Coach House Builder in North Vancouver, BC
Kyrax Developments builds coach houses in North Vancouver as a BC Housing licensed residential builder: on site as the general contractor, or as the site work for Kyrax Homes’ factory-built units. The City and the District of North Vancouver keep separate permit systems, and each has adopted a new zone for most of its single-family lots within the past year: the City its Ground Oriented zone in December 2025, and the District its R2 zone in July 2026. The District charges a coach house $34,365 in development and amenity cost charges, where the City’s bylaw exempts buildings of fewer than four units, and the District asks for a wildfire hazard report in its wildfire area.
A coach house, City or District.
Which North Vancouver
City or District, the zone, and any permit area the lot sits in: streamside, wildfire or slope.
On site or factory-built
A coach house built on the lot, or the foundation, services and crane set for a Kyrax Homes unit.
Licence & warranty
The coach house registered with BC Housing as a new home by a licensed residential builder.
Permit package
The City’s single application or the District’s intake: surveys, sealed plans, the stormwater plan and Step Code documents.
Access, services & trees
The lit path and address, the connections and meter, and tree barriers approved before work.
Inspections & occupancy
Step Code checklists through construction, the finals, and the occupancy certificate or permit.
What each North Vancouver asks of a coach house.
The two municipalities agree on some gates, such as home warranty registration, a Step Code pairing and a lit route for responders, and part ways on others: the permit route, the charges, the servicing rules, wildfire reports and which trees are protected.
| Stage | What North Vancouver requires | Where it says so |
|---|---|---|
| Which municipality | The City and the District of North Vancouver each issue their own building, electrical and gas permits under their own bylaws | Technical Safety BC, Jurisdiction |
| City: permit route | Ground Oriented zone, adopted December 8, 2025: an inquiry first, then one application form for the development and building permits; other zones: a development permit and building permit processed together | Ground Oriented Housing; Coach House page and handout |
| City: submission | Complete packages only, in digital form with digital seals, by email or the Province’s Building Permit Hub; addresses for new units assigned during building permit review | Residential Project Application Form; How to Submit Construction Permits |
| District: permit route | An RS or R2 lot inside the urban containment boundary; a development variance permit first for any variance, and a development permit first in a development permit area | Build a coach house; Coach House How-To Guide |
| District: application | A scheduled intake with the coach house checklist; owner-signed form; title search within 30 days; BCLS survey within 6 months; a District business licence for the applicant; half the permit fee on acceptance, the rest with securities before issuance | Coach house checklist; application form; Building permit (single family home) |
| Licence & warranty | A detached self-contained dwelling unit is a new home: home warranty insurance and a licensed builder, or an owner builder; the New Home Registration Form in both municipalities | Homeowner Protection Act ss.1, 30(1); District Bylaw 8271 ss.5.16-5.18; both checklists |
| Electrical & gas | City: electrical permits to a registered contractor, or a resident owner or tenant of a detached house without a suite; District: homeowner permits only without a suite or rental use, otherwise a licensed contractor after the building permit | City Bylaw 7390 s.8.20; District electrical and gas permit pages |
| Electrical service | District: at least a 200 amp service, with separate panels in the coach house and the main house; City: a new or modified overhead service placed so the lane can feed it | District coach house checklist; City Bylaw 7390 s.8.23 |
| Fire access & address | City: a clear path at least 1.0 m wide from the street, lit at night, and an address and unit number lit and visible from street and lane; District: the main house address with unit number 3 | City Zoning Bylaw 6700 s.573; Accessory Coach House DP Guidelines 3.1; District Coach House How-To Guide |
| Energy | City: Step 4 with EL-3, or Step 5 with EL-1, and the mid-construction checklist by the insulation inspection; District: Step 5, or Step 4 with EL-3, and a home energy label at each unit’s panel | City Bylaw 7390 s.8.7.4; Part 9 Buildings; District Bylaw 8271 s.14.1; Step Code page |
