(01) — Home Renovations

Home Renovations in Burnaby, BC

Kyrax Developments renovates homes across Burnaby as a licensed general contractor, from interior alterations to additions. Burnaby sorts the work into alterations, additions and restorations, each with its own permit path, and its noise and tree bylaws shape when and how the work can happen.

(02) — What's included

A whole-home renovation, permit to final.

01

Alterations

Interior and exterior changes that add no floor area: moved walls, new bathrooms, reworked kitchens and secondary suites, all permitted work in Burnaby.

02

Additions

New floor area and a changed footprint, including decks, patio covers and attached garages, with a development permit first where the City requires one.

03

Restorations

Repairs after fire, flood or another disaster, including roofs, foundations and structure, applied for in person at City Hall.

04

Records & drawings

The City's records of past permits for the house, then drawings that meet the BC Building Code and the R1 district of the Zoning Bylaw.

05

Trades

Plumbing, electrical and gas under the City's own trade permits for single-family homes and duplexes, inspected before anything is covered.

06

Trees & site

Protected-tree checks before any work near a tree, and the geotechnical, streamside or heritage steps when a property is flagged.

(03) — Burnaby permits

Three permit paths for a Burnaby home.

Burnaby decides the path by what the work does to the building: whether it adds floor area, changes the footprint, or repairs damage.

As the City of Burnaby states them, read September 11, 2026. Since July 1, 2026, some projects need a development permit before a building permit can be submitted or issued.
WorkPermit pathSource
Alterations: changes with no new floor area, inside or out, including a new bathroom, moved walls or a secondary suiteBuilding permit, applied for online through the My Permits PortalHome Improvement Permits
Additions: any change to the footprint or floor area, including decks, patio covers, awnings, fences, retaining walls, hot tubs and attached garagesBuilding permit online; a development permit may also be requiredHome Improvement Permits
A detached garage or new accessory buildingTreated as a new buildingHome Improvement Permits
Restorations: repairs after fire, flood or other disaster, including roofs, foundations and structureBuilding permit, applied for in person at City Hall and issued on paperGeneral Building Information
Minor works: replacing fixtures, cabinets and flooring, painting inside, minor non-structural outside repairsNo permitHome Improvement Permits
Plumbing, electrical and gas in a single-family home or duplexCity trade permits, several of which can be applied for onlineResidential Trade Permits

Sources: City of Burnaby, Home Improvement Permits, General Building Information and Residential Trade Permits.

(04) — How we work

From walkthrough to final inspection.

Addition framing before inspection
01

Records & feasibility

We request the City's records of past permits and drawings for the house, and check the lot for heritage, streamside, floodplain or slope flags that add steps.

02

Drawings & application

Drawings to the BC Building Code and the R1 district, sealed structural drawings where structure changes, and the application through the City's My Permits Portal.

03

Review & permit

Plan review, a development permit first where the City requires one, and the permit issued digitally once every requirement and fee is met.

04

Construction on site

The printed permit posted on site and a full-size colour set of approved drawings kept there, with work inside the noise bylaw's hours.

05

Inspections & final

Trade and building inspections at each stage, and the final inspection that closes the permit.

(05) — Burnaby considerations

What's different about a Burnaby renovation.

Sunday work

Burnaby bars construction on Sundays and statutory holidays, except that the registered owner and occupier of a home may have alteration or repair work done on it, personally or through a contractor, from 9 a.m. to 8 p.m. on those days.

Trees under a permit

A building permit application counts as a development application under the Tree Bylaw, which lowers the protected size to 20.3 cm in diameter for every tree on the lot. Tree plans come before demolition, not after.

New rules in 2026

Burnaby moved to digital-only permits for applications from January 1, 2026, adopted a new Zoning Bylaw on July 1, 2026, and now requires some projects to get a development permit before a building permit.

Flagged properties

A property flagged for heritage or archaeology, a streamside area, a floodplain or unstable slopes needs extra reports or permits before the building permit, which is why the flags are checked first.

(06) — What affects cost

No two renovations price the same.

We don't publish a flat price for a Burnaby renovation, because scope varies too much from one home to the next for a single number to be honest. These are the factors that move the estimate.

Path

Alteration or addition

An addition brings extra submission items, and sometimes a development permit, that an alteration doesn't.

Structure

Engineering

Moving load-bearing walls or adding floor area needs sealed structural drawings and an engineer's field reviews.

Site

Property flags

Geotechnical reports, streamside permits and heritage checks add consultants and time where a lot is flagged.

Trees

Tree permits

Removing a protected tree takes a permit and replacement planting, and on a lot under a building permit more trees count as protected.

Energy

Step Code documents

Adding a dwelling unit brings Energy Step Code checklists and energy modelling into the application.

Permits

Permit & inspection fees

Building and trade permit fees come from the City's fee schedule, and they grow with the scope of the work.

