Custom Home Builder in Delta, BC
Kyrax Developments builds custom homes in Delta as a BC Housing licensed residential builder, licence #57802. Delta takes a new-house application online only, in two steps, and reviews it once both are done. Its bylaws set a minimum floor elevation for the whole city and its community plan sets a higher one in parts of Ladner and Tsawwassen; a lot near a stream, slough or ditch or in a hazard area can need a development permit first; and replacing a house means demolition inspections in a fixed order and, where the old connections are more than 25 years old, new water and sewer services.
A custom home, DeltaMap to occupancy.
Lot & elevations
The development permit areas, flood elevation and covenants for the lot, with the minimum building elevation carried onto the plans.
Licence & warranty
The home registered with BC Housing by a licensed residential builder, with the warranty documents Delta asks for at permit pickup.
Application
The DeltaOnline application and fee, then the plans, surveys and reports uploaded to the ePlan portal.
Demolition & services
Tree protection and service capping inspections, rodent abatement, and new connections to the mains where the old ones are past 25 years.
Step 3 build
Energy modelling, Step Code work inspected, and Technical Safety BC permits in hand by the framing inspection.
Final & occupancy
The final inspection, the occupancy permit, and the old house removed on time if the family lived in it during the build.
What Delta asks for, stage by stage.
Delta’s gates for a new house are an online application in two steps, a floor set above the flood level the lot is in, a development permit where the lot sits in a streamside or hazard area, and demolition inspections before the old house comes down.
| Stage | What Delta requires | Where it says so |
|---|---|---|
| Applying | Online only, in two steps: the application and its fee on DeltaOnline, then the plans to the ePlan portal; review starts once both are done | eApply Guide, September 2025; How to Apply |
| Fees | $475 application fee for small-scale residential construction, then a building permit fee scaled to the value of the work, paid within 60 days of the ready notice | Fees and Charges Bylaw 8386, Schedule 3; Building/Plumbing Bylaw 8065 s.11.3 |
| Title, survey & reports | A title search made within 30 days; a topographical site plan sealed by a BC Land Surveyor or civil engineer; EnerGuide and HOT2000 reports; an arborist report where trees may be affected; a geotechnical report on a steep slope | Bylaw 8065 s.7.1.3; eApply Guide |
| Engineering | Letters of assurance for engineered designs, including geotechnical ones for fill compaction, excavations deeper than 1.2 m and soft soil | eApply Guide |
| Licence & warranty | Home warranty insurance and a licensed residential builder, or an owner builder, before a permit for a new home; warranty documents at permit pickup | Homeowner Protection Act s.30(1); eApply Guide |
| Floor elevation | 1.6 m G.S.C. datum for space used for occupancy, business or storage of goods; a garage, carport or storage shed serving a house is exempt | Bylaw 8065 ss.5.6 and 5.6.1 |
| Higher flood levels | 2.9 m GSC in LV2 south of 44th Avenue and east of the Chilukthan Slough, SD1-B north of 17A Avenue, and SD3 on the Boundary Bay Foreshore and the Southlands, with land around construction at 2.3 m there; a flood covenant in each | OCP 2024, Appendix B |
| Covenants | A low-lying or waterfront property without a flood covenant may have to enter into one at building permit | Development Considerations |
| Development permits | No single family exemption in LV2, LV6, SD2, SD3, ND1, ND10 or the streamside area within 30 m of a stream, river, slough, ditch or pond; sloped lands areas need one for any building that needs a building permit; $2,970 for environmental and hazardous conditions | OCP 2024 Appendix B; Development Considerations; sloped lands guide; Fees Bylaw Schedule 6 |
| Energy | Step 3 and EL-1, the provincial minimums; Step Code work is inspected | Bulletin B23-01; Zero Carbon Step Code; Bylaw 8065 s.15.4.10 |
| EV charging | At least one Level 2 outlet or charger, under the Zoning Bylaw | eApply Guide |
