(01) — Kitchen Renovations

Kitchen Renovations in Burnaby, BC

Kyrax Developments renovates kitchens across Burnaby as a licensed general contractor. Burnaby is one of the few municipalities that permits everything a kitchen touches itself — building, plumbing, gas, electrical and heating — and it treats an interior kitchen change as an alteration, which means a permit even when no floor area is added.

(02) — What's included

A full kitchen renovation, start to finish.

01

Asbestos survey & demolition

We work to WorkSafeBC regulations: materials to be disturbed are tested for asbestos before demolition, and abatement is done by a licensed contractor.

02

Layout & walls

Interior changes that add no floor area are alterations in Burnaby, and alterations need a permit — applied for online through the City’s portal.

03

Plumbing

Moved or added sinks and dishwasher lines under a City plumbing permit, which Burnaby requires for installing, changing or upgrading any part of a plumbing system.

04

Gas

Ranges, cooktops and gas lines under a City gas permit — Burnaby issues its own, unlike most of the region, up to 409,000 BTU.

05

Electrical

Circuits, lighting and hard-wired appliances under a City electrical permit, which Burnaby requires for any electrical work in a house or duplex.

06

Cabinets, counters & finishes

Cabinets set and levelled, counters templated and installed, backsplash and flooring finished to your selections.

(03) — Burnaby permits

Which permits a Burnaby kitchen can need.

One city hall for all of it: the alteration permit for the work itself, and the City’s own plumbing, gas, electrical and heating permits for the trades.

From the City of Burnaby’s Home Improvement Permits and Residential Trade Permits pages and its Noise or Sound Abatement Bylaw, read September 11, 2026, with Technical Safety BC’s jurisdiction list.
Kitchen workWhat Burnaby requiresWhere it says so
A kitchen renovation that adds no floor areaAn alteration permit, applied for online through My Permits PortalHome Improvement Permits
Installing, changing or upgrading any part of the plumbingCity plumbing permit; no fixture-swap exemption is listedResidential Trade Permits
Installing, modifying or upgrading any part of the gas systemCity gas permit; installations over 409,000 BTU go to the provincial safety authorityResidential Trade Permits
Any electrical work or installationCity electrical permitResidential Trade Permits
Installing or replacing heating or cooling equipmentHeating system permit, forced-air or hydronicResidential Trade Permits
Fire sprinklersCity fire sprinkler permitResidential Trade Permits
Applying for trade permitsElectrical, gas and plumbing online through My Permits Portal, or in personResidential Trade Permits
How the building permit arrivesDigital only, for permits submitted on or after January 1, 2026 and issued on or after March 31, 2026Home Improvement Permits
What has to be on siteThe permit package printed at 36 by 24 inches, in its true issued colour, kept on site for inspectionsHome Improvement Permits
Before the building permitSince July 1, 2026, some projects need a development permit firstHome Improvement Permits
Construction hours7 a.m. to 8 p.m. weekdays, 9 a.m. to 8 p.m. Saturdays, none on Sundays or statutory holidays; an owner-occupier may work 9 a.m. to 8 p.m. on Sundays and holidaysNoise or Sound Abatement Bylaw, s.15
Unpermitted work found laterThe owner is responsible even if it predates their ownership, and insurance may not cover itHome Improvement Permits

Sources: City of Burnaby, Home Improvement Permits, Residential Trade Permits and Noise or Sound Abatement Bylaw (section 15); Technical Safety BC, Jurisdiction.

(04) — How we work

From walkthrough to final inspection.

Kitchen rough-in before drywall
01

Walkthrough & scope

We map the sink, range, gas line, circuits and walls, and check whether the project is one of those now needing a development permit first.

02

Permits

The alteration permit through My Permits Portal, then the City’s plumbing, gas and electrical permits — all from the same city hall.

03

Survey, demolition & rough-in

Asbestos survey first, demolition inside the bylaw’s hours, then plumbing, gas and electrical rough-ins inspected before the walls close.

04

Cabinets, counters & finishes

Cabinets set and levelled, counters templated and installed, backsplash and flooring finished.

05

Appliances & final inspections

Appliances connected and every trade inspected, with the printed permit package on site as the City requires.

(05) — Burnaby considerations

What's different about a Burnaby kitchen.

One authority

Burnaby issues the building, plumbing, gas, electrical and heating permits itself. Next door in Coquitlam and Langley, gas and electrical belong to Technical Safety BC, and in Surrey the City issues electrical but not gas.

Alterations need permits

A kitchen that adds no floor area is still an alteration in Burnaby, and alterations need a permit — so a layout change here is not the paperwork-free job it can look like elsewhere.

Paper on site, permits digital

Permits now arrive digitally, and the City still requires the package printed at 36 by 24 inches in true colour and kept on site for inspections.

A new step in front

Since July 1, 2026 some projects need a development permit before the building permit can even be submitted, which changes the order of a renovation schedule.

(06) — What affects cost

No two kitchen renovations price the same.

We don't publish a flat price for a Burnaby kitchen renovation, because scope varies too much from one home to the next for a single number to be honest. These are the factors that move the estimate.

Layout

Sink and range stay or move

Moving the sink or adding a dishwasher line brings a plumbing permit, and a new or relocated gas range brings a gas permit.

Cabinetry

Cabinet & counter tier

Cabinetry and countertops span a wide range and usually set the budget more than any other line.

Permits

Four counters, one city hall

The alteration permit plus plumbing, gas and electrical permits each carry their own fee and inspection.

Sequence

A development permit first

Where the City now requires a development permit ahead of the building permit, that step lands before anything is drawn for construction.

