Bathroom Renovations in Maple Ridge, BC
Kyrax Developments renovates bathrooms in Maple Ridge as a licensed contractor. Maple Ridge issues its own electrical and gas permits as well as plumbing permits, and a new Building Bylaw, No. 8097-2026, took effect on July 28, 2026. Under it, replacing a fixture in place needs no plumbing permit but moving or adding one does, and outside a single detached house only a journeyman plumber can take that permit out.
A full bathroom renovation, start to finish.
Plan & permits
Which fixtures stay or move, whether walls change, and the plumbing, electrical and gas permits the City issues for each.
Hazardous materials check
The provincial check before anything is disturbed, and the assessment the City asks for in a house built before 1990.
Plumbing rough-in
Drain, waste and vent lines filled with water and holding, and water lines under a 200 psi test, inspected before framing.
Electrical & gas
Rough-in wiring and any gas piping inspected before framing, under the City’s own electrical and gas permits.
Tub, waterproofing & tile
An optional pre-insulation inspection where a tub would block access, then membranes, tile and glass.
Fixtures & finals
Fixtures in, then the plumbing, electrical and gas final inspections ahead of the final building inspection.
Which permits a Maple Ridge bathroom can need.
Maple Ridge handles every trade permit itself, so a bathroom that moves fixtures, adds a circuit and changes a gas line deals with one City for all three, under a building bylaw that is only weeks old.
| Work | What Maple Ridge requires | Where it says so |
|---|---|---|
| Permits | A permit before construction the bylaw regulates, which includes alterations and plumbing, mechanical, electrical and gas work; a permit before installing mechanical or electrical equipment | Building Bylaw 8097-2026 ss.2.1, 5.1, 10.2(e), 13.1 |
| Replacing a fixture | No plumbing permit to replace fixtures that comply, repair leaks in water pipes, or clear blockages through clean-outs | Bylaw 8097-2026 s.13.5 |
| Moving or adding fixtures | A plumbing permit for any installation, addition or alteration to plumbing systems | Building Permits & Inspections |
| Who takes out the plumbing permit | A journeyman plumber with a City business licence, or the owner and intended occupier of a single detached dwelling doing all the work | Bylaw 8097-2026 ss.13.8, 13.9 |
| Toilets | High-efficiency or dual-flush toilets required since October 3, 2011 in new residential buildings or when renovations occur, per the City’s plumbing permit form | Plumbing and sprinkler permit application |
| Electrical and gas | Issued by the City: an electrical permit whenever electrical work is performed, a gas permit for new or altered gas appliances, piping and venting; like-for-like device swaps as the Electrical Safety Regulation allows | Technical Safety BC jurisdiction list; Building Permits & Inspections; ESR s.18 |
| Homeowner trade permits | Fully detached dwellings only; for gas, no one paid for the work and no part of the home rented | ESR s.17; Gas Safety Regulation s.24 |
| Built before 1990 | A hazardous materials assessment, per the City; before any renovation, a qualified person’s inspection for hazardous materials, per the provincial regulation | Home Improvements; OHS Regulation s.20.112 |
| Condo or strata | A letter of authorization from strata management with the application; a Consent to Construct form in multi-residential buildings; trade permits through licensed trade contractors | Home improvement application; Commercial Renovations page; Consent to Construction form |
| Applying | Through the City’s online portal, with a title search dated within 30 days and the registered covenants and charges | Home Improvements; Bylaw 8097-2026 s.11.2 |
| Booking inspections | At least 24 hours ahead; a person 19 or older present during renovation inspections | Bylaw 8097-2026 s.12.5; Inspections & Results |
| Rough-in | Drain, waste and vent filled with water and holding; water piping under a 200 psi test; plumbing, electrical and gas rough-ins inspected before framing | Required Plumbing Permit Inspections; Bylaw 8097-2026 ss.12.11, 12.12, 12.14 |
| Pre-insulation | An optional inspection where equipment such as a bathtub would block access later | Required Building Inspections |
