200 amps or more, and transformer space where the project reaches more than three dwelling units.

05

Fire access

The 1.0 m fire access corridor to the street, and an automatic sprinkler system where the home sits more than 45 m from a street lot line.

06

Inspections & occupancy

Every inspection the Building Bylaw lists, the water meter, the final building inspection and the occupancy certificate.

(03) — Burnaby requirements

What the City requires of a laneway home.

What fits on a lot comes from the Zoning Bylaw, and Kyrax Homes keeps a plain-language summary on its Burnaby laneway page. This is the building side: what the City requires once the design is settled, in roughly the order it comes up. One trap: an earlier City laneway summary, still online, asks for a 0.9 m pathway and separate sewer, water and power services; the Zoning Bylaw adopted June 9, 2026 and the Engineering Design Criteria Manual dated July 2026 are the documents we build to.

From the City of Burnaby’s laneway homes, new home construction, development planning, AI PreCheck, development funding and traffic control pages, its zoning, building, waterworks, sewer connection, tree, noise, fees, development cost charge and amenity cost charge bylaws, its Engineering Design Criteria Manual, permit checklists and guides, read September 14, 2026, with BC Housing for the licence and warranty rule. Charges and fees are the City’s own and change when its bylaws do.
StageWhat Burnaby requiresWhere it says so
The permitNo laneway category of its own: the City permits a laneway home through its new-home process, using the application for two residential buildings on a lotLaneway Homes; New Home Construction, Step 3b
Engineering firstAn Engineering pre-application approval before the building application; the City says complete submissions typically take about 15 business days to reviewNew Home Construction, Step 2b
ApplyingOnline through My Permits Portal; paper applications are no longer acceptedNew Home Construction
Development permitGenerally not required on R1 lots, though a Streamside Protection and Enhancement Development Permit may beDevelopment Planning
Optional pre-checkAI PreCheck returns a report on the drawings within 2 business days; laneway homes have been eligible since the pilotAI PreCheck
Who appliesThe owner, or the owner’s agent with an Agent Authorization signed by all owners; a designer or contractor cannot sign Schedule FWho can apply for a building permit
ProfessionalsStructural and geotechnical Schedule B letters from a P.Eng, a sealed topographical survey under 12 months old, and an ISA Certified Arborist reportSubmission checklist, two residential buildings, revised July 2026
BC HydroAn acknowledgement at 200 amps or more, with approval before the permit issues; a Registered Professional’s clearance checklist where overhead lines abut the propertySubmission checklist; Electrical checklist, BC Hydro overhead
Transformer spaceA condition to reserve space for a transformer on projects with more than 3 dwelling units, including a house with a secondary suite and a laneway houseNew Home Construction
SprinklersRequired in a dwelling unit more than 45 m from a lot line abutting a street; permit from a contractor with a Trades Qualification Certificate and a Burnaby or inter-municipal business licenceZoning Bylaw 14815, R1 s.1.1.5.6(1); Fire Protection Sprinkler Permits
Fire access corridorAt least 1.0 m wide, paved or gravel, from the entrance to a lot line abutting a street, or a constructed lane where street access is not feasible, clear to 2.5 mZoning Bylaw 14815, R1 s.1.1.5.6(2)
Sewer, storm and waterA separate service connection for every legal lot, served from the roadway unless gravity service needs more than 4.5 m of depthEngineering Design Criteria Manual, July 2026, ss.4.11, 4.12, 5.9.14
Who builds the connectionThe City lays the sewer connection to the property line and installs water services to within one metre of it, at the applicant’s expense; the owner builds the building sewerSewer Connection Bylaw ss.9, 16; Water Meter Design Guidelines
Connection feesSanitary and storm service connections, single and two family: $13,822 each, in effect January 1, 2026Fees and Charges Bylaw 14485, Schedule C7
Development chargesMedium Density Residential, which names laneway homes: $37,423 development cost charges plus $18,874 amenity cost charge per dwelling unit, collected when the building permit is issuedDCC Bylaw 14645 and ACC Bylaw 14646, Schedule A; Development Funding Program
Trade permitsElectrical, plumbing, gas, heating and fire protection permits applied for by a sub-trades contractor licensed in BurnabyNew Home Construction
TreesWith a development application, trees of 20.3 cm and up are protected; building or demolition permits wait for the tree permit, its fees and any protection fenceTree Bylaw; Tree Permits with Development bulletin
Using the laneA traffic control permit to close a lane: $175 a week on a local road, at least 15 business days to review, up to 8 weeks per permitTraffic Control Permit; Fees and Charges Bylaw 14485
Construction hours7 a.m. to 8 p.m. weekdays, 9 a.m. to 8 p.m. Saturdays, none on Sundays or statutory holidaysNoise Bylaw s.15(1)
InspectionsWith 24 hours’ notice, before concealing: footing forms, the slab, framing with rough wiring and plumbing, insulation and vapour barrier, then the finished buildingBuilding Bylaw 2016, s.21(1)
Moving inA water meter before occupancy, a passed final building inspection after trade finals and tree planting, and a valid occupancy certificateWaterworks Bylaw s.15(4); New Home Construction, Step 6; Building Bylaw s.7(3)
The builderA licensed residential builder and home warranty insurance for a standalone laneway homeBC Housing