(07) — Common questions

Answers before you ask.

For anything beyond minor works, yes. The City of Burnaby requires a permit for any construction project that includes the excavation, erection, enlargement, alteration, removal, fire repair or demolition of a building or structure, including accessory buildings. Minor works such as replacing fixtures, cabinets and flooring, painting inside, or minor non-structural repairs outside don't need one. The City sorts permitted work into alterations, additions and restorations. Source: City of Burnaby, Home Improvement Permits, verified September 2026.

An alteration changes an existing building without creating floor area, such as interior or exterior changes, adding a bathroom, moving walls or adding a secondary suite. An addition is any change to the footprint or increase in floor area, including expanding garages, awnings, patio covers, fences, retaining walls, decks and hot tubs; an attached garage is an addition, while a detached garage or a new accessory building counts as a new building. Both are applied for online, and the City notes that an addition may also need a development permit. Source: City of Burnaby, Home Improvement Permits, verified September 2026.

Under Burnaby's Noise or Sound Abatement Bylaw, construction, alteration or repair work may run from 7 a.m. to 8 p.m. on weekdays and 9 a.m. to 8 p.m. on Saturdays, and not at all on Sundays or statutory holidays. The exception is the registered owner and occupier of a home in a residential district, who may have alteration or repair work done on that home, personally or through a contractor, from 9 a.m. to 8 p.m. on Sundays and statutory holidays. The City can vary the hours by written permit where compliance is impractical. Source: City of Burnaby, Noise or Sound Abatement Bylaw 1979, section 15, verified September 2026.

Only for a protected tree, but a renovation lowers the bar. Burnaby's Tree Bylaw protects conifers of 30.5 cm and broadleaf trees of 45.7 cm in diameter or more on an ordinary lot, but on a property with a development application, which the bylaw defines to include a building or demolition permit application, it protects any tree of 20.3 cm or more. Cutting down or damaging a protected tree needs a tree cutting permit, replacement trees are a condition of those permits, and the City's bird nesting season runs March 15 to August 15. Sources: City of Burnaby, Burnaby Tree Bylaw 1996, sections 2 and 3, and Tree Removal & Replacement, verified September 2026.

For additions and alterations to an existing single-family home or duplex, the City's intake checklist asks for a current land title search with any restrictive covenants, an owner's undertaking signed by all owners, records of any existing City permits and drawings for the house, and drawings that comply with the BC Building Code and the R1 district of the Zoning Bylaw in its entirety. Structural drawings sealed by an engineer are needed where structure changes, and a heritage and archaeology checklist where the property is flagged. Source: City of Burnaby, R1 Additions and Alterations submission checklist (revised July 2026), verified September 2026.

On top of the alteration list, the City's checklist asks an addition for a reduced site plan, a streamside development permit before the building permit if the property is in a streamside protection area, a geotechnical report if it is flagged for floodplain or slope instability, and an engineer's checklist and diagram of clearances from existing BC Hydro overhead lines. Adding a dwelling unit also brings Energy Step Code documents. Source: City of Burnaby, R1 Additions and Alterations submission checklist (revised July 2026), verified September 2026.

Those are restorations. The City says repairs to a building damaged by fire or another disaster may need a building permit, and repairs to roofs, foundations and structure require one. Restoration permits are applied for in person at City Hall, and they are one of the few applications Burnaby still takes and issues on paper. Sources: City of Burnaby, Home Improvement Permits and General Building Information, verified September 2026.

Burnaby now issues residential building permits digitally, but the applicant must print the City-issued permit and keep it posted in a conspicuous place on site for the duration of the work, and keep a full-size colour set of the City-approved, stamped drawings on site at all times for inspections. Source: City of Burnaby, General Building Information, verified September 2026.

On our projects, a bathroom renovation runs 4 to 8 weeks and a basement finished as a recreation room 6 to 10 weeks, measured from demolition. That is our own clock; the Burnaby permit pages we read give no processing time for renovation permits, and since July 1, 2026 some projects need a development permit before the building permit can be submitted or issued. Source: City of Burnaby, General Building Information, verified September 2026.

Yes. Kyrax Developments Ltd. holds BC Housing Residential Builder Licence #57802, in good standing, as a General Contractor and Developer. On a Burnaby renovation that means a single contract for the whole job: we pull the permits, coordinate the trades and book the inspections, and permitted work is inspected the same as any other licensed scope of work. Verify the licence on the BC Housing Licence Registry.

Yes. Bathroom renovations in Burnaby covers the City's trade permits for a bathroom, and basement suites in Burnaby covers the suite rules in the new Zoning Bylaw.

Ready to renovate your home?

We start with a walkthrough, a scope document, and a straight answer on which permits and approvals apply. Initial consultations are complimentary.

Start a project