Tenant Improvement Contractor in Vancouver, BC
Kyrax Developments is a commercial contractor for tenant improvements in Vancouver, building fit-outs for tenants and landlords, including work phased around occupied buildings. The City runs its own lanes for this work: an office fit-out in an eligible building can use its Tenant Improvement Program and a small renovation a field review, the Vancouver Building By-law sets fire, structural and accessibility upgrades by the type of renovation, and the space is not occupied until the City issues an occupancy permit.
A fit-out, lease to occupancy.
Space & permit lane
The building’s permit history, and whether the job fits the Tenant Improvement Program, a field review or a full building permit review.
Drawings & professionals
Drawings with the by-law analysis and the exiting for every tenant space on the floor, and the registered professionals a Part 3 building calls for.
By-law upgrades
The fire and life safety, structural, non-structural and accessibility upgrades the by-law ties to a minor or major renovation or a change of occupancy.
Trades & systems
Electrical, plumbing, gas, sprinkler and mechanical permits through licensed trade contractors, sequenced with the building permit.
Food service
Health authority plan approval, the grease interceptor on the drawings and the kitchen exhaust package, where food is prepared.
Occupied buildings & handover
Work phased around a building that stays open, then the final inspection and the occupancy permit before the space opens.
What Vancouver asks of a fit-out.
A Vancouver fit-out is shaped by the permit lane it can use, the upgrade level its scope triggers, and the trade and health approvals around it.
| Topic | What Vancouver requires | Where it says so |
|---|---|---|
| Permit | Needed before any work the by-law regulates, and renovating a commercial space is on the City’s list; work started without one pays double the fee, up to $20,000 and never less than $500; work starts within six months of issue | VBBL 2025 Div. C 1.6.1.1, 1.6.1.2; When you need a permit; Get a building permit |
| Tenant Improvement Program | For office tenants in listed commercial buildings, including any office building whose permit was applied for after January 31, 2007: no new development permit, first contact aimed within 5 to 10 business days, permit within 1 to 2 business days of a passed inspection | Tenant Improvement Program page |
| Not in TIPs | Assembly occupancies that add occupant load, affect exiting or touch kitchens or washrooms; changes in major occupancy; floor area additions, mezzanines included; most major renovations; interconnecting floors, fire alarm, sprinkler or seismic upgrading | Tenant Improvement Program page |
| Field review | An alternative way to issue a permit for small renovations needing no major upgrading, issued once the site inspection passes; a change between Group D and E, or to a small suite, may be acceptable | Field review page; Commercial Renovation Centre; Field Review and TIPs checklist, June 2026 |
| Development permit | Not needed to switch among office, retail, health care office, barber or beauty salon and beauty and wellness uses up to 300 m²; needed first for relaxations or particular land uses, and for food service where there was never a commercial kitchen | Zoning and Development By-law 4.8.1(n); Get a building permit; Restaurant kitchen ventilation page |
| Renovation type | Minor renovation: one suite in a single tenant space and its shared demising walls. Major renovation: multiple suites or other work | VBBL 2025 Div. B 11.1.2.1 |
| Upgrade levels | Minor renovation F1, S2, N1, A2; major renovation F2, S2, N3, A3, for fire and life safety, structural, non-structural and accessibility | VBBL 2025 Div. B 11.5.2.1, Flow Chart No. 1 |
| Where upgrades stop | None further without an addition or change in major occupancy where the building was built or fully upgraded under a permit issued from May 1, 2007; no structural or non-structural upgrading under $255,000; upgrades may stay within renovated suites when fire separations are untouched | VBBL 2025 Div. B 11.1.4.2 |