Sources: City of Burnaby, Laneway Homes, New Home Construction, Development Planning, AI PreCheck, Who can apply for a building permit, the submission checklist for two residential buildings, the BC Hydro overhead electrical checklist, Zoning Bylaw No. 14815, the Zoning Bylaw rewrite FAQ, Fire Protection Sprinkler Permits, Engineering Design Criteria Manual, Sewer Connection Bylaw, Waterworks Bylaw, Water Meter Design Guidelines, Engineering Reference Guide, Consolidated Fees and Charges Bylaw No. 14485, Development Cost Charges Bylaw No. 14645, Amenity Cost Charges Bylaw, Development Funding Program, Traffic Control Permit, Noise Bylaw, Tree Bylaw, Tree Permits with Development and Building Bylaw 2016; BC Housing, Secondary Suite Incentive Program.

(04) — How we work

From Engineering to the occupancy certificate.

Laneway home framed behind the house
01

Lot & Engineering

The Engineering pre-application, the overhead lines, and whether the site needs the fire corridor to reach a lane or a sprinkler system.

02

Design & documents

A custom design or a Kyrax Homes factory-built unit, the engineers’ letters and arborist report the checklist asks for, and warranty enrolment.

03

Permit & charges

The application through My Permits Portal, the tree permit and fence, and the development and amenity cost charges when the building permit is issued.

04

Build

Foundation, framing and envelope on site, or the foundation, services and crane set for a factory-built unit, with any lane closure under a traffic control permit.

05

Inspections & occupancy

Each inspection before work is covered, the trade finals, the water meter and the trees, then the final building inspection and the occupancy certificate.

(05) — Burnaby considerations

What's different about a laneway home here.

Engineering comes first

Burnaby wants an Engineering pre-application approval before it will accept a building application, and the City says complete submissions typically take about 15 business days to review.

The corridor shapes the siting

Every dwelling unit needs a 1.0 m paved or gravel corridor from its entrance to a street lot line, clear to 2.5 m, and a home more than 45 m from a street lot line must contain an automatic sprinkler system.

Charged like a townhouse

Laneway homes sit in the same Medium Density Residential category as townhouses and multiplexes: $37,423 in development cost charges and $18,874 in amenity cost charges per dwelling unit.

An occupancy certificate

Burnaby’s Building Bylaw does not let anyone occupy a building without a valid occupancy certificate, and the final building inspection waits for the trade finals and the trees.

(06) — What affects cost

No two laneway homes price the same.

We don't publish a price for a Burnaby laneway home, because the lot, the servicing and the way it is built move the number too far for a single figure to be honest. These are the factors that move it.

Method

Custom or factory-built

A house built on site and a factory-built unit set on a foundation share the permit, charges and inspections but split the construction work differently.

Charges

Development & amenity charges

Per dwelling unit, paid when the building permit is issued, with further charges the City collects for other authorities.

Services

Sewer, storm & water

The City’s connection fees, the building sewer on your side of the property line, and a water meter before occupancy.

Fire

Corridor & sprinklers

A paved or gravel access corridor for every home, and sprinklers where the distance to the street calls for them.

