(01) — Custom Homes

Custom Home Builder in Surrey, BC

Kyrax Developments is based in Surrey and builds new homes across the city as a BC Housing licensed residential builder, licence #57802. Surrey is one of the few cities that publishes how long its reviews actually take, and it is specific about the order things happen in: the civic address before the drawings, the building permit before the plumbing and electrical permits, and a long list of Engineering items before the old house can come down.

(02) — What's included

A custom home, lot to handover.

01

Lot & zone review

What the zone allows — a house, a houseplex in R3, a coach house or garden suite at the back — and which trees on the lot are protected.

02

Licence & warranty

The home is registered and enrolled in 2-5-10 home warranty insurance, which BC Housing requires of every new home a licensed builder puts up.

03

Demolition

The old house down under its own permit, with the water shut-off, capped connections and pre-damage form Engineering asks for first.

04

Permits, in order

Civic address, then the building permit, then the plumbing and electrical permits — which Surrey only accepts once the building permit has issued.

05

Structure & envelope

Foundation, framing, roof and envelope built to the Step Code level in force on the permit date, and verified the way the code asks.

06

Finishing & handover

Finishes, final inspections in every trade, occupancy, and the warranty documents that go to you at handover.

(03) — Surrey requirements

What the City requires, and in what order.

Surrey publishes both its rules and its review times, which makes a new-home schedule easier to plan here than in most of the region — as long as the sequence is respected.

From the City of Surrey’s residential building permit, houseplex, coach house, demolition and permitting timelines pages, its Tree Protection and Noise Control bylaws, read September 11, 2026, with BC Housing and the Province of British Columbia for the licence, warranty and Step Code rules. The City’s processing figure is a 30-day average and moves.
StageWhat Surrey requiresWhere it says so
Building a houseResidential building permitResidential Building Permits
Plumbing and electricalSeparate permits, which may be applied for only after the building permit has been issuedResidential Building Permits
The addressThe new civic address is established by an Addressing Clerk before drawings are prepared; drawings are not reviewed with a missing or incorrect addressResidential Building Permits
A triplex or fourplexHouseplex: R3 zone only, lane access or two roads, outside a Transit Oriented Area, 15 m minimum building width, detached parking, no secondary suitesHouseplexes
A coach house or garden suite35 to 75 m², excluded from FAR, up to 120 m² on RA, R2, R2-O and R3 lots under the maximum FAR; may need registrationCoach Houses & Garden Suites
Taking the old house downDemolition permit for any building or structure; a Registered Professional for a partial demolitionDemolition Permits
Before the demolition permit issuesWater shut-off arranged and paid through City staff, sanitary and storm connections capped and marked with a 2x4 within two metres of the property line, and a pre-damage formDemolition Permits
Derelict or agricultural buildingsA pest management company may be required, and may have to confirm a rodent control program; a certified arborist may be required on siteDemolition Permits
Protected trees30 cm diameter and up, plus listed categories; up to two replacement trees for each one removed; fines up to $20,000 per offenceTree Protection Bylaw 16100; Removing Trees
Construction hours7 a.m. to 10 p.m., and not on a Sunday when the work is for profit or gainNoise Control By-law 7044, Part C
Review timeNew single family and duplex at 5.7 weeks against a 10-week target, on the page last updated September 14, 2026Permitting Timelines
When the review clock startsAfter referrals and a complete site servicing review, not at submission; the figure is a 30-day averagePermitting Timelines
The builderA licensed residential builder, province-wideBC Housing
Warranty2-5-10 home warranty insurance, registered and enrolled before constructionBC Housing
Energy performanceThe Step Code level in force on the building permit date, or a higher step the City requires by bylawProvince of British Columbia

Sources: City of Surrey, Residential Building Permits, Permitting Timelines, Houseplexes, Coach Houses & Garden Suites, Demolition Permits, Tree Protection Bylaw No. 16100 and Noise Control By-law No. 7044; BC Housing, Builder & Developer Licensing and New Home Registration & Warranty; Province of British Columbia, BC Energy and Zero Carbon Step Codes.

(04) — How we work

From lot review to warranty handover.