| Demolition | The permit, a highway use permit check, and tree protection and service capping inspections passed, in that order, before demolition; a rodent abatement declaration before the permit issues | Demolition guide and form, May 2024; Rodent declaration; Building and Renovating |
| Old services | Construction over $250,000 with any connection over 25 years old: new services from the property line to the mains, the road work built by the City at the owner’s cost | Standards Bylaw 8288 s.5.7 |
| Connection fees | Water service of 19 mm or less with meter chamber $6,800; sanitary of 100 mm or less $8,900; storm of 100 mm or less $5,600 | Water Service Bylaw 7441 and Sewer Rates Bylaw 5782, Schedule A |
| Pumped drainage | A pumped system where gravity connection isn’t possible, with a covenant against occupancy until it works | Bylaw 8065 ss.23.1 and 23.6 |
| Development cost charges | $19,844 per dwelling unit for single family, duplex and triplex development from January 1, 2026, paid before the permit issues; not payable on work of $50,000 or less, units of 29 m² or less, or development with no new capital cost burden | DCC Bylaw 7560 ss.5, 6 and 8 and Schedule A; Bylaw 8527 |
| Permit fee rebate | 100% off the building permit fee for a house with an accessory dwelling unit, a duplex or a houseplex, to May 5, 2028; a house without one is not eligible | Fees Bylaw 8386, Schedule 14 |
| Driveway & road | One driveway access per single detached lot; a highway use permit for driveway construction and for construction that needs access from the road | Your Property; Highway Use Permit; Highways Bylaw 8452 |
| Trees | Protected from 20 cm at 1.4 m; no heavy equipment, parking or machine digging inside the drip line; barrier at the drip line or six times the diameter; $700 security per replacement tree; permits issue after the tree protection inspection | Tree Protection and Regulation Bylaw 7969; Trees |
| Gas & electrical | Technical Safety BC permits, with proof shown at the framing inspection | Building and Renovating |
| Permit life | May be terminated if work is not started within six months, six months pass after the last accepted inspection, or the work is unfinished after two years; extensions of up to the same period | Bylaw 8065 ss.10.4 and 10.8 |
| Living in the old house | Allowed in A1 and residential zones other than RSF, under a covenant with security, with demolition within 30 days of the new occupancy permit | Zoning Bylaw 7600 s.6.1.6 |
| Construction hours | 7 a.m. to 7 p.m. weekdays and 9 a.m. to 5 p.m. Saturdays; none on Sundays or holidays | Noise Control Bylaw 1906 s.8 |
Sources: City of Delta, eApply Guide, How to Apply, Building and Renovating, Development Considerations, Delta Building/Plumbing Bylaw No. 8065, 2021, OCP 2024, Appendix B, the sloped lands guide, Delta Consolidated Fees and Charges Bylaw No. 8386, 2024, Development Application Procedures Bylaw No. 8347, the demolition guide and form, the rodent declaration, Development and Subdivision Standards Bylaw No. 8288, 2024, Water Service Bylaw No. 7441, 2016, Sewer Rates Bylaw No. 5782, 2000, Development Cost Charges Bylaw No. 7560, 2017, Bylaw No. 8527, Your Property, Highway Use Permit, Highways Bylaw No. 8452, 2026, Tree Protection and Regulation Bylaw No. 7969, 2021, Trees, Zoning Bylaw No. 7600, 2017, the inspections guide, Noise Control Bylaw No. 1906, 1972 and Green Building; Province of British Columbia, Bulletin B23-01, Zero Carbon Step Code, Part 9 checklists and Homeowner Protection Act; BC Housing, Register a New Home.
From DeltaMap to occupancy.
Lot check
Development permit areas, the flood elevation and covenants on title, the age of the water and sewer connections, and the trees.
Design & registration
Drawings with the minimum building elevation, the survey, energy and arborist reports, any development permit, and the home registered with BC Housing.
Two-step application
The DeltaOnline application and fee, the plans on the ePlan portal, and the permit fee paid when the City says the permit is ready.
Demolition & services
Rodent abatement, tree protection and service capping inspections, demolition, and new services to the mains where required.
Build & occupancy
Inspections booked through eInspections, Step Code work checked, the final inspection, and the occupancy permit.
What sets building in Delta apart.
