(01) — Kitchen Renovations

Kitchen Renovations in Vancouver, BC

Kyrax Developments renovates kitchens in Vancouver houses and condos as a licensed general contractor. A Vancouver kitchen can touch four City permits — building, plumbing, gas and electrical — plus the strata in a condo, and it is built to the City's own Building By-law. We run every permit and every trade under one accountable team.

(02) — What's included

A full kitchen renovation, start to finish.

01

Asbestos survey & demolition

The materials coming out are tested for asbestos first, as WorkSafeBC directs; then cabinets, counters, flooring and drywall come out, with debris hauled away as part of the scope.

02

Layout & walls

Opening the kitchen to the living space means moving an interior wall — a permit item in Vancouver — so we establish whether the wall carries load before a design depends on removing it.

03

Plumbing & gas

Relocated sinks, dishwashers and gas lines — plumbing and gas are separate City of Vancouver permits — done under permit and inspected.

04

Electrical & ventilation

New appliance circuits, task and ceiling lighting, and a range hood ducted to the outside, installed under an electrical permit.

05

Cabinets, counters & finishes

Cabinets, counters, backsplash and flooring to your selections. Replacing cabinets or flooring in the same layout needs no City permit.

06

Appliances

Appliances installed and connected, with any new range or cooktop matched to its circuit — and, in a condo building of five or more units, checked against the City's 3,000-watt NELI threshold.

(03) — Vancouver permits

Which City permits a kitchen can need.

A kitchen that keeps its layout can need none of these; one that moves the sink, the range and a wall can need all five. The City publishes processing figures for some permit types and not others.

City of Vancouver figures by permit type. “Not listed” means the City's page for that permit, read on September 10, 2026, gives no processing time.
Permit typeCity targetCity-reported resultAs ofSource
Simple renovationNot stated92% issued within three daysJune 9, 2026City news release
Electrical, simple95% within 5 business daysTarget met for 95% over the last three monthsSeptember 1, 2026Electrical permit
Electrical, plan review95% within 25 business daysTarget met for 93% over the last three monthsSeptember 1, 2026Electrical permit
PlumbingNot listedNot listedPage read September 10, 2026Plumbing permit
GasNot listedNot listedPage read September 10, 2026Get a gas permit

Our own measure runs on a different clock. Across every permit the City issued in 2026, to late August, the median was 62 days from application to issue. That counts all permit types, from simple renovations to new buildings, so it overstates the wait for a simple kitchen job; the City's figures above are its own measures for each permit type. The method is in our answer on Vancouver building permit times.

(04) — How we work

From walkthrough to final inspection.

Cabinet install and counter template
01

Walkthrough & layout

We map the plumbing, gas and electrical runs and the walls involved, and establish which of the City's permits the design will need.

02

Design, permits & strata

Design and selections confirmed. Building, plumbing, gas and electrical permit applications go in as the scope requires; in a condo, the strata alteration request goes in at the same time.

03

Survey, demolition & rough-in

Asbestos survey of the materials coming out, then demolition, then plumbing, gas and electrical rough-ins inspected before any wall closes.

04

Cabinets, counters & finishes

Cabinets set and levelled, counters templated and installed, backsplash and flooring finished.

05

Appliances & final inspections

Appliances connected, final City inspections booked for every permit issued, and the kitchen handed back to you.

(05) — Vancouver considerations

What's different about a Vancouver kitchen.

Its own code

The BC Building Code applies across the province with a few exceptions, and the City of Vancouver is one. Vancouver adopts its own Building By-law under the Vancouver Charter — the most recent edition the City lists is 2025. A crew used to Surrey or Langley is working under a different by-law here.

Four permits

A full Vancouver kitchen can need four City permits: a building permit when walls or existing lines move, and plumbing, gas and electrical permits for the work in each trade. Replacing cabinets or flooring in the same layout needs none of them. Start permitted work without a permit and the penalty is typically double the fee — billed to the homeowner.

Condos

Three rules stack in a strata building: the strata's written approval for altering common property or insured parts of the unit; a City permit for drywall repairs to fire separations in multi-unit residential buildings; and, in existing buildings of five or more units, the City's NELI form for new electrical loads over 3,000 watts within a unit. Our condo renovations page covers the strata side.

Asbestos

WorkSafeBC tells homeowners to test for asbestos before a renovation begins, and anything found must be removed or contained before work starts. Since January 2024 that removal has to be done by a licensed abatement contractor, so it belongs in the schedule from day one.

(06) — What affects cost

No two kitchen renovations price the same.

We don't publish a flat price for a Vancouver kitchen renovation, because scope varies too much from one home to the next for a single number to be honest. These are the factors that move the estimate.

Layout

Sink and range stay or move

Keeping the sink and dishwasher where they are avoids plumbing permit work, and keeping the range in place avoids running new gas lines; moving them adds both.

Cabinetry

Cabinet & counter tier

Cabinetry and countertops span a wide range and usually set the budget more than any other line.