| District charges | $14,720 development cost charge and $19,645 amenity cost charge per coach house, $34,365 in all, at the building permit stage, fixed on the date a complete application is submitted | District Bylaws 8704 and 8705; Build a coach house |
| City charges | No development cost charge on a building permit for a building of fewer than four dwelling units in residential use, or on work of $100,000 or less; development cost charges are the only such charges the City applies | City Bylaw 8471 s.5; Development Cost Charges page |
| District servicing | One sanitary, storm and water connection per lot, a water meter and an inspection chamber; a new water connection at $300,000 of permit value unless under 20 years old; new sanitary and storm at $200,000 unless under 30 years old and sound | Coach House How-To Guide; service connection and related fees |
| District drainage & soils | A stormwater management plan sealed by a P.Eng. at the pre-development 2-year, 24-hour rate; a geotechnical report with a test hole and percolation test | District coach house checklist |
| City servicing | City water, and the sanitary sewer where one runs beside the lot; roofs and paving to storm; a stormwater management plan with the building permit; for Ground Oriented projects a sealed servicing plan and undergrounding where required | City Bylaw 7390 s.8.14.2; stormwater plan requirements; small Ground Oriented checklist |
| City streamside areas | Within 15 m of a watercourse’s top of bank or 10 m of a ravine bank: a development permit before any construction, approved before the building permit | Streamside Development Permit Areas |
| District wildfire area | A new building needs the wildfire development permit, and its building permit application a qualified professional’s wildfire hazard report; Class A roofing and a 1.5 m fuel-free zone; sign-off before occupancy | OCP Schedule B; Wildfire Hazard Report SPE115 |
| District trees | A tree permit for protected trees or any tree of 75 cm diameter or more; barriers inspected and approved before work starts; an arborist report and tree management plan at intake | Tree Protection Bylaw 7671 ss.7, 9A; coach house checklist |
| City trees | The Tree Bylaw does not apply on Ground Oriented, RS-1, RS-2, RS-4B, RT-1 or RT-2 lots, but Ground Oriented applications carry a tree management plan and arborist report; streamside trees are protected fish habitat | Tree Bylaw 8888 s.2; small Ground Oriented checklist; Streamside page |
| Older buildings | District: a hazardous materials report and clearance letter for buildings built before 1990, before the permit issues | District coach house checklist |
| Construction hours | Both: 7 a.m. to 8 p.m. on weekdays and 9 a.m. to 5 p.m. on Saturdays, with none on Sundays or holidays, unless the District grants an exemption | City Noise Control Bylaw 8885 s.4.4; District Noise Regulation Bylaw 7188 |
| Occupancy | City: a certificate of occupancy, with the address installed first; District: a final inspection notice and an occupancy permit, with work started within six months of the permit and finished within two years | City Bylaw 7390 s.8.11; District Bylaw 8271 ss.5.29-5.30; Building permit (single family home) |
Sources: City of North Vancouver, Ground Oriented Housing, the Ground Oriented Zone Handout, the Low Rise Neighbourhoods development permit guidelines, the small Ground Oriented project checklist, the Residential Project Application Form, How to Submit Construction Permits, Coach House, the Coach House Information Handout, the Accessory Coach House Development Permit Guidelines, the coach house checklist, the Drawing Requirements Information Guide 2026, Construction Regulation Bylaw 7390, Zoning Bylaw 6700, Part 9 Buildings, the November 2023 energy handout, Development Cost Charges Bylaw 8471, Development Cost Charges, Stormwater Management Plan Requirements, Streamside Development Permit Areas, Tree Bylaw 8888 and Noise Control Bylaw 8885; District of North Vancouver, Build a coach house, the Coach House How-To Guide, the coach house checklist, Building permit (single family home), the building permit application form, Electrical permit, Gas permit, Construction Bylaw 8271, the Step Code page, Bylaw 8704, Bylaw 8705, How development funds services and amenities, service connection and related fees, OCP Schedule B, Wildfire Hazard Report SPE115, the Wildfire Hazard DPA page, Tree Protection Bylaw 7671 and Noise Regulation Bylaw 7188; Technical Safety BC, Jurisdiction; Province of British Columbia, Homeowner Protection Act.
From the address to occupancy.
Address & zone
City or District, the zone, any streamside or wildfire permit area, and the trees on and around the lot.
