Bathroom Renovations in Richmond, BC
Kyrax Developments renovates bathrooms in Richmond as a BC Housing licensed residential builder and developer, licence #57802. Richmond is stricter than its neighbours in one way that changes every bathroom plan: its bylaw exempts only clearing stoppages and repairing leaks, so replacing a toilet, basin, tub or water heater — even like for like — needs a plumbing permit, where Burnaby, Vancouver and both North Vancouvers would need none. The permit itself is modest at $33 a fixture; the re-inspections are where it gets expensive.
Every swap is on the permit.
The fixture list
Every fixture replaced or added, and the water heater, counted for the plumbing permit.
Permit order
A building permit first wherever walls, floors, ceilings or the layout change.
Drawings
Drains, traps and fixtures located, with a sectional drawing where the inspector asks.
Three permitting bodies
City plumbing and gas; Technical Safety BC for the electrical.
Rough-in, right first time
Re-inspections start costing at the third visit and double after the fifth.
Older materials
Asbestos testing in an older house before anything is opened up.
What the bylaw asks of a bathroom.
Richmond keeps plumbing, gas and building as three separate permits with three separate fees, and it reads its plumbing exemption narrowly. That combination is why a Richmond bathroom plan starts from the permit list, not the finish schedule.
| The work | What Richmond requires | Where it says so |
|---|---|---|
| A fixture replaced like for like | A plumbing permit — the only exemption is for clearing stoppages and repairing leaks that involve no replacement or rearrangement | Bylaw 7230 ss.5.1.1(c), 5.1.3 |
| A leak or a blockage | No permit, provided no valve, pipe, fixture or hot water tank is replaced or rearranged | Bylaw 7230 s.5.1.3 |
| A water heater replaced | A plumbing permit; a City gas permit as well if it is gas-fired | Bylaw 7230 ss.5.1.1(b), 5.1.3 |
| Walls or layout changed | A separate building permit, which must issue before the plumbing permit | Plumbing application form |
| Separate permits | Each building, all gas work and all plumbing on separate applications, permits and fees | Bylaw 7230 s.5.2.1 |
| Plans | When required, three sets showing every building drain, trap, sump and fixture, plus a sectional drawing of soil, waste and vent pipes | Bylaw 7230 s.5.3.1(f) |
| Who does the work | A plumber with a Trades Qualification and a Richmond business licence, or a single-family owner-occupier personally, with a declaration | Plumbing application form |
| Plumbing fee | $33 per fixture, $87.50 minimum | Fees Bylaw 8636 |
| Re-inspections | $106 at the third inspection, $145 at the fourth, $280 at the fifth, then double each time | Fees Bylaw 8636 |
| Transfer or extension | $87.50 or 10% of the original plumbing fee, whichever is greater | Fees Bylaw 8636 |
| Out-of-hours inspection | $592, plus $154 an hour after the first four hours | Fees Bylaw 8636 |
| Electrical | A provincial permit from Technical Safety BC — Richmond holds the gas delegation only | Technical Safety BC, Jurisdiction |
| Backflow preventer | Tested annually from its final inspection once installed | Bylaw 7230 s.13.5 |
Sources: City of Richmond, Richmond Building Regulation Bylaw No. 7230 (consolidated with Bylaw No. 10572), Consolidated Fees Bylaw No. 8636 (consolidated through Bylaw No. 10720, November 10, 2025) and the Plumbing Permit Application Form (revised November 17, 2023); for comparison, Burnaby Plumbing Bylaw, City of Vancouver Plumbing permit, City of North Vancouver Bylaw 7390 and District of North Vancouver Bylaw 8271; Technical Safety BC, Jurisdiction; WorkSafeBC, Asbestos.
Permits in order, then the rough-in.
List the fixtures
Every swap and addition, plus the water heater if it is being replaced.
Building permit first
Where the layout or walls change, issued before the plumbing permit.
Plumbing and gas
City permits for both; a provincial electrical permit for the wiring.
Rough-in inspection
Done carefully, because the third visit onward carries a fee.
Finish and final
Tile and fixtures, then the final inspections on each permit.
Four Richmond rules worth knowing early.
A like-for-like toilet or basin still needs a plumbing permit here, unlike next door.
Replacing a hot water tank is outside the exemption, and a gas one needs a gas permit.
A plumbing permit cannot issue until any building permit for the same work has.
After the fifth inspection, each one costs twice the last, with no cap.
