Custom Home Builder in Vancouver, BC
Kyrax Developments builds custom homes in Vancouver as a BC Housing licensed residential builder, licence #57802. Vancouver runs its own building by-law, so a new house here meets the City’s energy and greenhouse gas limits and is tested for airtightness at mid-construction and again at the end. The City will not accept the development and building application until the sewer and water application is in, a house built before 1950 comes down under the Green Demolition By-law, and from September 30, 2026 a new amenity cost charge sits on top of development cost levies.
A custom home, sewer permit to handover.
Lot, survey & trees
A land surveyor’s plan dated within six months, an arborist’s report where there are permit-sized trees, and geotechnical work where the ground calls for it.
Sewer, water & the permit
The sewer and water application first, then the combined development and building permit through the City’s portal.
Energy & emissions
A house designed to the by-law’s heat demand limit and one of its three greenhouse gas options, with blower door tests mid-build and at the end.
Demolition
The tree barrier and pre-demolition inspection, the hazardous materials assessment, and the reuse and recycling an older house requires.
Levies & charges
Development cost levies and, from September 30, 2026, the amenity cost charge, settled at or before building permit issuance.
Inspections & handover
Inspections booked ahead, replacement trees planted before occupancy, and the warranty package at handover.
What Vancouver requires of a new house.
Vancouver writes its own building by-law and sets its own charges, so a new house here follows a City sequence: sewer and water, the combined permit, green demolition for an older house, then the levies and, from September 30, 2026, the amenity cost charge.
| Stage | What Vancouver requires | Where it says so |
|---|---|---|
| Sewer and water first | One combined residential sewer and water permit, applied for before the development and building application, which the City does not accept until the sewer and water application is in | Sewer and water connection permits; DB submission requirements, May 2026 |
| Application | A combined development and building permit through the City’s online portal; a separate development permit only for large projects, zoning relaxations or particular land uses | Low Density Housing Options How-to Guide s.1.2; Building permit page |
| Survey and reports | A BC land surveyor’s survey plan dated within six months of application; an ISA certified arborist’s report where there are permit-sized trees; a geotechnical report on peat, liquefiable soil, flood plain or artesian ground | DB submission requirements, May 2026 |
| Energy | Thermal energy demand intensity of 20 kWh/m² a year or less plus the mechanical energy use target for the floor area, under the by-law in effect since September 15, 2025 | VBBL 2025 Art. 10.2.2.4.(3); Energy requirements for homes |
| Greenhouse gas | One of three options: 265 kg CO2e a year; 1.5 kg/m² a year and 500 kg in total; or electricity for all building systems. Over 325 m² of conditioned space, a 2,000 kg a year limit that counts exterior gas equipment | VBBL 2025 Art. 10.2.2.4.(5)-(6), Table 10.2.2.4.B |
| Airtightness | A mid-construction energy checklist with a blower door test, then a final as-built report with another, against 2.5 ACH50 in the by-law’s table | VBBL 2025 Art. 10.2.2.20; Table 10.2.2.21.A |
| Before demolition | A tree barrier and pre-demolition inspection before the demolition permit issues; no stand-alone salvage and abatement permit since July 28, 2026 | Bulletin 2026-002-BU |
| Hazardous materials | The hazardous building materials assessment, by a qualified professional with WorkSafeBC Level S certification, and any post-abatement clearance before machine-assisted demolition; services disconnected first | Bulletin 2026-002-BU |
| Green demolition | Pre-1950 houses: 75% of materials reused or recycled by weight, 90% for character houses; pre-1910 or heritage-listed: deconstruction salvaging at least three tonnes of wood; $15,310 security and $469 fee | Green Demolition By-law 11023 ss.3.2-3.4, 5.1, 6.1 |
| After demolition | The compliance report within 30 days, and no building inspections until it is submitted; the City’s demolition fee for a single detached house is $1,570 | By-law 11023 s.8.1; recycling requirements page; 2026 Schedule of Fees |
| Development cost levies | $49.88 plus $31.25 utilities, $81.13 per m² for residential at or below 1.2 FSR, at building permit issuance and the rate then in effect; $51.38 plus $32.19 from September 30, 2027 | DCL By-law 9755 s.3.3; By-laws 14817 and 14818; DCL Bulletin, August 25, 2026 |
| Amenity cost charge | From September 30, 2026: $24.97 per m² for the same category, before the building permit issues; not payable for a same-use replacement no larger than the last building of record; in-stream applications before that date not subject to it, in the City’s words | ACC By-law 14816 ss.3.9, 4.1; ACC Bulletin; Community benefits from development |