| Other suites and lighting | Altering one suite triggers no upgrades in other suites unless it creates a non-conformity there; existing lighting above the ASHRAE 90.1-2016 power density is removed in the project | VBBL 2025 Div. B 11.1.3.1, 11.1.4.3 |
| Change of major occupancy | No Flow Chart No. 2 upgrades for a single Group D or E suite within the lesser of half the building area or 300 m² and Table 11.5.4.1.(2); the whole building to F4, S4, N4, A4 where five-year changes pass 50% of a one-storey building or 100% of a taller one | VBBL 2025 Div. B 11.5.4.1, Flow Chart No. 2 |
| Professionals | Schedule A and B letters of assurance where registered professionals are required, including architectural and electrical work in a Part 3 building | VBBL 2025 Div. C 2.2.7; Commercial Building Renovation checklist, March 2026 |
| Application details | A separate permit for each floor of a commercial renovation; a building permit data sheet for the first fit-out of a new shell space; exiting shown for every tenant space on the floor | Field Review and TIPs checklist, June 2026 |
| Undertaking | An owner’s undertaking before a permit issues; a tenant files the owner’s and tenant’s undertaking, Schedule E-2 | VBBL 2025 Div. C 1.4.1.8; Field review page |
| Trade permits | Electrical, gas, plumbing and sprinkler permits applied for by contractors with a City or inter-municipal business licence; a mechanical permit for heating and cooling in any commercial building; gas to Technical Safety BC above 14.0 kPa or 120 kW on a commercial meter | Electrical, gas, plumbing, fire sprinkler and mechanical permit pages |
| Fire alarm and sprinklers | An electrical permit application before the building permit application for a fire alarm installation or upgrade; tenant improvements eligible for the sprinkler Fast Track, with some permits issued within 24 hours | Fire alarm checklist; Fire sprinkler permit page |
| Charges | No development cost levy for an alteration adding no floor area or a change such as office to retail, but new floor area is levied; the amenity cost charge from September 30, 2026 excludes renovation adding no floor area, and sets $32.29 per m² for commercial | DCL Bulletin ss.4.4, 6.1, 6.2; ACC By-law 14816 ss.1.2, 3.8, Table B |
| Permit fee | Set by the estimated cost of the work: $217 for the first $5,000, $13.90 for each $1,000 to $50,000, and $7.04 for each $1,000 above that | 2026 Schedule of Fees, Part A 1(a) |
| Food service | Health officer approval of plans before building or altering food premises, and a permit to operate; the grease interceptor on the drawings; a K1 exhaust package, with a clean duct letter if ducts are reused | Food Premises Regulation ss.3, 8; Vancouver Coastal Health; Field Review and TIPs checklist; K1 requirements |
| Occupancy | No occupancy after construction or alteration until the City issues an occupancy permit, after a final inspection of construction and life safety systems; apply at least three weeks ahead | VBBL 2025 Div. C 1.7.1.2, 1.7.2.3; Get an occupancy permit |
| Business licence and hours | A business licence for every business, with the location checked before leasing; construction noise 7:30 a.m. to 8 p.m. weekdays and 10 a.m. to 8 p.m. Saturdays on private property, none on Sundays or holidays | Get a business licence; Noise Control By-law 6555 s.3.1(h) |
Sources: City of Vancouver, When you need a permit, Get a building permit, Tenant Improvement Program, Field review, Commercial Renovation Centre, the Field Review and TIPs checklist, the Commercial Building Renovation checklist, Zoning and Development By-law, Section 4, Vancouver Building By-law 2025, Electrical permit, Get a gas permit, Plumbing permit, Fire sprinkler permit, Mechanical permit, the Fire Alarm Installation or Upgrade checklist, the Development Cost Levies Bulletin, Amenity Cost Charge By-law No. 14816, the 2026 Schedule of Fees, Building permits for restaurant kitchen ventilation, K1 kitchen exhaust requirements, Get an occupancy permit, Get a business licence, Noise Control By-law No. 6555 and Noise from construction; Province of British Columbia, Food Premises Regulation; Vancouver Coastal Health, Food Service Permits and Health Approvals and the Food Premises Orientation Guide.
