Custom Home Builder in Abbotsford, BC
Kyrax Developments builds custom homes in Abbotsford as a BC Housing licensed residential builder, licence #57802. In Abbotsford a new house starts with a complete application through the City’s Building Permit Portal, because the City says incomplete submissions cannot be accepted. The house is built to Step 3 and tested for airtightness twice, and replacing an older house brings a demolition permit, water and sewer services handled under their own bylaws, and a Tree Management Bylaw that took effect on March 1, 2026.
A custom home, title search to occupancy.
Title, survey & grading
The 30-day title search, the BC Land Surveyor’s topographic survey for an infill or rural lot, and lot grading plans with the elevations that keep gravity feed to the City’s sewer connections.
Licence & warranty
The home warranty evidence Abbotsford’s Building Bylaw wants before it issues a permit for a home, from a licensed residential builder.
Demolition & services
The demolition permit, the older water service handled as the City decides, and the sanitary and storm disconnect permits.
Step 3 & airtightness
An energy model with the application, a blower door test before the insulation inspection, and another at completion.
Trees & the street
The tree survey, arborist report and retention plan, barriers approved before site work, and the Highway Excavation Permit for the driveway.
Inspections & occupancy
Inspections booked with at least 24 hours’ notice, a lot grading survey if the City asks for one, then authorization to occupy.
What Abbotsford asks for, stage by stage.
Abbotsford’s gates for a new house are a complete application through its portal, water and sewer services dealt with at demolition, trees under a bylaw that took effect March 1, 2026, and two airtightness tests before occupancy.
| Stage | What Abbotsford requires | Where it says so |
|---|---|---|
| Applying | A Building Permit Portal account before submission, application fees at submission, and a complete package: the City says incomplete submissions cannot be accepted | Submission Checklist, Residential New Building, February 4, 2025 |
| Application fee | $750 for a new dwelling, or $712.50 with a Registered Professional, non-refundable and credited towards the building permit fee at issuance | Building Code, Bylaws & Fees (Fees and Charges Bylaw Schedule G, from March 20, 2023) |
| Title and owners | A title search retrieved within 30 days, the registered covenants, easements and rights-of-way, and a letter of authorization signed by each owner | Building Bylaw 2883-2018 s.35(c); Submission Checklist |
| Survey and grading | A topographic survey from a BC Land Surveyor for infill and rural properties; lot grading plans with the dwelling’s four corner elevations on an infill lot; sewer connection inverts and the minimum building elevation for gravity feed | Building Bylaw s.40(a) and (e); Submission Checklist |
| Drainage and excavation | Storm infiltration or detention design for building projects in urban areas; shoring plans where excavation deeper than 1.2 m is in the Steep Slope Development Permit Area or close to adjacent properties | Submission Checklist, page 2 |
| Energy | Step 3 of the BC Energy Step Code for new single family buildings since May 1, 2023, with EL-1 emissions disclosure from March 10, 2025; an energy model and pre-construction compliance report with the application | Part 9 Step Code bulletin, February 4, 2025; Building Bylaw s.14.1 |
| Airtightness | A mid-construction blower door test before the insulation inspection, which may not be needed with air-tight drywall; a post-construction test with at least 48 hours’ notice to the City | Part 9 Step Code bulletin, February 4, 2025 |
| Airport and ALR | An application to Transport Canada and NAV Canada inside the Airport Flight Zoning; in the ALR, a Notice of Intent to the Agricultural Land Commission for fill beyond its limits, with no permit before its exemption | Submission Checklist, page 2 |
| Licence and warranty | No permit for a home without evidence of home warranty insurance and a licensed residential builder, or an owner builder authorization | Building Bylaw s.65 |
| Demolition | A building permit for the demolition, which expires 6 months after it is issued | Building Bylaw ss.18 and 69(2) |
| Water service | A service installed 20 or more years before the demolition permit is removed at demolition, or inspected under the new building permit and either temporarily disconnected or removed and replaced | Waterworks Regulations Bylaw 2665-2017 s.6 |
| Sewer services | A disconnect permit before any building sewer is disconnected, $750 plus GST each for sanitary and storm; the sanitary connection is inspected before reconnection | Sewer Regulations Bylaw 2664-2017 s.15; disconnect permit pages |
| Trees | Protected from 20 cm DBH, or 10 cm in a tree retention area; a tree survey, arborist report and removal, retention and replacement plans before development-related activity; barriers around retained trees within 4 m of the adjacent property approved before site disturbance; ALR properties exempt | Tree Management Bylaw 3600-2025 ss.12 and 22; Tree Management |
| Replacement and securities | One to eight replacement trees per protected tree of 20 cm or more removed, by size and species; $2,000 per retained tree, $5,000 at 60 cm DBH or for a significant tree, capped at $100,000, and $750 per replacement tree | Tree Management Bylaw s.47 and Schedule D |