Power

Service size & transformer

A BC Hydro acknowledgement at 200 amps or more, and reserved transformer space once a project passes three dwelling units.

Site

Trees & the lane

Protected trees, replacement trees and their security, and weekly fees for any lane closure.

(07) — Common questions

Answers before you ask.

Both. Kyrax Developments builds custom laneway homes on site in Burnaby as the general contractor, and does the site work for Kyrax Homes’ factory-built units: the foundation, the services and the crane set. Either way the City handles the home as a second residential building on the lot, with a building permit, the Building Bylaw’s inspections and an occupancy certificate. Kyrax Homes describes its factory-built models and what Burnaby’s zoning allows on its Burnaby laneway page. Sources: City of Burnaby, New Home Construction and Building Bylaw 2016, sections 7(3) and 21(1), verified September 2026.

Yes. BC Housing says a standalone accessory dwelling unit such as a garden suite or laneway home meets the definition of a new home under the Homeowner Protection Act, so it must be built by a licensed residential builder and covered by home warranty insurance; for a suite built inside the main house, a warranty is at the homeowner’s discretion. Kyrax Developments Ltd. holds BC Housing Residential Builder Licence #57802, in good standing, as a General Contractor and Developer; verify it on the BC Housing Licence Registry. Source: BC Housing, Secondary Suite Incentive Program (closed to new applications since March 31, 2025; its answer on new homes is still published), verified September 2026.

No. Burnaby no longer treats laneway homes as a category of their own: the City permits one through its new-home construction process, using the application for two residential buildings on a lot, submitted online through My Permits Portal, and paper applications are no longer accepted. An Engineering pre-application approval comes first, and the City says complete pre-application submissions typically take about 15 business days to review. A development permit is generally not required on R1 lots, though a lot near a stream may still need a Streamside Protection and Enhancement Development Permit. The City’s optional AI PreCheck, which laneway homes have been eligible for since its pilot, returns a report on the drawings within 2 business days. Sources: City of Burnaby, Laneway Homes, New Home Construction, Development Planning and AI PreCheck, verified September 2026.

Only the owner, or the owner’s agent with an Agent Authorization form signed by all of the owners, can apply for a building permit in Burnaby, and a designer or contractor cannot sign Schedule F, the owner’s undertaking. The City’s checklist for two residential buildings asks for structural and geotechnical Schedule B letters of assurance sealed by a P.Eng, a sealed topographical survey no more than 12 months old, an arborist report by an ISA Certified Arborist, and a BC Hydro acknowledgement where the electrical connection is 200 amps or more. Where overhead power lines abut the property, a Registered Professional completes the City’s clearance checklist. Sources: City of Burnaby, Who can apply for a building permit, Submission checklist for two residential buildings (revised July 2026) and Electrical checklist for existing BC Hydro overhead lines, verified September 2026.

It depends on its distance from the street. Burnaby’s Zoning Bylaw requires an automatic sprinkler system in dwelling units located more than 45 m from a lot line abutting a street. Where one is needed, the fire sprinkler permit comes from a contractor holding a current Trades Qualification Certificate and a City of Burnaby or inter-municipal business licence, with separate plumbing permits for new underground piping and backflow prevention devices, and from January 1, 2027 the City processes those applications only through My Permits Portal. Sources: City of Burnaby, Zoning Bylaw No. 14815, R1 District, section 1.1.5.6(1), and Fire Protection Sprinkler Permits (revised July 30, 2026), verified September 2026.

A corridor from its entrance to the street. The Zoning Bylaw requires every dwelling unit to have a minimum 1.0 m paved or gravel fire access corridor giving direct pedestrian access from the unit’s entrance to a lot line abutting a street, or to a constructed lane where direct access to a street is not feasible, clear of projections or obstructions to at least 2.5 m in height. An earlier City laneway summary, still online, asked for a 0.9 m pathway instead; the current bylaw was adopted on June 9, 2026. Sources: City of Burnaby, Zoning Bylaw No. 14815, R1 District, section 1.1.5.6(2), and the earlier Laneway Homes summary of regulations, verified September 2026.