Design & registration
The Step Code pairing for that municipality, stormwater and servicing plans, and BC Housing registration.
Permits & charges
The City’s combined application or the District’s intake, and any District charges at the building permit stage.
Build or set
Foundation and services, then a coach house built on site or a factory-built unit craned in, with barriers in place.
Inspections & occupancy
Checklists at the insulation inspection, the finals, the address on the building, and occupancy.
What's different about a coach house here.
The City and the District issue their own building, electrical and gas permits, so the address decides the route.
The City’s Ground Oriented zone dates from December 2025, and the District’s R2 zone from July 2026, with its coach house guide under review.
$34,365 in District development and amenity cost charges, against a City bylaw that exempts buildings of fewer than four units.
District wildfire hazard reports for new buildings in its wildfire area, and City streamside permits within 15 m of a watercourse.
No two North Shore coach houses price the same.
We don't publish a price for a North Vancouver coach house, because the municipality, the lot, its services and the way the unit is built move the number too far for a single figure to be honest. These are the factors that move it.
City or District
The charges, servicing thresholds and permit route that come with the address.
On site or factory-built
A coach house built on the lot, or site work under a factory-built unit.
Connections, meter & power
New water, sewer or storm connections, and what BC Hydro and FortisBC need.
Soils & stormwater
The geotechnical findings, infiltration and the stormwater plan for the lot.
Wildfire & streams
Fire-resistive materials and a professional’s report, or a streamside permit.
Protection & arborist
Barriers, the arborist’s work and any tree permits.
Answers before you ask.
Both. Kyrax Developments builds coach houses on site as the general contractor, and does the site work for Kyrax Homes’ factory-built units: the foundation, the services and the crane set. What we settle first is which North Vancouver the lot is in, because the City of North Vancouver and the District of North Vancouver each run their own permits under their own bylaws, and Technical Safety BC lists each of them as issuing its own electrical and gas permits. The permit route, the charges and the site rules on this page change with the address. Kyrax Homes describes its factory-built laneway homes and models on its laneway homes page. We also build laneway houses in Vancouver and Burnaby, coach houses in Surrey, and renovate homes in North Vancouver. Source: Technical Safety BC, Jurisdiction, verified September 2026.
Yes, unless the owner builds it as an owner builder. The Homeowner Protection Act counts a detached self-contained dwelling unit as a new home, and a municipality must not issue a building permit for a new home without evidence of home warranty insurance and a licensed residential builder, or of an owner builder. The District’s Construction Bylaw repeats the rule, and its coach house checklist wants the BC Housing New Home Registration Form before the permit issues. The City lists the form in its coach house application checklist, and its checklist for small Ground Oriented projects says the form is required before occupancy is authorized. Kyrax Developments Ltd. holds BC Housing Residential Builder Licence #57802, in good standing, as a General Contractor and Developer; verify it on the BC Housing Licence Registry. Sources: Province of British Columbia, Homeowner Protection Act, sections 1 and 30(1); District of North Vancouver, Construction Bylaw 8271, sections 5.16 to 5.18, and the coach house checklist; City of North Vancouver, the coach house checklist and the small Ground Oriented project checklist, verified September 2026.
It depends on the zone. On December 8, 2025 the City adopted a Ground Oriented zone, which applies mainly to lots previously zoned for houses and duplexes, other than certain heritage areas and properties, and the City’s coach house page says its content does not apply to lots in that zone. There, you start with an inquiry to City staff, who send the form, checklist and fees; one application form covers both the development permit and the building permit, and the development permit guidelines for low-rise neighbourhoods exempt a coach house only in other zones. Complete packages go in digitally, by email or the Province’s Building Permit Hub, with digital seals. Outside that zone, the City’s coach house handout says a coach house needs a development permit and a building permit, submitted and processed together, and suggests contacting the City first about a stream or hazardous slope nearby, an unusual lot shape, a lot with no lane, or a heritage building. Sources: City of North Vancouver, Ground Oriented Housing, the Ground Oriented Zone Handout, Low Rise Neighbourhoods guidelines, How to Submit Construction Permits, Coach House and the Coach House Information Handout, verified September 2026.