Where a Richmond bathroom’s cost comes from.
We don’t publish a price per bathroom. These are the Richmond-specific things that move it.
More of them
Plumbing on every swap, gas for a gas heater, and a building permit when the room changes.
Getting it right
Re-inspection fees start at the third visit and double after the fifth.
What moves
New drain locations mean drawings, and more work behind the wall.
The heater
A replacement brings its own plumbing permit, and a gas permit if gas-fired.
Older materials
Asbestos testing, and abatement where it turns up, before demolition.
Tile, glass, fittings
The widest range of all, and the part most under your control.
Why Richmond is different.
Yes — and that makes Richmond unusual. Its Building Regulation Bylaw says every owner must obtain a plumbing permit before undertaking any plumbing, and its only exemption is narrow: a permit is not required “for the clearing of stoppages or the repairing of leaks in pipes, valves or fixtures, when such repairs do not involve or require the replacement or rearrangement of valves, pipes or fixtures or hot water tanks.” Replacing a fixture is not in that sentence. So a like-for-like toilet, basin or tub swap needs a plumbing permit in Richmond, where in Burnaby, Vancouver and both North Vancouvers the same swap needs none. It is the single most useful thing to know before planning a Richmond bathroom. Sources: City of Richmond, Richmond Building Regulation Bylaw No. 7230, sections 5.1.1(c) and 5.1.3, read on September 21, 2026.
Richmond is the strict one. We read each municipality’s own text the same day. Burnaby’s Plumbing Bylaw says a permit is not required to replace or repair a plumbing fixture, valve or faucet. Vancouver needs no permit to repair or replace fixtures “as long as they remain in the same location”. The City of North Vancouver exempts “the replacement of fixtures”. The District of North Vancouver exempts replacing tubs, showers, toilets, lavatories or sinks where nothing is rearranged. Richmond exempts only clearing stoppages and repairing leaks — and only where no fixture is replaced. A homeowner who has swapped a toilet without a permit in Burnaby may reasonably assume the same in Richmond, and would be wrong. Sources: Burnaby Plumbing Bylaw s.8(2); City of Vancouver, Plumbing permit; City of North Vancouver Bylaw 7390 s.8.14.1; District of North Vancouver Bylaw 8271 s.3.3.7; Richmond Building Regulation Bylaw No. 7230 s.5.1.3; all read on September 21, 2026.
A plumbing permit, yes, and a gas permit too if it burns gas. The same exemption sentence that excludes fixtures also excludes hot water tanks: the carve-out for stoppages and leaks only applies where the work does not involve the replacement or rearrangement of valves, pipes, fixtures “or hot water tanks”. The City’s plumbing application lists a hot water tank as a fixture in its own right. For a gas-fired heater, Richmond issues its own gas permits — Technical Safety BC lists the City of Richmond among the municipalities delegated gas, though not electrical — and the bylaw requires a gas permit before any gas work. Sources: City of Richmond, Richmond Building Regulation Bylaw No. 7230, sections 5.1.1(b) and 5.1.3, and the Plumbing Permit Application Form; Technical Safety BC, Jurisdiction, read on September 21, 2026.
Modest, and priced per fixture. The Consolidated Fees Bylaw sets $33 for the installation of each plumbing fixture, with a minimum plumbing fee of $87.50 — so a bathroom with a toilet, basin and shower is three fixtures, or $99, above the minimum. Transferring or extending a plumbing permit costs $87.50 or 10% of the original plumbing fee, whichever is greater. Plan review for design changes is $154 an hour, a special inspection during business hours $154, and a provisional plumbing compliance inspection $180 a visit. These are the City’s fees, not a price for the work, and a separate plumbing permit is needed alongside any building permit. Sources: City of Richmond, Consolidated Fees Bylaw No. 8636 (consolidated through Bylaw No. 10720), Plumbing Permit Fees schedule, read on September 21, 2026.
Nothing at first, then steeply more. Richmond’s plumbing re-inspection fee begins at the third inspection: $106 for the third, $145 for the fourth and $280 for the fifth, and the schedule says the fee for each inspection after the fifth “will be double the cost of each immediately previous inspection.” That doubling has no cap written into it, so a rough-in that keeps failing becomes expensive quickly. An inspection outside the City’s normal business hours is $592, plus $154 for each hour beyond the first four. Getting the rough-in right before the inspector arrives is cheaper than any of these. Sources: City of Richmond, Consolidated Fees Bylaw No. 8636, Plumbing Re-Inspection Fee and Special Inspections, read on September 21, 2026.