Through Engineering, lot by lot. Burnaby’s Engineering Design Criteria Manual (July 2026) provides a separate service connection for every legal lot and requires servicing from roadways rather than rear-yard sewers unless gravity service would need more than 4.5 m of depth. The City lays the sewer connection from the public sewer to the property line and installs water services to within one metre of it at the applicant’s expense, while the owner builds the building sewer; the City says sanitary and storm connections generally take 10 to 12 weeks to install and a new water connection 4 to 6 weeks. The fees bylaw lists sanitary and storm service connections for single and two family at $13,822 each, in effect January 1, 2026. Sources: City of Burnaby, Engineering Design Criteria Manual, sections 4.11, 4.12 and 5.9.14, Sewer Connection Bylaw, sections 9 and 16, Water Meter Design Guidelines, Engineering Reference Guide and Consolidated Fees and Charges Bylaw No. 14485, Schedule C7, verified September 2026.

Yes, and it changes the site work. The City says all R1 lots are eligible to build its small-scale multi-unit housing forms without a rear lane. With no lane, the fire access corridor has to run to a lot line abutting a street, and the Engineering Design Criteria Manual expects services to come from the roadway, with rear-yard sewers and pumped connections avoided and needing the City Engineer’s advance approval. Sources: City of Burnaby, Zoning Bylaw rewrite FAQ, Zoning Bylaw No. 14815, R1 District, section 1.1.5.6, and the Engineering Design Criteria Manual, section 4.12, verified September 2026.

Burnaby puts laneway homes in its Medium Density Residential category, alongside townhouses, rowhouses and multiplexes. The Development Cost Charges Bylaw sets $37,423 per dwelling unit in that category and the Amenity Cost Charges Bylaw $18,874, a combined $56,297 in the City’s rate table effective July 1, 2024. The City collects both when the building permit is issued, and it also collects charges on behalf of Metro Vancouver, TransLink and School District 41. Sources: City of Burnaby, Development Cost Charges Bylaw 2024, No. 14645, Schedule A, Amenity Cost Charges Bylaw (consolidated), Development Funding Program and New Home Construction, verified September 2026.

BC Hydro early, and Burnaby-licensed trades. The City places a condition to reserve space on site for a transformer on projects with more than 3 dwelling units, which includes a single detached house with a secondary suite in conjunction with a laneway house, and it leaves applicants to contact BC Hydro before submitting a development application. A BC Hydro acknowledgement is required where the electrical connection is 200 amps or more, with BC Hydro approval before the permit issues. Electrical, plumbing, gas, heating and fire protection permits are applied for by a sub-trades contractor licensed to do that work in the City of Burnaby. Sources: City of Burnaby, New Home Construction and Submission checklist for two residential buildings, verified September 2026.

A traffic control permit for any lane closure, and tree protection before permits issue. Burnaby requires a traffic control permit to close a road, lane, path or sidewalk; a laneway closure on a local road is $175 a week, or $185 a week for a closure of more than six months, the City asks for at least 15 business days to review, and it approves permits for up to 8 weeks at a time. Construction may run from 7 a.m. to 8 p.m. on weekdays and 9 a.m. to 8 p.m. on Saturdays, and not on Sundays or statutory holidays. On a property with a development application, trees of 20.3 cm diameter and up are protected, and demolition or building permits are not issued until the tree permit is issued, its fees are paid and any tree protection fence is installed and approved. Sources: City of Burnaby, Traffic Control Permit, Noise Bylaw, section 15(1), Tree Bylaw and Tree Permits with Development bulletin, verified September 2026.

Inspections, a water meter and an occupancy certificate. Burnaby’s Building Bylaw requires at least 24 hours’ notice for each inspection and acceptance before the work is concealed: the foundation and footing forms, the slab, the framing with rough wiring, gas venting and rough plumbing, the insulation and vapour barrier, and the building when substantially complete. New single family and two-family dwellings must install a water meter before an occupancy permit, the final building inspection follows the electrical, heating, plumbing and gas finals and the planting of retained and replacement trees, and no one may occupy a building without a valid occupancy certificate. Sources: City of Burnaby, Building Bylaw 2016, sections 7(3) and 21(1), Waterworks Bylaw, section 15(4), and New Home Construction, verified September 2026.

Ready to plan a laneway house?

We start with a walkthrough, a scope document, and a straight answer on which permits and approvals apply. Initial consultations are complimentary.