| Development charges | Imposed on subdivision approval and on building permits, including buildings with fewer than 4 dwelling units, and generally collected at subdivision in urban areas; for a single detached lot from February 1, 2026, up to $57,032 in DCCs by sector plus a $7,828 amenity cost charge and the school site acquisition charge; no credit cards | DCC Bylaw 3174-2021 ss.3 and 4; ACC Bylaw 3637-2025; Rates Summary; 2023 guide; Development Engineering |
| Driveway | A Highway Excavation Permit from Engineering for a new driveway, or to alter, relocate or repave one | Residential New & Additions Application Guide 2023 |
| Permit life | Expires if work does not start within six months of issue or stops for 12 months after the last inspection, and two years after issue; one-year extensions on a renewal fee | Building Bylaw ss.66, 67 and 70 |
| Inspections and occupancy | At least 24 hours’ notice, booked online; no occupancy until a Building Official authorizes it, after any required lot grading survey is accepted | Building Bylaw ss.94, 95, 97 and 98; Inspections |
| Construction hours | 7 a.m. to 9 p.m. Monday to Saturday and 9 a.m. to 9 p.m. Sundays and statutory holidays, demolition included; exemption applications 10 business days ahead | Sound Regulation Bylaw 2687-2017 ss.11(c) and 14(b) |
Sources: City of Abbotsford, Submission Checklist, Residential New Building, Residential New & Additions Application Guide 2023, Building Code, Bylaws & Fees, Building Bylaw, 2018, the Part 9 Step Code bulletin, BC Energy Step Code, Waterworks Regulations Bylaw, 2017, Sewer Regulations Bylaw, 2017, the sanitary and storm disconnect permit pages, Tree Management Bylaw No. 3600-2025, Tree Management, Development Cost Charges Imposition Bylaw No. 3174-2021, Amenity Cost Charges Imposition Bylaw No. 3637-2025, the rate summary, Development Engineering, Inspections, Building Permit Wait Times, Sound Regulation Bylaw, 2017 and the Good Neighbour Guide; BC Housing, Register a New Home.
From a complete application to occupancy.
Lot, title & survey
The 30-day title search and registered charges, the topographic and tree surveys, and whether the lot is urban, rural, in the ALR or inside the Airport Flight Zoning.
Design, energy & registration
Drawings, grading and sewer elevations, the energy model and pre-construction compliance report, and the home registered with BC Housing.
A complete application
The full package through the Building Permit Portal with the application fee, then the City’s plan review.
Demolition & services
The demolition permit, the water service handled as the City decides, sewer disconnect permits, and tree barriers approved before site work.
Construction & occupancy
Inspections booked ahead, blower door tests mid-build and at the end, any lot grading survey, then authorization to occupy.
What sets building in Abbotsford apart.
The City’s checklist says incomplete submissions cannot be accepted, and the Building Bylaw treats an application as made only once section 35 is satisfied.
Abbotsford’s bulletin requires a blower door test before the insulation inspection and another at completion, with an exception for air-tight drywall.
A water service 20 or more years old is removed or assessed by the City at demolition, and each sewer disconnect needs its own permit.
Since March 1, 2026, trees from 20 cm DBH are protected, with a security on each retained tree; ALR properties are exempt.
Why an Abbotsford build has no set price.
We don't publish a price per square foot for an Abbotsford custom home, because the lot, its servicing and its trees move the number too far for a single figure to be honest. These are the factors that move it.
Urban, rural or ALR
Storm detention in urban areas, a septic record where one is proposed, and ALR fill limits all change the site work.
Demolition & services
Removing the old house, the water service work the City decides on, and sewer disconnect and reconnect permits.
Step 3 & airtightness
The envelope and air barrier that pass two blower door tests, and the energy modelling behind them.
Development & amenity charges
Where they apply, set per lot and by sector, with the school site acquisition charge on top.
Surveys, securities & replacements
Arborist work, a security on each retained tree, and replacement planting by size and species.
Application & permit life
A package the City will accept the first time, a start within six months of issue, and inspections booked ahead.
Answers before you ask.
For a home, the City wants proof before it issues the permit. Abbotsford’s Building Bylaw says a building permit for a building that includes a residential occupancy must not be issued unless the applicant provides evidence, under section 22 of the Homeowner Protection Act, that the building is covered by home warranty insurance and the constructor is a licensed residential builder, or that the owner has provided an owner builder declaration and disclosure notice authorization. Under a custom-home contract, BC Housing says registering and enrolling the home falls to the licensed general contractor rather than the homeowner. Kyrax Developments Ltd. holds BC Housing Residential Builder Licence #57802, in good standing, as a General Contractor and Developer; verify it on the BC Housing Licence Registry. Sources: City of Abbotsford, Building Bylaw, 2018, section 65; BC Housing, Register a New Home, verified September 2026.
