Kyrax Developments renovates kitchens across both the Township of Langley and the City of Langley as a licensed general contractor. In both Langleys the municipality handles building and plumbing permits and Technical Safety BC, the provincial authority, handles electrical permits; the Township sends gas permits there too. We manage both sides under one accountable team.

(02) — What's included

A full kitchen renovation, start to finish.

01

Asbestos survey & demolition

The materials coming out are tested for asbestos first, as WorkSafeBC directs; then cabinets, counters, flooring and drywall come out, with debris hauled away as part of the scope.

02

Layout & walls

Opening the kitchen up is permitted work in both Langleys; the City's April 2022 alteration guide lists removing, relocating, altering or constructing interior walls as needing a building permit.

03

Plumbing

New or relocated sinks and dishwashers. The City's 2022 guide lists installing new plumbing fixtures as permitted work, and the Township requires a permit to install new fixtures or re-arrange piping.

04

Electrical & gas

New circuits, lighting and gas lines, permitted through Technical Safety BC rather than the municipality: the Township's routing for both, and the City's for electrical.

05

Cabinets, counters & finishes

Cabinets, counters, backsplash and flooring to your selections. Replacing cupboards and painting are among the minor works the City of Langley's 2022 guide says need no building permit.

06

Appliances & ventilation

Appliances installed and connected, and a range hood ducted to the outside.

(03) — Township vs City

Which permits a Langley kitchen can need.

The two Langleys agree on the big picture and differ in the detail. This is what each says on its own pages.

From each municipality's own pages and guides, read September 10, 2026. The City's guide is dated April 2022 and the Township's bulletin March 2018, so confirm anything drawn from them with the municipality. The Township's current permits page confirms the Technical Safety BC routing. “Not stated” means the pages we read don't address it.
WorkTownship of LangleyCity of Langley
Renovating or alteringPermit to alter, repair or renovate a buildingBuilding permit to repair, renovate or add to an existing building, or to remove, relocate, alter or construct interior walls
New plumbing fixturesPermit to install new fixtures or re-arrange pipingBuilding permit to install new plumbing fixtures
Replacing cabinets, paintingNot statedNo building permit (minor, non-structural modification)
Electrical permitsTechnical Safety BCTechnical Safety BC
Gas permitsTechnical Safety BCNot stated
InspectionsTechnical Safety BC electrical and gas completion forms before the Accepted Final Inspection, per the March 2018 bulletinWork proceeds only as each stage receives an accepted inspection
TradesNot statedAll contractors and trades need a valid City business licence

Sources: Township of Langley, Residential Construction Guide, Other Building Permits and Electrical & Gas Contractor Authorization bulletin (March 2018); City of Langley, Addition or Alteration to a Single-Family Dwelling guide (April 2022).

(04) — How we work

From walkthrough to final inspection.

Cabinet install and counter template
01

Jurisdiction & walkthrough

We confirm whether the address is in the Township or the City, then map the plumbing, gas and electrical runs and the walls the design touches.

02

Permits

Building and plumbing permits go to the municipality; the Township now takes applications digitally wherever that is available. Electrical permits, and in the Township gas permits, go through Technical Safety BC.

03

Survey, demolition & rough-in

Asbestos survey of the materials coming out, then demolition, then rough-ins inspected before walls close; in the City, work moves on only as each stage passes.

04

Cabinets, counters & finishes

Cabinets set and levelled, counters templated and installed, backsplash and flooring finished.

05

Appliances & final inspection

Appliances connected and final inspections booked; in the Township, Technical Safety BC's completion forms go in before the Accepted Final Inspection.

(05) — Langley considerations

What's different about a Langley kitchen.

Two Langleys

The Township of Langley and the City of Langley are separate municipalities with separate building departments and bylaws. We confirm which one the address is in before anything is designed or applied for.

Two authorities

The municipality permits the building and plumbing work; Technical Safety BC permits the electrical, and in the Township the gas as well. Vancouver works differently: there the City issues gas and electrical permits itself.

Final inspection

Where electrical or gas work was done, the Township won't grant an Accepted Final Inspection until Technical Safety BC's Electrical Contractor Authorization and Declaration and Gas Notification of Completion forms are in.

Code

Both build to the BC Building Code, which the Province applies across BC except in the City of Vancouver, some Treaty First Nations and federal lands.

(06) — What affects cost

No two kitchen renovations price the same.

We don't publish a flat price for a Langley kitchen renovation, because scope varies too much from one home to the next for a single number to be honest. These are the factors that move the estimate.