| Plumbing permit fee | $103 minimum; $23.69 for the first fixture, $22.66 each additional, $12.36 per roughed-in location; doubled if work starts before the permit | Fees & Charges Bylaw 7575-2019, consolidated June 30, 2026; Bylaw 8097-2026 s.20.3 |
| Permit life | Expires if not started within six months of issue, discontinued for six months, or not completed with a final inspection within 24 months, unless extended | Bylaw 8097-2026 s.11.15 |
| Construction hours | 7 a.m. to 9 p.m. Monday to Saturday, none on Sundays or statutory holidays; quiet indoor work at any time | Noise Control By-law 5122-1994 s.6; Temporary Construction Noise |
Sources: City of Maple Ridge, Building Bylaw No. 8097-2026, Fees & Charges Bylaw No. 7575-2019, Noise Control By-law No. 5122-1994, Home Improvements, Building Permits & Inspections, Inspections & Results, Commercial Renovations, Temporary Construction Noise, Required Plumbing Permit Inspections, Required Building Inspections, the home improvement permit application, the Consent to Construction form, the plumbing and sprinkler permit application, the homeowner plumbing permit application, the contractor electrical permit application and the notice of fee changes; Technical Safety BC, Jurisdiction; Province of British Columbia, Electrical Safety Regulation, Gas Safety Regulation, Occupational Health and Safety Regulation and 2024 BC Codes.
From walkthrough to final inspection.
Walkthrough & year built
Which fixtures stay or move, whether walls change, and whether the house pre-dates 1990.
Permits
The application through the City’s portal with a recent title search, the strata letter for a condo or townhouse, and the trade permits.
Demolition & rough-in
The hazardous materials check first, then plumbing, electrical and gas rough-ins, each inspected before framing.
Tub, waterproofing & tile
An optional pre-insulation inspection where the tub blocks access, then membranes and tile.
Fixtures & finals
Fixtures installed, the trade finals passed, then the final building inspection.
What's different about a Maple Ridge bathroom.
Building Bylaw No. 8097-2026 replaced the 2012 bylaw on July 28, 2026; complete applications and permits from before then stay under the old one.
Replacing a compliant fixture, fixing a leak in a water pipe or clearing a blockage needs no plumbing permit; moving or adding a fixture does.
Maple Ridge issues electrical and gas permits itself, so the plumbing, electrical and gas inspections all come from the City.
Homeowner plumbing permits are limited to single detached dwellings, so a condo or townhouse bathroom’s plumbing permit goes through a journeyman plumber.
No two bathroom renovations price the same.
We don't publish a price for a Maple Ridge bathroom, because the house, the fixtures and the finish move the number too far for a single figure to be honest. These are the factors that move it.
Fixtures stay or move
Moving a toilet, tub or vanity means new drain, vent and water runs, each tested at rough-in.
Fixture count
The City’s plumbing fee is set per fixture and per roughed-in location, above a minimum.
Built before 1990
The hazardous materials assessment, and any abatement before work that could disturb what it finds.
Rough-in inspections
Water and pressure tests before framing, and an extra pre-insulation inspection where a tub blocks access.
Circuits, fans & gas
New circuits, heated floors, a new fan or a gas line, each under a City trade permit.
Condo conditions
The strata’s letter of authorization and licensed trades for every permit.
Answers before you ask.
For most bathroom work, yes. Maple Ridge’s Building Bylaw No. 8097-2026 requires a permit before any construction it regulates, defines construction to include alteration and work involving plumbing, mechanical, electrical or gas systems, and requires a permit before installing mechanical or electrical equipment. The City says a plumbing permit is required for any installation, addition or alteration to plumbing systems. The same bylaw lists what needs no plumbing permit: repairing leaks in water pipes, replacing plumbing fixtures where the fixtures and their installation comply with the bylaw and provincial rules, and clearing blockages through clean-outs without cutting a pipe. Sources: City of Maple Ridge, Building Bylaw No. 8097-2026, sections 2.1, 5.1, 10.2 and 13.5, and Building Permits & Inspections, verified September 2026.