A complete package, submitted online. The City’s February 2025 checklist for new residential buildings says incomplete submissions cannot be accepted, that a Building Permit Portal account must be created before submitting, and that application fees are due at submission; for a new dwelling the non-refundable application fee is $750, or $712.50 with a Registered Professional, and it is credited towards the building permit fee at issuance. The minimum package includes a title search retrieved within the last 30 days, the registered covenants, easements and rights-of-way, a letter of authorization signed by each owner, a topographic survey from a BC Land Surveyor for infill and rural properties, architectural drawings, and the Energy Step Code documents. The Building Bylaw adds that an application is not treated as made until the requirements of section 35 are met. Sources: City of Abbotsford, Submission Checklist, Residential New Building (February 4, 2025), Building Code, Bylaws & Fees and Building Bylaw, 2018, sections 35 and 38, verified September 2026.
Step 3 of the BC Energy Step Code, proven by two blower door tests. The City’s February 2025 bulletin says Step 3 has applied to all new building permit applications for single family buildings since May 1, 2023, with EL-1 provisions to measure and disclose operational greenhouse gas emissions added from March 10, 2025. The application carries an energy model and a pre-construction compliance report, and the bulletin warns that applicants who don’t use conservative airtightness assumptions risk homes that miss Step 3 and a delayed occupancy at final inspection. It requires a mid-construction blower door test before the insulation inspection, which may not be necessary if air-tight drywall is used, then a post-construction test with at least 48 hours’ notice so a Building Official may attend, and a home energy label on or near the electrical panel. The City’s Step Code web page, still headed with the 2018 code revision, describes the mid-construction test as strongly encouraged. Sources: City of Abbotsford, BC Energy and Zero Carbon Step Code Requirements for Part 9 Buildings (February 4, 2025), BC Energy Step Code and Building Bylaw, 2018, section 14.1, verified September 2026.
A demolition permit, with the services dealt with under two bylaws. Abbotsford’s Building Bylaw says no one may demolish a building unless a building permit for the demolition has been issued, and that permit expires 6 months after it is issued. Where the house includes a water service installed 20 or more years before the date the City receives the demolition permit, the Waterworks Regulations Bylaw requires an application either to have the service permanently disconnected and removed at demolition, or for a building permit for the new house, in which case the City inspects the service and decides whether it is temporarily disconnected or permanently disconnected, removed and replaced. Before any building sewer is disconnected, the owner applies for a disconnect permit; the City lists $750 plus GST each for sanitary and storm, and it inspects the sanitary connection before reconnection. Sources: City of Abbotsford, Building Bylaw, 2018, sections 18 and 69(2), Waterworks Regulations Bylaw, 2017, section 6, Sewer Regulations Bylaw, 2017, section 15, and the sanitary and storm disconnect permit pages, verified September 2026.
It depends on the lot. Abbotsford’s Development Cost Charges Imposition Bylaw imposes its charges on subdivision approval and on building permits, including permits for a building with fewer than 4 self-contained dwelling units, and the City’s 2023 application guide says DCCs are generally collected during the subdivision phase for projects in urban areas but may also be required for projects on older properties or outside the urban areas, including a new residential building on land zoned for agricultural use. Where they apply, the City’s rate summary effective February 1, 2026 lists, for a single detached lot, up to $57,032 in development cost charges, depending on which of the bylaw’s sectors the lot is in, and a $7,828 amenity cost charge under the separate amenity bylaw, $64,860 together, plus the school site acquisition charge. The City does not accept credit cards for DCCs. Sources: City of Abbotsford, Development Cost Charges Imposition Bylaw No. 3174-2021, sections 3 and 4 and Table 1, Amenity Cost Charges Imposition Bylaw No. 3637-2025, the Development & Amenity Cost Charge Rates Summary, the Residential New & Additions Application Guide 2023 and Development Engineering, verified September 2026.
Only as the Tree Management Bylaw allows, in force since March 1, 2026. Protected trees include any tree of at least 20 cm DBH, or 10 cm in a tree retention area, and a property with a building permit application for a new principal building counts as undergoing development: where construction or site disturbance will affect protected trees, the owner provides a tree survey, an arborist report, a tree removal and retention plan and any replacement tree plan, and complies before any development-related activity starts. The City may refuse a tree permit while a building permit application for the same property is under active review. Tree protection barriers around retained trees within 4 metres of the adjacent property are installed, inspected and approved before construction or site disturbance. Replacements follow Schedule D, one to eight trees for each protected tree of 20 cm or more removed, by size and species. Securities are $2,000 per retained tree, or $5,000 for a tree of at least 60 cm DBH or a significant tree, capped at $100,000 per site application, plus $750 per replacement tree on a property undergoing development. Properties in the Agricultural Land Reserve are exempt. Sources: City of Abbotsford, Tree Management Bylaw No. 3600-2025, sections 12, 15, 22 and 47 and Schedule D, and Tree Management, verified September 2026.