New house framed to lock-up
01

Zone, trees and address

What the zone allows, which trees are protected, and the civic address established with an Addressing Clerk before any drawing is started.

02

Design & registration

Design coordinated against the Step Code level that will apply, and the home registered for warranty enrolment.

03

Demolition & servicing

The demolition permit with its Engineering prerequisites, and the site servicing review that starts the City’s building permit clock.

04

Building, then trade permits

The building permit first, then plumbing and electrical, which Surrey accepts only after the building permit has issued.

05

Construction & handover

Construction inside the City’s noise hours, inspections in every trade, then occupancy and the warranty package.

(05) — Surrey considerations

What's different about building here.

A published clock

Surrey reports its current processing time against a target and says when the clock starts — after referrals and a complete site servicing review for a single-family dwelling, not at submission. Few cities in the region publish either number.

Sequence matters

The civic address comes before drawings, and the plumbing and electrical permits cannot even be applied for until the building permit has issued.

More than one house

An R3 lot with lane access may take a houseplex of three or four units, and most residential zones allow a coach house or garden suite of 35 to 75 square metres at the back.

Demolition is a project

Capping and marking the sanitary and storm connections, a paid water shut-off, a pre-damage form, sometimes a pest management company and an arborist on site — all before the old house comes down.

(06) — What affects cost

No two custom homes price the same.

We don't publish a price per square foot for a Surrey custom home, because the lot, the form of housing and the code level move the number too far for a single figure to be honest. These are the factors that move it.

Form

House, houseplex or both

A single house, a triplex or fourplex in R3, and a coach house or garden suite at the back are different builds with different permit paths.

Site

Demolition & servicing

Water shut-off, capped connections, a pre-damage form and any road or boulevard authorization all sit ahead of construction.

Energy

Step Code level

The level in force on the permit date drives envelope, mechanical and the verification work behind them.

Warranty

Registration & enrolment

Every new home is registered and enrolled with an approved warranty provider — a real line in both the budget and the schedule.

Trees

Permits & replacements

Protected trees mean a permit, and the City may require two replacement trees for every tree removed.

Timing

Where the clock starts

The City’s review time is measured from after referrals and site servicing review, so the work that gets you to that point is part of the schedule.

(07) — Common questions

Answers before you ask.

Yes. BC Housing puts it directly: if you are a general contractor, developer or building envelope renovator and want to build a new home in B.C., you must first become a licensed residential builder. The licence is renewed every year, and Continuing Professional Development is a mandatory part of renewing a general contractor licence. Kyrax Developments Ltd. is based in Surrey and holds Residential Builder Licence #57802, in good standing, as a General Contractor and Developer. Sources: BC Housing, Builder & Developer Licensing, and the BC Housing Licence Registry, verified September 2026.

Yes, unless an exemption applies. BC Housing says a new home project must be registered and enrolled in home warranty insurance, or have an applicable exemption, and that all new homes built by licensed residential builders in B.C. must carry 2-5-10 home warranty insurance, which it calls the strongest construction defect insurance in Canada. The insurers are approved by the BC Financial Services Authority, and there is a rental exemption with its own criteria and a restrictive covenant registered on title. Source: BC Housing, New Home Registration & Warranty, verified September 2026.

The building permit comes first. The City says a residential building permit is usually required for work such as building a house, and that separate plumbing and electrical permits are required for any plumbing and electrical work — but that those may be applied for only after the building permit has been issued. Before any drawings are even prepared, the new civic address for the property has to be established by an Addressing Clerk, and the City says drawings will not be reviewed with incorrect or missing addresses. Source: City of Surrey, Residential Building Permits, verified September 2026.

The City publishes the figure. On its permitting timelines page, last updated September 14, 2026, a residential building permit — which it defines as new single family and duplexes — was running at 5.7 weeks against a 10-week target. The City is clear that the clock does not start when you submit: for a single-family dwelling it starts after referrals and a complete site servicing review, and the current figure is an average of permits processed in the last 30 days, so it moves. Source: City of Surrey, Permitting Timelines, verified September 2026.