| Sewer connection | New for a new house unless the City Engineer approves the old one after a certified video inspection; $21,656, with $2,200 non-refundable at application | Sewer and Watercourse By-law 8093 ss.2.2, 2.9, Schedule A |
| Water service | An existing service pipe reusable only at 50 mm or less and 24 years old or less, at 20% of the fee; a new 20 mm connection $11,127 | Water Works By-law 4848 ss.2.6, 2.8, Schedule A |
| Building grades | Existing site grades accepted for principal buildings in R1-1, unless a City lane is unopened, a road dedication is requested or an established building line applies | Building Grades bulletin, last amended October 19, 2023 |
| Trees | Protected from 20 cm; removal approved with the development and building permit; barriers for trees kept on site, next door within 2 m and on the street, inspected before demolition, excavation or construction permits; replacements before occupancy | Protection of Trees By-law 9958 ss.2.2, 6.6, 7.5, 7.9; Tree removal permit |
| On the street | A crossing permit for a driveway from a street, forms inspected before pouring; a construction street use request after the building permit application | Crossing By-law 4644 s.3; Inspections; Construction street use permits |
| Hours and signage | 7:30 a.m. to 8 p.m. weekdays, 10 a.m. to 8 p.m. Saturdays, none on Sundays or holidays; a posted sign naming the general contractor | Noise Control By-law 6555 ss.3.1(h), 3.3 |
| Permit life and inspections | Work begins within 6 months of issue; inspections requested before 2 p.m. on a business day aimed for the next business day, otherwise two business days later | Build page, step 6; Inspections |
| Occupancy | Not required by the City for a house; an occupancy permit can still be requested for $314 | Occupancy permit page; 2026 Schedule of Fees |
Sources: City of Vancouver, Build a new duplex, single detached house, or laneway house, Sewer and water connection permits, the DB submission requirements for an outright single detached house or duplex, the Low Density Housing Options How-to Guide, Building permit, Vancouver Building By-law 2025, Energy requirements and resources for homes, Bulletin 2026-002-BU, Green Demolition By-law No. 11023, Demolition permit with recycling requirements, the 2026 Schedule of Fees, Development Cost Levy By-law No. 9755, By-law No. 14817, By-law No. 14818, the Development Cost Levies Bulletin, Amenity Cost Charge By-law No. 14816, the Amenity Cost Charges Bulletin, Community benefits from development, Sewer and Watercourse By-law No. 8093, Water Works By-law No. 4848, the Building Grades bulletin, Crossing By-law No. 4644, Construction street use permits, Protection of Trees By-law No. 9958, Tree removal permit, Noise Control By-law No. 6555, Inspections and Occupancy permit; BC Housing, Register a New Home.
From sewer and water to warranty handover.
Lot, trees & grades
The survey plan, the arborist’s report on trees to keep and remove, and whether the lot’s existing grades are accepted.
Sewer, water & design
The sewer and water application first, a design to the by-law’s energy and greenhouse gas options, and the home registered with BC Housing.
Development & building permit
The combined application through the City’s portal, then the levies and, from September 30, 2026, the amenity cost charge before issue.
Demolition
The tree barrier and pre-demolition inspection, the hazardous materials assessment, services disconnected, and the recycling report for an older house.
Construction & handover
The site sign and approved drawings on site, blower door tests mid-build and at the end, replacement trees planted, then the warranty package.
What makes building in Vancouver different.
The City will not accept the development and building application until the sewer and water application has been submitted.
The Vancouver Building By-law 2025 sets a heat demand limit, three greenhouse gas options and 2.5 ACH50 airtightness for a new house.
A house from before 1950 carries a 75% reuse and recycling condition and a $15,310 security; one from 1950 on has no required rate.
From September 30, 2026, the amenity cost charge adds $24.97 per m² on top of development cost levies, unless the application was already in stream.
Why a Vancouver custom home has no set price.
We don't publish a price per square foot for a Vancouver custom home, because the lot, the old house on it and the energy route chosen move the number too far for a single figure to be honest. These are the factors that move it.
Trees, grades & soil
Protected trees and their barriers, the lot’s grades, and geotechnical work on peat, liquefiable soil or artesian ground.
Demolition by build year
Hazardous materials work, and the reuse, recycling or deconstruction an older house requires.
Heat demand & emissions
The envelope and systems that meet the heat demand limit, the greenhouse gas option chosen and two blower door tests.
Levies & amenity charge
Set per square metre of floor area and settled at or before building permit issuance.
Sewer & water
A new sewer connection unless the old one passes the City’s review, and a water service reusable only if small and young enough.
Permit & start
The City’s permit review before construction, and a start inside six months of issue.
Answers before you ask.