On our projects, a custom home runs 12 to 18 months from permit to handover. That is our own clock, and it starts once the permit is in hand. Before it, the City’s Building Permit Wait Times page shows a queue rather than a duration: which submission date plan review has reached for new and addition residential homes, and how many applications are pending. After it, the Building Bylaw has a permit expire if work is not started within six months of issue or is discontinued for 12 months after the last inspection, and every permit expires two years after issue unless extended; the City says every effort is made to book inspections within 1 to 2 business days, with at least 24 hours’ notice. Sources: City of Abbotsford, Building Permit Wait Times, Building Bylaw, 2018, sections 66, 67 and 70, and Inspections, verified September 2026.
Elevations on paper before the permit, and sometimes a survey after. For a single family dwelling, the Building Bylaw asks for lot grading plans, including the elevations of the dwelling’s four corners on an infill lot, and the width, slope and location of the driveway out to the centre line of the street. On an infill lot in an established subdivision it also wants a current posting and topographic survey by a BC Land Surveyor, and a plan with the invert elevations of the storm and sanitary sewer connections at the property line and the minimum building elevation that keeps gravity feed to those connections. The City’s checklist adds a storm infiltration or detention design for building projects in urban areas, and shoring plans where excavation deeper than 1.2 m is in the Steep Slope Development Permit Area or close to adjacent properties. The City may require a post-completion lot grading survey, which it accepts before occupancy is authorized. Sources: City of Abbotsford, Building Bylaw, 2018, sections 40, 94 and 98, and the Submission Checklist, Residential New Building, verified September 2026.
Fill, drainage, charges and trees. The City’s checklist says proposed buildings and driveways in the ALR that need fill or soil deposits beyond the Agricultural Land Commission’s regulation limits must apply to the Commission for a Notice of Intent, that building permits cannot be issued before the Commission grants the exemption, and that sand and gravel for the underslab aggregate counts as fill. The same checklist wants a storm infiltration or detention design for projects in agricultural areas with 10% or more aggregate lot coverage, and a Fraser Health record where a septic system is proposed. On land zoned for agricultural use, the City’s 2023 application guide lists development cost charges for a new residential building, while the Tree Management Bylaw does not apply to ALR properties. Sources: City of Abbotsford, the Submission Checklist, Residential New Building (February 4, 2025), the Residential New & Additions Application Guide 2023 and Tree Management, verified September 2026.
Set hours and a clean street. The Sound Regulation Bylaw lets construction that disturbs neighbours run only from 7 a.m. to 9 p.m. Monday to Saturday and 9 a.m. to 9 p.m. on Sundays and statutory holidays, with demolition counted as construction, and an application for an exemption must reach the Chief Building Official at least 10 business days before the work. The City’s Good Neighbour Guide asks builders to keep roads and sidewalks around the site clean of mud, gravel and debris, keep driveways, sidewalks and lanes clear, and not park on boulevards, and its application guide says a new driveway, or altering, relocating or repaving one, needs a Highway Excavation Permit from Engineering. Sources: City of Abbotsford, Sound Regulation Bylaw, 2017, sections 11(c) and 14(b), the Good Neighbour Guide (updated 2025) and the Residential New & Additions Application Guide 2023, verified September 2026.
At 75% new construction. The City’s 2023 residential application guide sends a project that proposes 75% or more new construction, excluding the foundation, down its new-building path instead of its additions path, and a new dwelling there needs the Energy Step Code compliance report and BC Housing approval. The City’s Step Code bulletin says its provisions apply to new construction only and do not apply to renovations. Sources: City of Abbotsford, the Residential New & Additions Application Guide 2023 and the Part 9 Step Code bulletin (February 4, 2025), verified September 2026.
Yes to both. Kyrax Developments Ltd. holds BC Housing Residential Builder Licence #57802, in good standing, as a General Contractor and Developer; verify it on the BC Housing Licence Registry. Renovations in Abbotsford are covered on our Abbotsford home renovations page and our Abbotsford bathroom renovations page, and custom homes elsewhere on our Surrey, Langley and Burnaby pages.
Ready to build your home?
We start with a walkthrough, a scope document, and a straight answer on which permits and approvals apply. Initial consultations are complimentary.
Start a project