In the R3 zone, yes — Surrey calls them houseplexes. The City defines a houseplex as a residential building with three to four principal dwelling units, permits them only in the R3 zone, and requires an eligible lot to have lane access or be served by two roads, as a corner or through lot, and to sit outside a Transit Oriented Area. The minimum building width is 15 metres, which the City says typically needs a lot at least 18 metres wide; parking has to come from the lane or, on a corner lot, the lower-classification street, and must sit in a detached garage or parking pad rather than an attached garage or carport. Secondary suites are not permitted in a houseplex. Source: City of Surrey, Houseplexes, verified September 2026.

In most residential zones, yes. Surrey defines a coach house as an accessory dwelling above or attached to a detached garage and a garden suite as a separate accessory building, and says every residential zone that allows detached houses, duplexes and houseplexes also allows one. They run from a minimum of 35 square metres to a maximum of 75 and are excluded from floor area ratio, except for the garage portion of a coach house; where the existing house or duplex sits below the maximum FAR, the size can rise to 120 square metres on RA, R2, R2-O and R3 lots. A coach house or garden suite may count as a dwelling unit and need registration. Source: City of Surrey, Coach Houses & Garden Suites, verified September 2026.

A demolition permit, and more site work than most people expect. Surrey requires a permit to demolish any building or structure. A Registered Professional is required for a partial demolition; a pest management company may be required where the building is derelict or has been used for agricultural purposes, and may have to confirm a rodent control program; and a certified arborist may be required on site during the demolition. Before it issues, Engineering requirements include arranging and paying for the water shut-off by City staff, capping the existing sanitary and storm connections and marking them with a 2x4 within two metres of the property line, and completing a pre-damage form. Work affecting City roads, sidewalks or boulevards needs its own authorization. Source: City of Surrey, Demolition Permits, verified September 2026.

Only with a tree cutting permit if the tree is protected, and many are. Surrey's Tree Protection Bylaw protects every tree with a trunk diameter of 30 centimetres or more at breast height, along with replacement trees, trees planted or kept as a condition of a building or demolition permit, trees in riparian areas, significant trees and several listed species. The City's permit page lists allowing for construction among the reasons a permit can be issued, and says you may be required to plant two replacement trees for every tree you remove. Cutting or damaging a tree contrary to the bylaw carries a fine of up to $20,000 per offence. Sources: City of Surrey, Tree Protection Bylaw No. 16100, sections 2, 6 and 10, and Removing Trees, verified September 2026.

Between 7 a.m. and 10 p.m., and not on a Sunday if the work is paid. Surrey's Noise Control By-law bars construction, alteration or repair work that disturbs the neighbourhood before 7 a.m. or after 10 p.m. on any day, and bars such work on a Sunday when it is done for profit or gain. The City can give written approval for necessary work at other hours where compliance is impossible or impractical. Source: City of Surrey, Noise Control By-law No. 7044, Part C, verified September 2026.

The BC Energy and Zero Carbon Step Codes, at whatever level applies on your building permit date. The Province says Step Code requirements are based on the building permit date of the project and where it is located: the Province sets the minimum energy efficiency requirements, and local governments have the authority to require higher steps through bylaw if they choose. The Province describes the path as net-zero energy ready new buildings by 2032 and zero carbon new buildings by 2030, and publishes a Part 9 checklist for demonstrating compliance on a house. Sources: Province of British Columbia, BC Energy and Zero Carbon Step Codes and Step Code requirements, verified September 2026.

On our projects, a custom home runs 12 to 18 months from permit to handover. That is our own clock and it starts once the permit is in hand; the City's clock is separate and published — 5.7 weeks against a 10-week target for a new single family dwelling as of September 14, 2026, counted from after referrals and a complete site servicing review rather than from submission. Sources: City of Surrey, Permitting Timelines and Residential Building Permits, verified September 2026.

Yes to both, from a Surrey base. Kyrax Developments Ltd. holds BC Housing Residential Builder Licence #57802, in good standing, as a General Contractor and Developer, the classification BC Housing requires to build a new home; verify it on the BC Housing Licence Registry. Renovation work across the city is covered on our Surrey home renovations page, and custom homes in the Langleys on our Langley custom home page.