Walls

Opening a wall

Removing or moving a wall adds a building permit, and a load-bearing wall needs a structural solution before it comes out.

Electrical

New circuits & loads

New appliance circuits and lighting are permitted electrical work, and in condo buildings of five or more units a new load over 3,000 watts brings the NELI form into the application.

Strata

Strata conditions

A strata can make its approval conditional on the owner taking responsibility for expenses relating to the alteration, and building rules on work hours and elevator use shape the schedule.

Asbestos

Survey & abatement

If the survey finds asbestos in the materials being disturbed, licensed abatement comes before demolition — a separate contractor and a separate line item.

(07) — Common questions

Answers before you ask.

It depends on which trades the work touches. The City of Vancouver requires a permit for renovations that move interior walls or existing plumbing, electrical or gas lines, and lists replacing fixtures, cabinets or flooring among the projects that need none. Each trade then has its own rule: an electrical permit covers all electrical work except replacing defective fuses, receptacles, switches or bulbs with units of similar type and rating; a gas permit is required for all new natural gas installations and alterations; and a plumbing permit is required to install, change or upgrade any part of the plumbing system. New cabinets in the same layout can be permit-free; moving the sink or range, adding circuits or opening a wall is not. The penalty for starting permitted work without a permit is typically double the permit fee, and the homeowner pays it. Sources: City of Vancouver, When you need a permit, Electrical permit, Get a gas permit and Plumbing permit, verified September 2026.

Yes, if the gas line changes. The City of Vancouver states that all new natural gas installations and alterations require a gas permit. The City issues that permit for fully detached homes served by a single meter at 2 psig (14 kPa) or less, and for other buildings with a meter pressure of 2 psi or less and a total connected load of 409,600 BTU/hr (120 kW) or less. For all other installations the application goes to Technical Safety BC. Source: City of Vancouver, Get a gas permit, verified September 2026.

It depends on the permit. As of September 1, 2026, the City aims to issue 95% of simple electrical permits within 5 business days and met that for 95% of applications over the previous three months; for electrical permits that need plan review the target is 95% within 25 business days, met for 93%. In June 2026 the City reported that 92% of simple renovation permits are being issued within three days. Our own analysis of the City's open data puts the median building permit issued in 2026, to late August, at 62 days from application, but that is a different clock: it counts every permit type from application to issue, so it overstates the wait for a simple kitchen job. Sources: City of Vancouver, Electrical permit and news release, June 9, 2026; City of Vancouver Open Data, analysed in our answer on Vancouver building permit times.

Often, yes. The Standard Bylaws under BC's Strata Property Act require written strata approval before an owner alters common property inside the unit or the parts of the unit the strata must insure. The City adds two rules for multi-unit buildings: a permit for drywall repairs to fire separations in multi-unit residential buildings, and, in existing buildings of five or more units, a New Electrical Load Installation (NELI) form with the electrical permit application for new or modified electrical loads in excess of 3,000 watts within a unit. Sources: Strata Property Act, Schedule of Standard Bylaws, section 5; City of Vancouver, When you need a permit and Electrical permit; verified September 2026. The full strata list is in our answer on strata approval.

The Vancouver Building By-law. The provincial BC Building Code applies across British Columbia with a few exceptions, and the City of Vancouver is one of them: the City adopts its own Building By-law under the Vancouver Charter, and it regulates design and construction as well as permitting, inspection and enforcement in the city. The most recent edition the City lists is the 2025 Vancouver Building By-law. Sources: Province of British Columbia, About the BC Building Code; City of Vancouver, Vancouver Building By-law, verified September 2026.

WorkSafeBC's guidance is yes. It tells homeowners to get their home tested for asbestos before starting a renovation or demolition project, noting that many older homes contain it in some form, and says any asbestos found must be removed or contained before the project begins. Only the areas being renovated need to be surveyed. Since January 1, 2024, asbestos abatement contractors must be licensed in BC and their workers trained and certified. Sources: WorkSafeBC, Asbestos: Frequently asked questions for homeowners and New asbestos certification and licensing requirements now in effect, verified September 2026.

Yes. Kyrax Developments Ltd. holds BC Housing Residential Builder Licence #57802, in good standing, as a General Contractor and Developer, and where a kitchen renovation needs permits they are pulled and inspected the same as any other licensed scope of work. Verify the licence on the BC Housing Licence Registry.

Yes. See bathroom renovations in Vancouver, and our condo and basement renovation pages for the rest of the Vancouver work we take on.

In practice, yes: remodel is the American word for it and renovation the one used here, and Vancouver's permit rules don't turn on which one you say. What matters is what the work touches. The City requires a permit for any new construction, including renovations to an existing building that create a new area, and for renovation projects that move interior walls or existing plumbing, electrical or gas lines; it lists replacing fixtures, cabinets or flooring among the work that needs no permit at all. Source: City of Vancouver, When you need a permit, verified September 2026.