Not for a straight replacement. The Building Bylaw says a plumbing permit is not required to replace plumbing fixtures, provided the fixtures and their installation comply with the bylaw and applicable provincial enactments. Moving a fixture or adding one is different: the City says a plumbing permit is required for any installation, addition or alteration to plumbing systems. On toilets, the City’s plumbing and sprinkler permit application says high-efficiency or dual-flush toilets have been required since October 3, 2011 in new residential buildings or when renovations occur; its homeowner plumbing form says when major renovations occur. Sources: City of Maple Ridge, Building Bylaw No. 8097-2026, section 13.5, Building Permits & Inspections, and the plumbing and sprinkler permit application and homeowner plumbing permit application, verified September 2026.
A journeyman plumber or, in a house, its owner. Building Bylaw No. 8097-2026 says a plumbing permit may only be issued to a plumber holding a valid British Columbia journeyman plumber qualification and a valid City business licence, or to the owner of a single detached dwelling where the owner, as intended occupier, carries out all of the plumbing work. Where a homeowner is found incompetent to complete the work or in violation of a permit condition, the permit may be revoked and a qualified plumber must be retained to finish the work under a new permit. A condo or townhouse bathroom is not a single detached dwelling, so its plumbing permit goes through a qualified plumber. Source: City of Maple Ridge, Building Bylaw No. 8097-2026, sections 13.8 and 13.9, verified September 2026.
The pipes, wiring and gas lines before anything covers them. The Building Bylaw has plumbing rough-in inspected after completion and before framing, and electrical rough-in wiring and gas piping, venting and appliance connections on the same timing, with the plumbing final completed before the final building inspection; every inspection has to be requested at least 24 hours ahead. The City’s plumbing inspection guide wants the drain, waste and vent rough-in filled with water and holding, and the water piping placed under a 200 psi test. Its building inspection guide holds the framing inspection until the plumbing, gas, electrical and sprinkler rough-ins have passed, and offers an optional pre-insulation inspection where equipment such as a bathtub would block access. For renovations, a person at least 19 years old must be present while inspections are carried out. Sources: City of Maple Ridge, Building Bylaw No. 8097-2026, sections 12.5, 12.11, 12.12 and 12.14, Required Plumbing Permit Inspections, Required Building Inspections and Inspections & Results, verified September 2026.
The City does. Technical Safety BC lists the City of Maple Ridge among the local governments that issue their own electrical and gas permits, and the City says an electrical permit is required whenever electrical work is performed, from new wiring to rearranged circuits, and a gas permit for new installations or alterations to gas appliances, piping and venting. The provincial Electrical Safety Regulation still lets an individual replace devices such as receptacles, switches, dimmers and fan speed controllers with ones of a similar type or rating without a permit. Homeowner permits are for a fully detached dwelling only, and for gas the regulation adds that no one is paid to do the work and no part of the home is rented; electrical contractors applying to the City need a Maple Ridge or inter-municipal business licence. Sources: Technical Safety BC, Jurisdiction; City of Maple Ridge, Building Permits & Inspections and the contractor electrical permit application; Province of British Columbia, Electrical Safety Regulation, sections 17 and 18, and Gas Safety Regulation, section 24, verified September 2026.
It is priced by fixture, with a minimum. Maple Ridge’s Fees & Charges Bylaw, consolidated to June 30, 2026, sets a minimum of $103 for any plumbing permit or inspection, then $23.69 for the first fixture, $22.66 for each additional fixture and $12.36 for each roughed-in fixture location, plus $48.41 per dwelling unit where the permit is for other than a single detached dwelling. Finishing plumbing only, where the rough-in already exists, is assessed at 50% of the usual fee. The Building Bylaw doubles the permit fee if construction starts before the permit is issued, and since June 3, 2026 the City takes card payments up to $100,000 with a non-refundable 2% merchant fee. These are the City’s fees, not a Kyrax price. Sources: City of Maple Ridge, Fees & Charges Bylaw No. 7575-2019, Building Bylaw No. 8097-2026, section 20.3, and the notice of fee changes, verified September 2026.