From the lease to the occupancy permit.
Space & lane
The space, the building’s permit history and the permit lane: TIPs, field review or a full review.
Design & professionals
Drawings with the by-law analysis and exiting, and the registered professionals and letters of assurance the building needs.
Permits
The building permit for each floor, the owner’s and tenant’s undertaking, and trade permits through licensed contractors.
Construction
Work sequenced around neighbouring tenants and the noise by-law’s hours, with inspections as each stage closes.
Occupancy
The final inspection of construction and life safety systems, then the occupancy permit before the space opens.
What makes a Vancouver fit-out different.
Office tenants in listed buildings can use the Tenant Improvement Program, and small renovations without major upgrading can use a field review.
The by-law sets fire, structural, non-structural and accessibility levels by renovation type, and a job under $255,000 needs no structural or non-structural upgrading.
A building built or fully upgraded under a permit issued from May 1, 2007 needs no further upgrading without an addition or a change in major occupancy.
A restaurant or café needs its plans approved by the health authority as well as the City’s permits, and a first commercial kitchen can need a development permit.
Why a fit-out has no set price.
We don't publish a price per square foot for a Vancouver fit-out, because the building, the use and the upgrades it triggers move the number too far for a single figure to be honest. These are the factors that move it.
Minor or major renovation
The by-law’s upgrade levels rise from one suite to several, and again with a change of major occupancy.
Age & permit history
Whether the building was built or fully upgraded under a permit from May 1, 2007 on, and what its fire separations allow.
Trades, sprinklers & alarms
Electrical, mechanical, sprinkler and fire alarm work, each with its own permit.
Food & occupant load
Kitchen exhaust, grease interception and health approval for food service, and the occupant load of the new use.
Floor area added
A mezzanine or other added floor area takes a job out of TIPs and brings levies on the new area.
Phasing around tenants
Work sequenced around a building that stays open, within the hours the noise by-law allows.
Answers before you ask.
Generally, yes. The City lists renovating or tenant improvements for a new or existing commercial space among the work that generally needs a permit, and the Vancouver Building By-law 2025 requires a permit before any work it regulates is undertaken; work started without one pays double the permit fee, up to $20,000 and never less than $500. The City does not accept incomplete applications, and once a permit issues, work has to start within six months or the permit becomes void. Sources: City of Vancouver, When you need a permit, Get a building permit and the Vancouver Building By-law 2025, Book I, Division C, Articles 1.6.1.1 and 1.6.1.2, verified September 2026.
A faster permit stream for office tenants. The City describes TIPs as a dedicated stream for office tenants in eligible commercial buildings to get a building permit for minor interior renovations faster, and any commercial office building whose permit was applied for after January 31, 2007 is automatically on its list. Eligible tenants need no new development permit and get a faster field inspection; the City aims to complete an initial review and make contact within 5 to 10 business days, and the inspector issues the permit within 1 to 2 business days after the inspection passes. It is not for assembly occupancies that increase occupant load, affect exiting or include work to kitchens or washrooms, changes in major occupancy, floor area additions including mezzanines, most major renovations, or projects involving interconnecting floors, fire alarms, sprinkler systems or seismic upgrading. Source: City of Vancouver, Tenant Improvement Program, verified September 2026.
A field review is the City’s alternative way of issuing a permit for small renovation projects that need a building permit but no major upgrading: the site is inspected, and once the inspection is passed the City issues the permit. The City’s June 2026 checklist for field review and TIPs applications covers minor alterations or renovations to existing buildings only, and says a change between Group D and Group E, or to a small suite, may be acceptable for field review even though changes in major occupancy are otherwise excluded. The same checklist says separate permits are issued for each floor of a commercial renovation. Sources: City of Vancouver, Field review, Commercial Renovation Centre and the Field Review and TIPs Minor Renovation checklist (June 2026), verified September 2026.