Yes, for a home built under contract. BC Housing says that before you can obtain a building permit you need a New Home Registration Form as proof of licensing and home warranty insurance, and that in a custom-home contract the general contractor is the one licensed, who registers and enrols the home, not the homeowner. In Vancouver that registration runs alongside the City’s own sewer and water application and its combined development and building permit. Kyrax Developments Ltd. holds BC Housing Residential Builder Licence #57802, in good standing, as a General Contractor and Developer; verify it on the BC Housing Licence Registry. Source: BC Housing, Register a New Home, verified September 2026.
The sewer and water application comes first. The City’s May 2026 checklist for an outright single detached house or duplex calls a sewer and water application a prerequisite and says a development and building application will not be accepted if it has not been submitted. The house then goes in as one combined development and building permit through the City’s online portal, with a survey plan by a BC land surveyor dated within six months of the application, an arborist report by an ISA certified arborist where there are permit-sized trees on or next to the site, and a geotechnical report where the site is in a known peat bog area, on soil subject to liquefaction, in a flood plain or in an artesian well area. A separate development permit comes first only for large projects, zoning relaxations or particular land uses. Once the permit issues, work has to begin within 6 months or the permit becomes invalid. Sources: City of Vancouver, DB application submission requirements for an outright single detached house or duplex (May 2026), the Low Density Housing Options How-to Guide, Building permit and Build a new duplex, single detached house, or laneway house, verified September 2026.
The City’s own building by-law. Under the Vancouver Building By-law 2025, in effect since September 15, 2025, a new house on the performance path meets a thermal energy demand intensity of no more than 20 kWh per square metre a year and a mechanical energy use target set by floor area, and it takes one of three greenhouse gas options: no more than 265 kg CO2e a year; no more than 1.5 kg per square metre a year and 500 kg in total; or electricity for all building systems, including equipment and appliances. A house with more than 325 m² of conditioned space must also show it stays within 2,000 kg CO2e a year, counting exterior gas equipment. The City says the by-law has been aligned with the top tier, EL-4, of the BC Zero Carbon Step Code since March 1, 2025. An older line on the same City page, written for 2022, still says most new low-rise homes need electric space heating and hot water; the by-law in force sets the three options instead. Sources: City of Vancouver, Vancouver Building By-law 2025, Book I, Article 10.2.2.4.(3), (5) and (6) and Table 10.2.2.4.B, and Energy requirements and resources for homes, verified September 2026.
Twice, with a blower door. The Vancouver Building By-law 2025 has the owner give the building official a mid-construction energy checklist that includes a completed blower door test, then a final as-built report at project completion that includes another, and the City’s new homes energy checklist says the mid-construction checklist goes in at the sheathing or insulation inspection. The by-law’s airtightness table sets 2.5 air changes per hour at 50 pascals (ACH50) for all buildings in its scope. Sources: City of Vancouver, Vancouver Building By-law 2025, Book I, Articles 10.2.2.20 and 10.2.2.21 and Table 10.2.2.21.A, and Energy requirements and resources for homes, verified September 2026.
A demolition permit, gated by inspections rather than a second permit. The City’s bulletin of July 28, 2026 removed the stand-alone salvage and abatement permit. A tree barrier and pre-demolition inspection now comes before the demolition permit issues; before machine-assisted demolition, the hazardous building materials assessment report goes in, with a post-abatement clearance report where abatement was needed; and a reuse and recycling compliance report with receipts follows the demolition where recycling applies. The assessment is signed by a qualified professional holding WorkSafeBC Level S certification and a listed designation, and the demolition contractor must have all utility and City services disconnected before mechanically assisted demolition starts. The City’s fee to demolish a single detached house that has provided residential occupancy since November 1, 1986 is $1,570. Sources: City of Vancouver, Bulletin 2026-002-BU, Demolition of Buildings (July 28, 2026) and the 2026 Schedule of Fees, verified September 2026.
It depends on when the house was built. Every demolition permit for a house built in whole or in part before 1950 carries a condition that at least 75% of its building materials, by weight and excluding hazardous materials, are reused or recycled, or 90% for a character house; a house from before 1910, or a heritage-listed house from before 1950, must also be deconstructed to salvage at least three tonnes of wood. Those permits carry a $15,310 security, refunded according to the rate achieved, and a $469 fee, the compliance report is due within 30 days of the demolition finishing, and the City says building inspections cannot be requested until it has been submitted. For a house built in or after 1950, the City says there is no required reuse and recycling rate. Sources: City of Vancouver, Green Demolition By-law No. 11023, sections 3.2 to 3.4, 5.1, 5.2, 6.1 and 8.1, Demolition permit with recycling and deconstruction requirements and Demolition with no recycling requirements, verified September 2026.