Enough to see every drain. When the plumbing inspector requires plans, the bylaw asks for “a minimum of three complete sets of plans showing the location and size of every building drain and every trap, sump, and plumbing fixture that is on a building drain, and a sectional drawing showing the size and location of every soil or waste pipe, trap and plumbing vent pipe.” The application itself must be signed by the owner, state the intended use of the space, and carry any other information the inspector needs to be satisfied the work will comply. The City’s form adds that it must be fully completed and approved before any plumbing work or changes to an interconnected plumbing system. Sources: City of Richmond, Richmond Building Regulation Bylaw No. 7230, section 5.3.1, and the Plumbing Permit Application Form (revised November 17, 2023), read on September 21, 2026.
The building permit, whenever the room itself changes. Richmond’s plumbing application says that changes to floor plan layout, or adding, altering or removing walls, floors and ceilings, need a separate building permit, and “any applicable Building Permit must be issued prior to Plumbing Permit issuance.” The bylaw keeps the trades separate too: each building, all gas work and all plumbing must be the subject of separate permit applications and separate permits, each with its own fee. A bathroom that moves a wall and a drain therefore runs two permits in a fixed order, and the plumbing cannot start on the strength of the building permit alone. Sources: City of Richmond, Richmond Building Regulation Bylaw No. 7230, section 5.2.1, and the Plumbing Permit Application Form, read on September 21, 2026.
Only in your own single-family home, personally, with a declaration. The City’s application states that all inside plumbing work “must be done by a plumber holding a Trades Qualification (TQ) and a current Richmond Business License”, in compliance with the BC Plumbing Code, “except in the case of a single family dwelling home owner/occupier, who personally does the work and signs a declaration”. The form asks for the business licence or inter-municipal licence number and the TQ holder’s details. A duplex, a strata unit, a rental or work done by a friend on the owner’s behalf falls outside the homeowner route. Sources: City of Richmond, Plumbing Permit Application Form, read on September 21, 2026.
Technical Safety BC, not the City. Richmond holds the gas delegation but not the electrical one, so lighting, outlets, the fan circuit and an electric heated floor all run on a provincial electrical permit, while a gas appliance runs on a City gas permit. That split is the reverse of what some Richmond homeowners expect from the City handling their plumbing, and it means a bathroom with new wiring and a new gas heater can involve two different permitting bodies as well as the City’s plumbing permit. Sources: Technical Safety BC, Jurisdiction, and City of Richmond, Richmond Building Regulation Bylaw No. 7230, section 5.1.1, read on September 21, 2026.
An annual test, once one is installed. The bylaw requires the owner of a parcel with a backflow preventer to have it tested annually from the date of its final inspection, and the fees bylaw charges $29 for the test report decal. Backflow preventers appear on the City’s plumbing application as fixtures in their own right, with their size and type recorded. Most bathroom renovations don’t add one, but some fixtures and irrigation or boiler connections do, and when they are installed the testing obligation follows the property rather than the contractor. Sources: City of Richmond, Richmond Building Regulation Bylaw No. 7230, section 13.5, the Consolidated Fees Bylaw No. 8636 and the Plumbing Permit Application Form, read on September 21, 2026.
In an older house, plan on it. WorkSafeBC says anyone who repairs, renovates or demolishes older buildings in British Columbia is at risk from asbestos fibres, which turn up in bathrooms in older sheet flooring, tile adhesive and drywall compound. Where asbestos is found, a qualified abatement contractor must remove it, a qualified person must certify afterwards that the worksite air is safe, and a notice of project goes to WorkSafeBC. We test before demolition rather than after the first tile comes up. Sources: WorkSafeBC, Asbestos, read on September 21, 2026.
Yes. Kyrax Developments is a BC Housing licensed residential builder and developer, licence #57802, in good standing as a General Contractor and Developer, verifiable on the BC Housing Licence Registry. In Richmond that means planning for a plumbing permit even on a straight swap, sequencing any building permit ahead of it, and getting the rough-in right before the third inspection starts costing money. We don’t publish a price per bathroom. For whole-house work in the city see our Richmond home renovation page. Every rule here is quoted from the City’s bylaw, fees bylaw and application form, read on September 21, 2026; the City’s documents govern.
Ready to renovate your bathroom?
We start with a walkthrough, a scope document, and a straight answer on which permits and approvals apply. Initial consultations are complimentary.