When the use or the design calls for one. Under the Zoning and Development By-law, a change from general office, retail store, health care office, barber shop or beauty salon, or beauty and wellness centre to another of those uses allowed in the district needs no development permit where the total floor space is no more than 300 m² and the project complies in all other respects. The City says a separate development permit comes before the building permit where zoning relaxations or particular types of land uses are proposed, and its restaurant ventilation page says a food establishment in a building that never had a commercial kitchen needs one. Tenants eligible for TIPs need no new development permit. Sources: City of Vancouver, Zoning and Development By-law, Section 4, clause 4.8.1(n), Get a building permit, Building permits for restaurant kitchen ventilation and Tenant Improvement Program, verified September 2026.
It depends on the type of renovation. Part 11 of the by-law calls the renovation of a single suite in a single tenant space, with its shared demising walls, a minor renovation, and one whose scope takes in multiple suites or other work a major renovation. Its first upgrade flow chart sets a minor renovation at fire and life safety F1, structural S2, non-structural N1 and accessibility A2, and a major renovation at F2, S2, N3 and A3. Where there is no addition or change in major occupancy, no further upgrading is required if the building was built or fully upgraded under a permit issued on or after May 1, 2007, provided the new work complies and unsafe conditions are corrected; and a minor or major renovation valued under $255,000 needs no structural or non-structural upgrading. Altering one suite does not trigger upgrades in other suites unless it creates a non-conformity there, and existing lighting above the ASHRAE 90.1-2016 power density is removed in the project’s spaces. Sources: City of Vancouver, Vancouver Building By-law 2025, Book I (consolidated to May 5, 2026), Division B, Articles 11.1.2.1, 11.1.3.1, 11.1.4.2, 11.1.4.3 and 11.5.2.1, verified September 2026.
Not always. A change of major occupancy runs through the by-law’s second flow chart, but its upgrades need not be provided for a change to a single Group D or Group E suite no larger than the lesser of half the building area or 300 m² whose use fits Table 11.5.4.1.(2): offices, barber and hairdressing shops and beauty salons up to 300 m², non-surgical health care offices up to 300 m² with the hazard index not increased above 200 m², and general retail up to 200 m² with the hazard index not increased. At the other end, where changes of major occupancy within any five years add up to more than 50% of a one-storey building’s area, or 100% of a taller building’s, the entire building goes to F4, S4, N4 and A4, unless the change is a single suite of no more than 100 m² and the work is no more than 5% of the building area. A change in major occupancy also needs an occupancy permit, while the City says a change of use such as office to retail does not by itself trigger a development cost levy. Sources: City of Vancouver, Vancouver Building By-law 2025, Book I, Division B, Article 11.5.4.1 and Flow Chart No. 2, and Division C, Article 1.7.1.2, and the Development Cost Levies Bulletin, verified September 2026.
Licensed trade contractors, through the City. The City’s electrical permit page says the applicant must be a licensed electrical contractor with a valid City of Vancouver or inter-municipal business licence, its gas and fire sprinkler pages ask for that business licence plus a gas or fire sprinkler contractor licence, and its plumbing page asks for a City or inter-municipal business licence. Gas work goes to Technical Safety BC instead where the meter delivery pressure exceeds 14.0 kPa or the connected load on a commercial meter is greater than 120 kW. A mechanical permit is required to install heating and cooling in any commercial building, a fire alarm installation or upgrade needs an electrical permit application before the building permit application is accepted, and tenant improvements are eligible for the sprinkler Fast Track, under which some permits issue within 24 hours. Sources: City of Vancouver, Electrical permit, Get a gas permit, Plumbing permit, Fire sprinkler permit, Mechanical permit and the Fire Alarm Installation or Upgrade checklist, verified September 2026.