Development cost levies now, and an amenity cost charge from September 30, 2026. The Development Cost Levy By-law makes the levy payable on a building permit for a building with fewer than four self-contained dwelling units in residential use; its rule that charges only added floor area is for alterations and extensions, which the City’s bulletin says do not include demolition and replacement. For residential at or below 1.2 FSR the rates are $49.88 plus $31.25 for utilities, $81.13 per square metre, collected at building permit issuance at the rate then in effect, and the amending by-laws in force September 30, 2026 step that category to $51.38 plus $32.19 on September 30, 2027. The new Amenity Cost Charge By-law adds $24.97 per square metre for the same category, paid before the building permit issues, except for a same-use replacement no larger than the last building of record on the lot; the City says applications in-stream before September 30, 2026 are not subject to it. Sources: City of Vancouver, Development Cost Levy By-law No. 9755, sections 3.3 and 3.4, By-laws No. 14817 and No. 14818, the Development Cost Levies Bulletin, Amenity Cost Charge By-law No. 14816, sections 3.9 and 4.1, and Community benefits from development, verified September 2026.
Only with the City Engineer’s approval. Vancouver’s Sewer and Watercourse By-law requires a new public sewer connection whenever a new house is constructed, unless the City Engineer approves the existing one: adequately sized, not a combined connection, made of PVC, in good condition, and backed by a video inspection report from a PACP/LACP certified contractor. A new connection for a single detached house, with or without a laneway house, is $21,656, with $2,200 of it non-refundable at application. On the water side, the Engineer may approve reconnecting an existing service pipe only if it measures no more than 50 mm and is no more than 24 years old, for 20% of the connection fee where one was paid before; a new 20 mm connection is $11,127. Sources: City of Vancouver, Sewer and Watercourse By-law No. 8093, sections 2.2 and 2.9 and Schedule A, and Water Works By-law No. 4848, sections 2.6 and 2.8 and Schedule A, verified September 2026.
Only as the Protection of Trees By-law allows, and it protects trees of 20 cm or more measured 1.4 m above the ground. For a new house, removal is approved as part of the development and building permit, and the by-law allows a permit where a tree sits inside the building envelope and re-siting an accessory building to keep it is not possible. The application includes an arborist’s report on the trees and the development’s impact, and protection barriers go up for each tree being kept on the site, on neighbouring land within two metres of the boundary and on the adjacent street before demolition, excavation or construction begins; no permit for demolition, excavation or construction is issued until the City has inspected and approved them. Replacement trees are planted before an occupancy permit issues, or before occupancy where none is required, with a security of $500 per replacement tree, or $750 for one of 8 cm caliper or more. Sources: City of Vancouver, Protection of Trees By-law No. 9958, sections 2.2, 4.5, 4.10, 6.6, 7.2, 7.5 and 7.9, and Tree removal permit, verified September 2026.
On our projects, a custom home runs 12 to 18 months from permit to handover. That is our own clock, and it starts once the permit is in hand. For the permit, the City’s table headed “Permit processing times for August 2026” shows a median elapsed time of 20.0 weeks across 60 issued permits in its “New Build - Low Density Housing” category, and the City’s Open Data definition of that elapsed time runs from the creation of the permit number to the issuance of the permit, weekends and holidays included. Once the permit issues, work has to begin within 6 months, and an inspection requested before 2 p.m. on a business day is aimed for the next business day. Sources: City of Vancouver, Build a new duplex, single detached house, or laneway house (table read September 15, 2026), the issued building permits dataset on its Open Data portal, and Inspections, verified September 2026.
Set hours, a posted sign and the drawings on site. On private property the Noise Control By-law allows construction noise from 7:30 a.m. to 8 p.m. on weekdays and 10 a.m. to 8 p.m. on Saturdays, with none on Sundays or holidays, and caps it at 85 dBA at the property line nearest the neighbour. The owner must post a sign at least 42.5 cm high and 27.5 cm wide, visible from an adjacent street, naming the general contractor and a contact, the by-law sections that apply and the City’s complaint line. A paper set of the City-approved drawings with the City’s stamp has to be at the jobsite for inspectors, and a driveway crossing from a street needs a crossing permit, with the forms checked at a sidewalk inspection before any concrete or asphalt is poured. Sources: City of Vancouver, Noise Control By-law No. 6555, sections 3.1(h) and 3.3, Noise from construction, Building permit, Crossing By-law No. 4644, section 3, and Inspections, verified September 2026.
Yes to both. Kyrax Developments Ltd. holds BC Housing Residential Builder Licence #57802, in good standing, as a General Contractor and Developer; verify it on the BC Housing Licence Registry. Laneway homes in Vancouver are covered on our Vancouver laneway house page, renovations on our Vancouver home renovations page, and custom homes elsewhere on our Surrey, Langley, Burnaby and Abbotsford pages.