Through a building permit intake, after any variance or development permit. The District allows coach houses on lots zoned RS or R2 inside its urban containment boundary; Council adopted the R2 zone for most single-family properties on July 20, 2026, its coach house guide now covers RS zones only and is under review, and R2 coach house rules sit in section 525 of the Zoning Bylaw. Any variance needs a development variance permit before the building permit application, and a lot in a development permit area needs its development permit first. The application goes in at a scheduled intake with the coach house checklist and an owner-signed form, and incomplete packages are not accepted. Half the permit fee is paid, non-refundable, when the package is accepted, and the rest, with the security deposit, before the permit issues. An applicant acting for the owner needs a District business licence. Sources: District of North Vancouver, Build a coach house, the Coach House How-To Guide, Building permit (single family home), the coach house checklist and the building permit application form, verified September 2026.
Each municipality issues its own. Technical Safety BC lists both the City and the District of North Vancouver among the local governments that issue their own electrical and gas permits. In the City, the Construction Regulation Bylaw issues electrical permits only to a registered electrical contractor, a resident owner of a detached single family dwelling without a secondary suite, or a resident tenant of one with the owner’s written permission. In the District, a homeowner may take out an electrical permit and do the work only with no secondary suite, living in the home and with no part of it rented out, and a gas permit only for a detached single-family home with no suite that they live in and work on themselves; otherwise a licensed contractor applies, once the building permit is issued. The District’s checklist also calls for at least a 200 amp service and a separate electrical panel in the coach house and in the main house. Sources: Technical Safety BC, Jurisdiction; City of North Vancouver, Construction Regulation Bylaw 7390, section 8.20; District of North Vancouver, Electrical permit, Gas permit and the coach house checklist, verified September 2026.
A lit path from the street and an address responders can find. In the City’s Ground Oriented zone every dwelling unit must be reachable from a street by a clear path at least 1.0 m wide and well lit at night, and the City’s coach house guidelines for other zones ask for a 1.0 m paved path from the coach house entrance to the street, lit at night and unobstructed, with an address and unit number visible and lit from both the street and the lane. The City’s 2026 drawing guide asks plans to show the nearest hydrant, the fire department response distance and the path’s width and lighting, and the address must be on the building before an occupancy certificate. In the District, the coach house guide gives a coach house the main house’s address with unit number 3, so responders can tell it from a secondary suite, and asks owners to confirm the water system can meet fire flow. Sources: City of North Vancouver, Zoning Bylaw 6700, section 573, Accessory Coach House Development Permit Guidelines, Drawing Requirements Information Guide 2026 and Bylaw 7390, section 8.11; District of North Vancouver, Coach House How-To Guide, verified September 2026.
Step 4 or Step 5, paired differently in each municipality. The City’s Construction Regulation Bylaw requires new Part 9 residential buildings, which its handout says include coach houses, to meet Step 4 with emissions level EL-3 or Step 5 with EL-1; the design verification report and pre-construction checklist go in with the application, the mid-construction checklist at or before the insulation and vapour barrier inspection, and the as-built checklist before the final. The District’s Construction Bylaw requires Step 5, or Step 4 with EL-3, and its Step Code page names coach houses; its coach house checklist wants a certified energy advisor’s GHG calculator, pre-construction and as-built checklists and HOT2000 report, and the District requires a home energy label on or near the electrical panel in each dwelling unit. Sources: City of North Vancouver, Construction Regulation Bylaw 7390, section 8.7.4, Part 9 Buildings and its November 2023 handout; District of North Vancouver, Construction Bylaw 8271, section 14.1, Energy Step Code and Zero Carbon Step Code and the coach house checklist, verified September 2026.
In the District, yes; in the City, the bylaw exempts small buildings. The District’s development cost charge bylaw, adopted December 9, 2024, uses the Local Government Act’s option to charge buildings of fewer than four units and sets $14,720 per coach house, and its amenity cost charge bylaw, adopted February 24, 2025, adds $19,645, for $34,365 in all. The District says both are levied at the building permit stage, and each bylaw fixes the amount on the date a complete application is submitted; the development cost charge does not apply to work of $50,000 or less. The City’s bylaw, consolidated November 3, 2025, charges nothing on a building permit for a building that will hold fewer than four dwelling units used only as housing, or on work of $100,000 or less, and the City says development cost charges are the only such charges that apply there. Sources: District of North Vancouver, Bylaw 8704, Bylaw 8705, How development funds services and amenities and Build a coach house; City of North Vancouver, Development Cost Charges Bylaw 8471, section 5, and Development Cost Charges, verified September 2026.