Health approval alongside the City’s permits. B.C.’s Food Premises Regulation says no one may build or alter food premises until a health officer has approved the plans and specifications, and a food service establishment needs a permit to operate. Vancouver Coastal Health says floor plans must be reviewed and approved before construction begins, and its orientation guide says to call the environmental health officer for an inspection and health approval before opening. The City strongly advises speaking with Vancouver Coastal Health before submitting permits, wants the location of the required grease interceptor on the drawings wherever food is prepared, and requires a K1 kitchen exhaust package when a commercial kitchen is added or its exhaust renovated, with a clean duct letter if existing ductwork is reused. A food establishment in a space that never had a commercial kitchen also needs a development permit. Sources: Province of British Columbia, Food Premises Regulation, sections 3 and 8; Vancouver Coastal Health, Food Service Permits and Health Approvals and its Food Premises Orientation Guide (October 2025); City of Vancouver, the Field Review and TIPs checklist, the Commercial Building Renovation checklist, the K1 kitchen exhaust requirements and Building permits for restaurant kitchen ventilation, verified September 2026.
Not for an alteration that adds no floor area. The City’s levy bulletin says development cost levies do not apply to alterations of an existing building that do not increase its total floor area, that a change of use such as office to retail does not trigger one, and that any new floor area added in an alteration project is levied. The Amenity Cost Charge By-law, in force September 30, 2026, defines development to exclude repair or renovation that does not increase floor area, exempts work that retains the building, adds no floor area and keeps the same or a lower-rate use, and sets the commercial and other rate at $32.29 per square metre. Sources: City of Vancouver, Development Cost Levies Bulletin (last amended August 25, 2026), sections 4.4, 6.1 and 6.2, and Amenity Cost Charge By-law No. 14816, sections 1.2 and 3.8 and Table B, verified September 2026.
The City publishes its own figures. Its table headed “Permit processing times for August 2026” shows a median elapsed time of 3.0 weeks across 71 issued permits in “Renovation - Commercial/ Mixed Use - Lower Complexity”, with elapsed time measured from the date an application generates a permit number to when the permit is issued. Under TIPs the City aims to make first contact within 5 to 10 business days and to issue within 1 to 2 business days of a passed inspection, it aims to process plumbing applications that need no plan review the next business day, and it asks for an occupancy permit application at least three weeks before the planned move-in. Sources: City of Vancouver, Commercial Renovation Centre (table read September 15, 2026), Tenant Improvement Program, Plumbing permit and Get an occupancy permit, verified September 2026.
Once the City issues an occupancy permit. The Vancouver Building By-law 2025 bars occupying a building or part of one after construction or alteration, or after a change in its major occupancy, until the owner has an occupancy permit, and before one issues the owner calls for and coordinates a final inspection of construction and the fire and life safety systems. The City’s page says an occupancy permit must be issued before occupying space in any commercial building, asks for the application at least three weeks before the move-in date, and lists approvals that can include Vancouver Coastal Health, Vancouver Fire and Rescue Services and the grease interceptor inspection, with no additional fee where the by-law requires the permit. The Chief Building Official may issue an occupancy permit for the approved use before the work is complete. Every Vancouver business also needs a business licence, and the City asks owners to check a location with its Development and Building Services Centre before leasing it. Sources: City of Vancouver, Vancouver Building By-law 2025, Book I, Division C, Articles 1.5.2.22, 1.7.1.1, 1.7.1.2 and 1.7.2.3, Get an occupancy permit and Get a business licence, verified September 2026.
Yes. Kyrax Developments Ltd. holds BC Housing Residential Builder Licence #57802, in good standing, as a General Contractor and Developer; verify it on the BC Housing Licence Registry. That licence covers residential building, and in Vancouver the trade permits on a commercial fit-out are applied for by licensed trade contractors. Our renovation and tenant improvement work includes phasing and sequencing in occupied buildings; see our services page, and for homes in Vancouver our home renovations and custom home pages.
Ready to plan your space?
We start with a walkthrough, a scope document, and a straight answer on which permits and approvals apply. Initial consultations are complimentary.