A 1.6 m minimum building elevation everywhere, 2.9 m in three mapped areas of Ladner and Tsawwassen, and covenants that acknowledge flooding.
Within 30 m of a stream, slough, ditch or pond, the single family exemption from a development permit does not apply.
A build over $250,000 on a lot with any connection older than 25 years brings new services out to the mains.
A house with an accessory dwelling unit qualifies for a full building permit fee discount until May 5, 2028; one without does not.
Why a Delta build has no set price.
We don't publish a price per square foot for a Delta custom home, because the lot’s elevation, servicing and trees move the number too far for a single figure to be honest. These are the factors that move it.
Raising the floor
Fill, foundation height and grading to meet the minimum building elevation the lot is in.
Development permit areas
A streamside, flood or slope development permit, with the reports that go with it.
New connections
Water, sanitary and storm connections replaced to the mains, and a pump where gravity won’t reach the sewer.
Development cost charges
The City’s charge per dwelling unit, and whether its exemptions apply to the lot.
Protection & replacement
Barriers, arborist work, and a security for each replacement tree.
A suite or not
An accessory dwelling unit that changes both the plans and the permit fee.
Answers before you ask.
Yes, unless you build it yourself as an owner builder. Under the Homeowner Protection Act, a municipality must not issue a building permit for a proposed new home unless the applicant shows that it is covered by home warranty insurance and will be built by a licensed residential builder, or that it will be built by an owner builder. BC Housing says a New Home Registration Form is that proof of licensing and home warranty insurance, and Delta’s guide for a new detached house or duplex lists the warranty documents as required at permit pickup. Kyrax Developments Ltd. holds BC Housing Residential Builder Licence #57802, in good standing, as a General Contractor and Developer; verify it on the BC Housing Licence Registry. We also build custom homes in Surrey, Langley, Burnaby, Abbotsford and Vancouver. Sources: Province of British Columbia, Homeowner Protection Act, section 30(1); BC Housing, Register a New Home; City of Delta, eApply Guide for a residential detached or duplex dwelling (September 2025), verified September 2026.
Online, in two steps. Delta’s September 2025 guide says paper and email applications are no longer accepted: the application is completed and its fee paid on DeltaOnline, the plans are uploaded to the ePlan portal, and the application is reviewed only once both steps are done, after which the City emails the name of the assigned plans examiner. The package includes a topographical site plan signed and sealed by a BC Land Surveyor or civil engineer, the energy advisor’s EnerGuide and HOT2000 reports, an arborist report where trees on or next to the site may be affected, and a geotechnical report on a steep slope; engineered designs carry letters of assurance, including geotechnical ones for fill compaction, excavations deeper than 1.2 m and soft soil. The Building/Plumbing Bylaw adds a title search made within 30 days of the application. The application fee for small-scale residential construction is $475, and the building permit fee, scaled to the value of the work, must be paid within 60 days of the City’s notice that the permit is ready or the application may be cancelled. Sources: City of Delta, eApply Guide (September 2025), How to Apply, Delta Building/Plumbing Bylaw No. 8065, 2021, sections 7.1.3 and 11.3, and Delta Consolidated Fees and Charges Bylaw No. 8386, 2024, Schedule 3, verified September 2026.
At least 1.6 metres geodetic across the city, and 2.9 metres in three mapped areas. Delta’s Building/Plumbing Bylaw sets the minimum building elevation for any space used for human occupancy, business or the storage of goods at 1.6 m G.S.C. datum, measured at the underside of the structural floor or the top of the slab, with exemptions that include a garage, carport or storage shed serving a house. The Official Community Plan sets 2.9 m in the Chilukthan Slough and Ladner Canal area south of 44th Avenue and east of the slough (LV2), at the Entrance to Tsawwassen north of 17A Avenue (SD1-B), and on the Boundary Bay Foreshore and the Southlands (SD3), where the land around construction must also be at least 2.3 m; each calls for a covenant acknowledging that the land may flood. The City says a low-lying or waterfront property without such a covenant may have to enter into one at building permit, shows flood elevations on DeltaMap, and its guide wants the minimum building elevation and floor elevations on the plans. Sources: City of Delta, Delta Building/Plumbing Bylaw No. 8065, 2021, section 5.6, OCP 2024, Appendix B, Development Considerations and the eApply Guide, verified September 2026.