A check comes first, and the City singles out houses built before 1990. Its Home Improvements page says a hazardous materials assessment will need to be completed for houses constructed prior to 1990, to identify asbestos and other hazardous materials commonly used in construction before then. The binding rule is provincial: under the Occupational Health and Safety Regulation, before renovation work begins the employers responsible for it and the owner must ensure a qualified person inspects the building to identify hazardous materials, and work that may disturb them waits until they are safely contained or removed. Sources: City of Maple Ridge, Home Improvements; Province of British Columbia, Occupational Health and Safety Regulation, section 20.112, verified September 2026.
The strata’s written approval, and licensed trades. The City’s home improvement permit application asks whether the property is stratified and, if it is, requires a letter of authorization from strata management, signed by the strata’s signing authority and approving the scope of work for that specific unit, at the time of application. For renovations in multi-residential buildings, the City’s tenant and landlord improvement page uses a Consent to Construct form signed by the strata or property manager, and says the electrical, plumbing, gas and sprinkler permits must be obtained by a certified trade contractor licensed in Maple Ridge or holding an inter-municipal licence, after the building permit is issued. Homeowner plumbing permits are limited to single detached dwellings. Sources: City of Maple Ridge, the home improvement permit application, Commercial Renovations (Tenant/Landlord Improvement Permits), the Consent to Construction form and Building Bylaw No. 8097-2026, section 13.8, verified September 2026.
Between 7 a.m. and 9 p.m., Monday to Saturday. Maple Ridge’s Noise Control By-law bars commercial or industrial construction, alteration or repair work that disturbs anyone in a residential zone between 9 p.m. and 7 a.m. from Monday to Saturday, and all day on Sundays and statutory holidays, unless a by-law enforcement officer gives prior written consent. The City adds that construction done quietly indoors that doesn’t disturb neighbours, such as painting or electrical installation, is permitted at any time. Sources: City of Maple Ridge, Noise Control By-law No. 5122-1994, sections 6 and 7, and Temporary Construction Noise, verified September 2026.
On our projects, a bathroom renovation runs 4 to 8 weeks, measured from demolition. That is our own clock, and the City’s steps sit around it: the application goes in through its online portal with a title search dated no more than 30 days before, each inspection is requested at least 24 hours ahead, and a permit expires if the work is not started within six months of issue, is discontinued for six months, or is not completed with a passed final inspection within 24 months, unless extended. Sources: City of Maple Ridge, Home Improvements and Building Bylaw No. 8097-2026, sections 11.2, 11.15 and 12.5, verified September 2026.
Building Bylaw No. 8097-2026, for most new applications. It came into force on its adoption on July 28, 2026 and repealed Building Bylaw No. 6925-2012, and it does not apply to an application submitted and deemed complete, a permit issued, or work lawfully under way on a permit issued before that date. One practical change: the new bylaw lets a permit expire after six months of discontinued work, while some City inspection guides still say construction must not be discontinued for more than 12 months. The 2024 BC Building Code applies to building permits applied for after March 8, 2024. Sources: City of Maple Ridge, Building Bylaw No. 8097-2026, sections 11.15, 24.1, 24.2 and 25, and Required Building Inspections; Province of British Columbia, 2024 BC Codes, verified September 2026.
Yes. Kyrax Developments Ltd. holds BC Housing Residential Builder Licence #57802, in good standing, as a General Contractor and Developer, and bathroom renovations that need permits are pulled and inspected like any other licensed scope of work; verify the licence on the BC Housing Licence Registry. Bathrooms elsewhere in the region have their own pages for Coquitlam, Langley and Abbotsford.
Ready to renovate your bathroom?
We start with a walkthrough, a scope document, and a straight answer on which permits and approvals apply. Initial consultations are complimentary.
Start a project