Layout

Sink and range stay or move

Keeping the sink, range and dishwasher where they are avoids plumbing permit work and new gas lines; moving them adds both.

Cabinetry

Cabinet & counter tier

Cabinetry and countertops span a wide range and usually set the budget more than any other line.

Walls

Opening a wall

Removing or moving a wall is permitted work, and a load-bearing wall needs a structural solution before it comes out.

Electrical & gas

Provincial permits

New circuits, lighting and gas lines add Technical Safety BC permits and completion paperwork alongside the municipality's.

Strata

Strata conditions

A strata can make its approval conditional on the owner taking responsibility for expenses relating to the alteration, and building rules on work hours and elevator use shape the schedule.

Asbestos

Survey & abatement

If the survey finds asbestos in the materials being disturbed, licensed abatement comes before demolition — a separate contractor and a separate line item.

(07) — Common questions

Answers before you ask.

Usually, once anything beyond the finishes changes, and in both Langleys. The Township of Langley's residential construction guide says a building permit is required to alter, repair or renovate a building and to install new plumbing fixtures or re-arrange piping. The City of Langley's April 2022 alteration guide lists repairing, renovating or adding to an existing building, removing, relocating, altering or constructing interior walls, and installing new plumbing fixtures as work that needs a building permit. Sources: Township of Langley, Residential Construction Guide: additions, alterations and accessory buildings and Residential Building Permits; City of Langley, Addition or Alteration to a Single-Family Dwelling guide (April 2022), verified September 2026.

Technical Safety BC, not the municipality, for most kitchen work. The Township of Langley's permits page says to refer to Technical Safety BC for gas and electrical permits, and its March 2018 bulletin says that the Township does not issue electrical or gas permits and does not perform electrical or gas inspections. The City of Langley's April 2022 alteration guide says required electrical permits are obtained through Technical Safety BC; the City pages we read don't address gas. Vancouver is different: there the City issues gas and electrical permits itself. Sources: Township of Langley, Other Building Permits and Electrical & Gas Contractor Authorization bulletin (March 2018); City of Langley, alteration guide (April 2022); City of Vancouver, Get a gas permit and Electrical permit, verified September 2026.

Where electrical or gas work was done, two Technical Safety BC forms, according to the Township's March 2018 bulletin. It says that from April 2, 2018, the Township requires the Electrical Contractor Authorization and Declaration and the Gas Notification of Completion, Installation or Alteration Form before it grants an Accepted Final Inspection on new homes, additions, renovations and accessory buildings. Confirm the current requirement with the Township before booking the final inspection. Source: Township of Langley, Electrical & Gas Contractor Authorization bulletin (March 2018), verified September 2026.

In the City of Langley, yes: its April 2022 alteration guide lists replacing cupboards and painting among the non-structural, minor modifications that do not need a building permit. Moving the sink, adding fixtures or changing walls is different and needs a permit in both Langleys. The Township pages we read don't list cabinet replacement either way, so confirm with the Township for a Township address. Sources: City of Langley, Addition or Alteration to a Single-Family Dwelling guide (April 2022); Township of Langley, Residential Construction Guide, verified September 2026.

The BC Building Code, in both the Township and the City. The Province states that the code applies to all buildings in B.C. except in the City of Vancouver, Treaty First Nations that do not reference it in their agreements, and federal lands, and the City of Langley's April 2022 alteration guide asks for plans detailed enough to establish compliance with the BC Building Code and City bylaws. Sources: Province of British Columbia, About the BC Building Code; City of Langley, alteration guide (April 2022), verified September 2026.

Often, yes. The Standard Bylaws under BC's Strata Property Act require written strata approval before an owner alters common property inside the unit or the parts of the unit the strata must insure. That rule is provincial, so it applies the same way in both Langleys. Source: Strata Property Act, Schedule of Standard Bylaws, section 5, verified September 2026. The full list is in our answer on strata approval.

WorkSafeBC's guidance is yes. It tells homeowners to get their home tested for asbestos before starting a renovation or demolition project, noting that many older homes contain it in some form, and says any asbestos found must be removed or contained before the project begins. Only the areas being renovated need to be surveyed. Since January 1, 2024, asbestos abatement contractors must be licensed in BC and their workers trained and certified. Sources: WorkSafeBC, Asbestos: Frequently asked questions for homeowners and New asbestos certification and licensing requirements now in effect, verified September 2026.

Yes. Kyrax Developments Ltd. holds BC Housing Residential Builder Licence #57802, in good standing, as a General Contractor and Developer, and where a kitchen renovation needs permits they are pulled and inspected the same as any other licensed scope of work. Verify the licence on the BC Housing Licence Registry.