It depends on where the lot is. Delta’s Official Community Plan exempts single family residential development from a development permit in its designated areas, except LV2, LV6, SD2, SD3, ND1 and ND10, provided the area’s floodproofing, environmental protection and covenant requirements are met, but that exemption does not apply in the Streamside Protection and Enhancement Area, which the City says takes in any property within 30 m of a stream, river, slough, ditch or pond. In its sloped lands development permit areas, the City’s guide says a development permit is required for any building or structure that needs a building permit, with narrow exceptions. An environmental and hazardous conditions development permit costs $2,970, and Delta’s procedures bylaw delegates issuing a development permit with no or only minor variances to the General Manager. The City points owners to DeltaMap to check whether a property is in a development permit area. Sources: City of Delta, OCP 2024, Appendix B, Development Considerations, the sloped lands development permit guide, Delta Consolidated Fees and Charges Bylaw No. 8386, 2024, Schedule 6, and Development Application Procedures Bylaw No. 8347, verified September 2026.
Step 3 of the BC Energy Step Code and emissions level EL-1, the provincial minimums. The Province made Step 3 the minimum standard for Part 9 homes everywhere from May 1, 2023, so local governments no longer have to adopt it by bylaw, and it has required most new buildings to meet or exceed EL-1 since March 10, 2025. Delta’s Building/Plumbing Bylaw lists work covered by the Energy Step Code among the items a Building Official inspects, and the City’s guide asks for an energy advisor’s EnerGuide and HOT2000 reports with the application. The City’s Green Building page still describes the Step Code as voluntary in Delta, which is out of date. The Province says a mid-construction airtightness test is not required across BC and that local building departments may require one, so we confirm Delta’s requirements for each permit. Sources: Province of British Columbia, Bulletin B23-01, Zero Carbon Step Code and Part 9 checklists; City of Delta, Delta Building/Plumbing Bylaw No. 8065, 2021, section 15.4.10, the eApply Guide and Green Building, verified September 2026.
A permit and inspections in a fixed order. Delta’s demolition guide says that before demolishing you must have the demolition permit, determine whether a highway use permit is needed, protect the trees on site and cap the service connections at the property line, with an inspection for each of the last two. The permit form sets the order: tree protection first, then the capping of services, marked with blue, red and green stakes for water, sanitary and storm, and the City’s Building and Renovating page says demolition cannot take place until both inspections have passed. The permit holder must also carry out rodent abatement, with a declaration from a licensed pest control company, before the demolition permit is issued. The guide lists WorkSafeBC’s safe work practices for handling asbestos among its resources. Sources: City of Delta, the residential demolition permit guide and form (May 2024), the Rodent Inspection and Control Declaration and Building and Renovating, verified September 2026.
When the build is valued over $250,000 and any existing connection is more than 25 years old. Delta’s Development and Subdivision Standards Bylaw says the owner then installs new services from the property line to the mains, with the work within the road built by the City at the owner’s cost. The 2026 connection fees are $6,800 for a water service of 19 mm or less, including the meter chamber, $8,900 for a sanitary connection of 100 mm or less and $5,600 for a storm connection of 100 mm or less. Where a lot can’t reach the sewer by gravity, the Building/Plumbing Bylaw requires a pumped system maintained by the owner and a covenant that the house cannot be occupied unless the pump is installed and in good working order. Sources: City of Delta, Delta Development and Subdivision Standards Bylaw No. 8288, 2024, section 5.7, Delta Water Service Bylaw No. 7441, 2016, Schedule A, Delta Sewer Rates Bylaw No. 5782, 2000, Schedule A, and Delta Building/Plumbing Bylaw No. 8065, 2021, sections 23.1 and 23.6, verified September 2026.