Electrical

Circuits & appliances

Any electrical work needs a permit in Burnaby, so added circuits for appliances are permitted work rather than an afterthought.

Asbestos

Survey first

If the survey finds asbestos in the materials being disturbed, licensed abatement comes before demolition — a separate contractor and a separate line item.

(07) — Common questions

Answers before you ask.

In most cases yes, because Burnaby treats it as an alteration. The City classifies changes to an existing building that do not create additional floor area as Alterations, says these may include modifications to the interior of your home, and says those projects require a permit, applied for online through its My Permits Portal. On top of the building permit, the kitchen's plumbing, gas and electrical work each need their own City trade permit. Sources: City of Burnaby, Home Improvement Permits and Residential Trade Permits, verified September 2026.

All the ones a kitchen touches. Burnaby issues electrical, plumbing, gas, heating and fire sprinkler permits for single-family and duplex dwellings, and takes electrical, gas and plumbing applications online through My Permits Portal as well as in person. That makes it unusual: Technical Safety BC lists Burnaby among the few local governments that issue their own electrical and gas permits, where most of Metro Vancouver sends gas, electrical or both to the province. Sources: City of Burnaby, Residential Trade Permits; Technical Safety BC, Jurisdiction, verified September 2026.

Yes, on the City's own wording. Burnaby says installing, making changes to or upgrading any part of a plumbing system in a single or duplex dwelling requires a permit, and its trade permit page lists no exemption for simply swapping a fixture — which is a real difference from Coquitlam, whose bylaw exempts replacing a plumbing fixture outright. Because the line between a replacement and a change is the City's to draw, we confirm the scope with Burnaby before treating any of it as permit-free. Source: City of Burnaby, Residential Trade Permits, verified September 2026.

Yes, and it comes from the City rather than the province. Burnaby says installing, modifying or upgrading any part of a gas system in a single or duplex dwelling requires a gas permit, with online applications for complete installations, piping, repairs and replacements, and venting and hook-ups. Only larger work leaves the City: gas installations over 409,000 BTU are permitted by the provincial safety authority. Source: City of Burnaby, Residential Trade Permits, verified September 2026.

Yes. The City's rule is broad: any electrical work or installation for a single-family or duplex dwelling requires an electrical permit application, which covers the circuits, lighting and hard-wired appliances a kitchen adds. Burnaby publishes an informational guide for homeowners applying for electrical permits, and the work falls under its own Electrical Bylaw and Electrical Connection Regulation Bylaw. Source: City of Burnaby, Residential Trade Permits, verified September 2026.

Two changes landed in 2026. Building permits submitted on or after January 1, 2026 and issued on or after March 31, 2026 are processed and provided digitally only, with commercial tenant improvements and residential restoration applications the exceptions that stay on paper; the applicant has to print the permit package with drawings at their approved size of 36 by 24 inches, in their true issued colour, and keep a printed copy on site for inspections. And effective July 1, 2026, the City says some projects now need a Development Permit before a Building Permit can be submitted or issued. Source: City of Burnaby, Home Improvement Permits, verified September 2026.

The City doesn't publish a processing time on the permit pages we read. What it does publish is a change to the sequence: since July 1, 2026 some projects need a development permit before the building permit can be submitted or issued, which adds a step ahead of the one most people are counting. Trade permits for plumbing, gas and electrical are applied for separately, online or in person. Sources: City of Burnaby, Home Improvement Permits and Residential Trade Permits, verified September 2026.

Under Burnaby's Noise or Sound Abatement Bylaw, construction, alteration or repair work may run from 7 a.m. to 8 p.m. Monday to Friday and from 9 a.m. to 8 p.m. on Saturday, and not at all on Sunday or a statutory holiday. The exception is the registered owner and occupier of a home in a residential district, who may have alteration or repair work done on that home, personally or through a contractor, after 9 a.m. and before 8 p.m. on Sundays and statutory holidays. Source: City of Burnaby, Noise or Sound Abatement Bylaw, section 15, verified September 2026.

The City says the homeowner is responsible for any unpermitted work on the property, even if that work happened before they owned it, and that unpermitted work is generally not covered by home insurance and may compromise the coverage of the rest of the property. Its advice is to contact the Building Department to confirm the unpermitted work and then apply for the appropriate permits. Source: City of Burnaby, Home Improvement Permits, verified September 2026.

Often, yes. The Standard Bylaws under BC's Strata Property Act require written strata approval before an owner alters common property inside the unit or the parts of the unit the strata must insure. That rule is provincial, so it applies the same way in Burnaby as anywhere else in BC. Source: Strata Property Act, Schedule of Standard Bylaws, section 5, verified September 2026. The full list of what needs approval is in our answer on strata approval.

WorkSafeBC's guidance is yes. It tells homeowners to get their home tested for asbestos before starting a renovation or demolition project, noting that many older homes contain some form of it, and says any asbestos found must be properly removed or contained before the project can begin; if only some areas will be renovated, only those need to be surveyed. Since January 1, 2024, asbestos abatement contractors must be licensed in BC and their workers trained and certified. Sources: WorkSafeBC, Asbestos: Frequently asked questions for homeowners and New asbestos certification and licensing requirements now in effect, verified September 2026.

Yes. Kyrax Developments Ltd. holds BC Housing Residential Builder Licence #57802, in good standing, as a General Contractor and Developer, and where a kitchen renovation needs permits they are pulled and inspected the same as any other licensed scope of work; verify the licence on the BC Housing Licence Registry. Our other Burnaby pages cover home renovations, bathrooms and basement suites.

Ready to renovate your kitchen?

We start with a walkthrough, a scope document, and a straight answer on which permits and approvals apply. Initial consultations are complimentary.

Start a project