Often new connections, on rules the District says cannot be waived. The District allows one sanitary, storm and water connection per lot, with exceptions only at its Utilities department’s discretion, requires a water meter and an inspection chamber, and bills coach house servicing at single-family rates. A building permit valued at $300,000 or more needs a new water connection unless the existing one is under 20 years old, and at $200,000 or more new sanitary and storm connections unless they are under 30 years old, in good condition and to current standards, and possibly new curbing across the frontage; the owner pays. The coach house checklist adds a stormwater management plan sealed by a professional engineer that holds hard-surface flow to the pre-development 2-year, 24-hour rate, and a geotechnical report with a test hole and percolation test. BC Hydro and FortisBC connections are extra. Sources: District of North Vancouver, Coach House How-To Guide, Understanding service connection and related fees and the coach house checklist, verified September 2026.
City connections and a stormwater plan. The City’s Construction Regulation Bylaw connects every building with plumbing fixtures to the City water system and, where a sewer runs in the lane, easement or street beside the lot, to the sanitary sewer; sends all roofed and paved surfaces to storm drainage; and keeps a sewer from running under any building other than the one it serves or an ancillary building on the same lot. A new or modified overhead electrical service must sit where it can be fed from the lane, now or later. The City requires a stormwater management plan with a coach house building permit, showing how the lot meets its infiltration targets. For small Ground Oriented projects its checklist also asks for a sealed servicing plan, an off-site civil cost estimate with a 20% contingency where off-site works are required, and an undertaking to put BC Hydro, FortisBC and communications connections underground where required. Sources: City of North Vancouver, Construction Regulation Bylaw 7390, sections 8.14.2 and 8.23, Stormwater Management Plan Requirements for New Development and the small Ground Oriented project checklist, verified September 2026.
Yes, if the lot is in the Wildfire Hazard development permit area. The District’s Official Community Plan exempts all development there from the wildfire permit except a new building or structure that needs a building permit, and its master requirement SPE115 accepts a building permit application for a new building with habitable space only with a wildfire hazard report signed off by a qualified professional. The report sets conditions such as Class A fire-rated roofing, a fuel-free area within 1.5 m of the building and low-flammability planting out to 10 m, and before the occupancy permit the professional inspects and signs off the mitigation. The plan’s guidelines add 3 mm non-combustible mesh over vents and openings, fire-resistive exterior walls and decking, tempered or double-glazed windows and spark arrestors. Sources: District of North Vancouver, Official Community Plan, Schedule B, Wildfire Hazard Report SPE115 and Wildfire Hazard Development Permit Area, verified September 2026.
In the District, protected and large trees; in the City, it depends on the zone. The District’s Tree Protection Bylaw needs a tree permit to cut or damage a protected tree, which includes trees on District land such as boulevards and lanes, on steep slopes, in streamside, natural environment and slope hazard permit areas, and species such as arbutus and Garry oak, or any tree 75 cm in diameter or more. Retained trees get a barrier the District inspects and approves before work starts, and the coach house checklist wants an arborist report and tree management plan at intake. The City’s Tree Bylaw does not apply on lots zoned Ground Oriented or RS-1, RS-2, RS-4B, RT-1 or RT-2, but its Ground Oriented checklist still asks for a tree management plan and a certified arborist’s report, and trees in the streamside protection area are protected as fish habitat. Sources: District of North Vancouver, Tree Protection Bylaw 7671, sections 7 and 9A, and the coach house checklist; City of North Vancouver, Tree Bylaw 8888, section 2, the small Ground Oriented project checklist and Streamside Development Permit Areas, verified September 2026.
Ready to plan a coach house?
We start with a walkthrough, a scope document, and a straight answer on which permits and approvals apply. Initial consultations are complimentary.
Start a project