Delta’s bylaw charges a building permit for a building that will contain one or more dwelling units, and for single family, duplex and triplex development the rate since January 1, 2026 is $19,844 per dwelling unit, paid after the building permit application and before the permit is issued. The charge is not payable where the work is valued at $50,000 or less, where the dwelling unit is no larger than 29 m², where a development imposes no new capital cost burden on the City, or where charges were already paid for the development and further development adds no new burden. We confirm with the City how those exemptions apply to a house that replaces one on the same lot before budgeting. Sources: City of Delta, Delta Development Cost Charges Bylaw No. 7560, 2017, sections 5, 6 and 8 and Schedule A, as amended by Bylaw No. 8527, adopted October 6, 2025, verified September 2026.
Yes, while the federal funding lasts. Delta’s Housing Accelerator permit rebate began May 6, 2025 and is scheduled to end May 5, 2028. It gives a 100% discount on the building permit fee for a single detached house with an accessory dwelling unit, such as a secondary suite, garden suite or coach house, and for duplexes and houseplexes; a single detached house without one is not eligible. Plumbing permit and inspection fees are not discounted, the 2% heritage conservation levy on the building permit fee is discounted only for non-market and purpose-built rental housing, and the City says the program will cease without notice if its Housing Accelerator Fund money stops. Sources: City of Delta, Delta Consolidated Fees and Charges Bylaw No. 8386, 2024, Schedules 3 and 14, verified September 2026.
Any tree with a trunk of 20 cm or more at 1.4 m, and any replacement tree. During building permit work, Delta’s Tree Protection and Regulation Bylaw bars heavy equipment, parking except on existing paving, and digging except by hand for approved services inside a tree’s drip line, and a protective barrier must reach the drip line or six times the trunk diameter, whichever is greater. A tree may be removed where it stands in the footprint of a house, service, driveway or parking area that the City determines cannot be modified to keep it. Outside Sunshine Hills, a removed tree of 20 to 59 cm is replaced with two trees on site and one of 60 cm or more with three, with a $700 security for each replacement tree, and a tree permit is valid for six months. The City’s Trees page says demolition and building permits are issued only after a successful inspection of the tree protection, and bylaw changes effective June 16, 2026 require an arborist report for every tree removal in Sunshine Hills. Sources: City of Delta, Delta Tree Protection and Regulation Bylaw No. 7969, 2021, sections 3.1, 4.2 and 6.6 and Schedules A to C, and Trees, verified September 2026.
On our projects, a custom home runs 12 to 18 months from permit to handover. That is our own clock, and it starts once the permit is in hand. After that, Delta’s Building/Plumbing Bylaw lets a Building Official terminate a permit if work does not start within six months of issue, if six months pass after the most recent accepted inspection, or if the work is not finished within two years, though the official may instead extend the period by up to the same length. Inspections are requested online through eInspections up to five days ahead, and construction that disturbs the neighbourhood is barred before 7 a.m. and after 7 p.m. on weekdays, before 9 a.m. and after 5 p.m. on Saturdays, and at any time on Sundays and holidays. Sources: City of Delta, Delta Building/Plumbing Bylaw No. 8065, 2021, sections 10.4 and 10.8, Building and Renovating and Delta Noise Control Bylaw No. 1906, 1972, section 8, verified September 2026.
In most residential zones, yes, on conditions. Delta’s Zoning Bylaw lets an owner keep living in an existing house while a new one is built on the same lot under a valid building permit, in the A1 zone and any residential zone other than RSF, until the new house receives its occupancy permit. The conditions include a Section 219 covenant, signed before the building permit is issued and backed by a security deposit, that the old house will be demolished or removed at the owner’s expense, and that authorizes the City to do it if that isn’t done within 30 days of the new house’s occupancy permit. A final inspection comes before anyone moves in, and the Building/Plumbing Bylaw ties the occupancy permit to accepted inspections and to the electrical and gas permits, which in Delta come from Technical Safety BC. Sources: City of Delta, Delta Zoning Bylaw No. 7600, 2017, section 6.1.6, Delta Building/Plumbing Bylaw No. 8065, 2021, section 16.3, the inspections guide and Building and Renovating, verified September 2026.
Ready to build your home?
We start with a walkthrough, a scope document, and a straight answer on which permits and approvals apply. Initial consultations are complimentary.
Start a project